AS/NZS 3010:2017 Electrical Installations Generating Sets

57 controls. 1 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

57 controls 1 frameworks share controls with it Australia and New Zealand verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
1.11.1 Scope0
1.21.2 Application: AS/NZS 3000 plus this Standard, with distributor and regulator requirements checked first0
1.3-1.51.3 Referenced documents, 1.4 Definitions, 1.5 Symbols0
2.1.1-2.1.22.1.1 Scope of Section and 2.1.2 Rating classifications0
2.1.32.1.3 Selection of generating set rating from load characteristics1
2.1.42.1.4 Same system of supply whatever the source0
2.102.10 Lightning protection of generating set installations0
2.11-2.122.11 Sets as normal supply to a main switchboard and 2.12 sets connected as an alternative supply0
2.22.2 Location of generating sets: exhaust, weather, hazardous areas and fuel fire risk1
2.3.12.3.1 Protection from mechanical damage0
2.3.22.3.2 Protection from moving parts0
2.3.32.3.3 Protection against thermal effects above 120 C0
2.3.42.3.4 Protection against fuel leakage1
2.4.12.4.1 Control of the generating set1
2.4.22.4.2 Prime mover isolating device to prevent starting during work1
2.4.2.12.4.2.1 Operation of the prime mover isolating device0
2.4.2.22.4.2.2 Location and securing of the isolating device0
2.4.32.4.3 Synchronization with the network or other sets1
2.4.42.4.4 Starting batteries and battery charging1
2.5(a)-(c)2.5 Earthing arrangements (a) to (c): one MEN connection at the main switchboard0
2.5(d)-(e)2.5 Earthing arrangements (d) and (e): no parallel neutral and earth; no electrode at the set0
2.5(f)-(g)2.5 Earthing arrangements (f) and (g): changeover preserves installation functions; NZ main switchboard connection0
2.6.1.12.6.1.1 Installation to AS/NZS 3000 and generator switchboards for multiple sets0
2.6.1.22.6.1.2 Isolation from the normal supply system and approval for parallel running1
2.6.1.32.6.1.3 Generator neutral treated as a live conductor0
2.6.22.6.2 Overcurrent protection of outgoing circuits from the set1
2.6.32.6.3 Generator output isolator switching all live conductors0
2.7.12.7.1 Changeover devices for alternative (standby) supply and back-feed prevention1
2.7.102.7.10 Changeover switching in the generator neutral (Australia and New Zealand rules)1
2.7.11-2.7.132.7.11 to 2.7.13 Three-pole and four-pole changeover arrangements0
2.7.22.7.2 Operation of changeover devices: break before make, active and neutral switching, no earth switching1
2.7.32.7.3 Mechanical interlocking of changeover devices1
2.7.42.7.4 Changeover device with intermediate off position used as a main switch1
2.7.52.7.5 Changeover device without an off position: permitted connection points0
2.7.62.7.6 Changeover device voltage, current and fault ratings1
2.7.7-2.7.82.7.7 Access and 2.7.8 identification of changeover devices1
2.7.92.7.9 Automatic changeover back to normal supply and ATS used as a main switch1
2.82.8 Earthing and bonding of the generating set0
2.92.9 Generator switchboards and switchgear0
3.13.1 General: Section 3 applies to permanently connected sets0
3.2-access3.2 Location: barriers against unauthorised access, access space and exits1
3.2-environment3.2 Location: ventilation and lighting of generator rooms1
3.33.3 Guarding of live parts0
3.43.4 Transformers0
3.5-changeover3.5 Sets supplying safety and essential services: changeover time and grouped switchgear1
3.5-loads3.5 Sets supplying safety and essential services: selective protection, no unintended paralleling, other loads1
3.5-supply3.5 Sets supplying safety and essential services: capability, fuel, fire resistance and dedication1
4.14.1 General: sets connected by detachable connections0
4.2-other4.2.3 and 4.2.7 Other connection requirements for detachable connections0
4.2.44.2.4 Current limiting of each incoming generator supply0
4.2.54.2.5 Enclosure of live parts at the inlet and neutral pin isolation0
4.2.64.2.6 Marking of generator inlet fittings0
4.34.3 Earthing and bonding of sets on detachable connections; no separate electrode0
4.44.4 Connection of a portable set to a dedicated wiring system (New Zealand only)0
AppA-CAppendices A to C0
AppDAppendix D: Construction and performance of self-contained transportable sets up to 25 kW0
introStatus of AS/NZS 3010:2017 + A10

Tell me when AS/NZS 3010:2017 Electrical Installations Generating Sets files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for AS/NZS 3010:2017 Electrical Installations Generating Sets, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.