United States (adopted by reference through NFPA 101, NFPA 99, NFPA 70, building and fire codes); used internationally by owners and insurers

NFPA 110-2025 Standard for Emergency and Standby Power Systems

68 controls. 5 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

68 controls 5 frameworks share controls with it United States (adopted by reference through NFPA 101, NFPA 99, NFPA 70, building and fire codes); used internationally by owners and insurers verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
1Chapter 1 Administration (scope, purpose, application, equivalency)0
3Chapter 3 Definitions0
4.14.1 EPSS supply by class and type5
4.44.4 Level 1 and Level 2 systems2
5.15.1 Energy sources1
5.2.15.2.1 Energy converters: general and prototype provisions0
5.2.25.2.2 Rotating equipment prototype testing0
5.2.35.2.3 Level 1 converter design and testing for abnormal conditions0
5.2.45.2.4 EPS types0
5.2.55.2.5 Installation to NFPA 70, field labeling and fuel cells0
5.35.3 Temperature maintenance of the energy converter1
5.45.4 Energy converter capacity5
5.5.15.5.1 Dedicated fuel supply for Level 11
5.5.25.5.2 Low-fuel sensing0
5.5.35.5.3 Main fuel tank capacity3
5.6.1-5.6.25.6.1 and 5.6.2 Prime mover compliance and derating1
5.6.105.6.10 Miscellaneous rotating equipment requirements0
5.6.3.1-5.6.3.25.6.3.1 and 5.6.3.2 Governors and solenoid valves2
5.6.3.3-5.6.3.65.6.3.3 to 5.6.3.6 Prime mover instruments, panel wiring and charging alternator0
5.6.4.1-5.6.4.25.6.4.1 and 5.6.4.2 Starting systems and cranking cycle1
5.6.4.3-5.6.4.55.6.4.3 to 5.6.4.5 Starting batteries: number, size and type1
5.6.4.6-5.6.4.75.6.4.6 and 5.6.4.7 Automatic battery chargers4
5.6.5.1-5.6.5.45.6.5.1 to 5.6.5.4 Control panel, safety shutdowns and alarms2
5.6.5.5-5.6.5.75.6.5.5 to 5.6.5.7 Shutdown damper monitoring, panel approval and start initiation0
5.6.5.85.6.5.8 Remote emergency stop0
5.6.5.95.6.5.9 Level 1 start-signal circuit supervision1
5.6.65.6.6 Remote controls, alarms and annunciation4
5.6.75.6.7 Prime mover cooling systems0
5.6.8-5.6.95.6.8 and 5.6.9 Exhaust piping, generator, exciter and voltage regulation0
5.75.7 Fuel cell system equipment0
6.16.1 Transfer switch equipment: general4
6.2.1-6.2.46.2.1 to 6.2.4 ATS operation, source monitoring, interlocking and manual operation3
6.2.11-6.2.136.2.11 to 6.2.13 Exercise timer, test switch and position indication2
6.2.14-6.2.166.2.14 to 6.2.16 Motor load transfer, neutral isolation and nonautomatic switches2
6.2.5-6.2.106.2.5 to 6.2.10 ATS time delays4
6.36.3 Requirements for paralleled generator sets3
6.46.4 Bypass-isolation switches2
6.56.5 Protection5
7.17.1 Installation: general1
7.107.10 Exhaust system2
7.117.11 Protection of the EPS room2
7.127.12 Distribution2
7.13.1-7.13.37.13.1 to 7.13.3 Installation acceptance: general4
7.13.47.13.4 Conduct of the on-site acceptance test3
7.27.2 Location4
7.37.3 Lighting at the EPS location2
7.4-7.67.4 to 7.6 Mounting, vibration and noise1
7.77.7 Heating, cooling and ventilating3
7.87.8 Installed EPS cooling system0
7.97.9 Fuel system2
8.1.1-8.1.28.1.1 and 8.1.2 Basis of the maintenance and testing programme4
8.1.38.1.3 Reliability-centered maintenance0
8.28.2 Manuals, special tools and spare parts2
8.3.1-8.3.28.3.1 and 8.3.2 Maintenance objective and start of the programme2
8.3.38.3.3 Written maintenance and testing schedule2
8.3.4-8.3.5Transfer switch and paralleling gear maintenance1
8.3.68.3.6 Starting and control battery maintenance3
8.3.78.3.7 Fuel quality testing1
8.4.18.4.1 Weekly or monthly inspection and monthly exercise4
8.4.28.4.2 Monthly exercise loading and duration2
8.4.2.38.4.2.3 Annual supplemental load test2
8.4.3-8.4.58.4.3 to 8.4.5 Test initiation, cold starts and time delay settings1
8.4.68.4.6 Monthly transfer switch operation1
8.4.78.4.7 Circuit breaker exercising1
8.4.88.4.8 Oversight by a properly instructed person2
8.4.98.4.9 Level 1 36-month test2
8.58.5 Records4
introStatus of NFPA 110 (2025 edition) and related instruments0

Tell me when NFPA 110-2025 Standard for Emergency and Standby Power Systems files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for NFPA 110-2025 Standard for Emergency and Standby Power Systems, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.