1 | 1 Scope, abbreviations and definitions | 0 |
10.1-10.16 | HV switchgear selection, remote switching and emergency power off intertripping | 0 |
10.17-10.30 | HV protection design, grading and review on network change | 1 |
10.31-10.48 | Transformer rating, type, fire compartmentation and temperature monitoring | 0 |
10.49-10.51 | Generator protection tolerant of faults but clearing local cable faults | 1 |
10.52-10.76 | LV switchgear location, access control, circuit charts and discrimination study | 1 |
10.77-10.80 | Network reconfiguration after faults and hard-wired monitored SCADA | 0 |
11.1-11.8 | Battery selection, environment, charging and temperature alarms | 1 |
11.10-11.12 | UPS battery autonomy agreed with clinical stakeholders | 1 |
11.16-11.18 | Battery autonomy for emergency lighting, theatre lamps and fire alarms | 0 |
11.19-11.21 | Generator starting battery capacity and charging | 1 |
11.22-11.24 | Switchgear tripping and closing batteries: 8 hours' autonomy and dual rectifiers | 0 |
11.25-11.62 | UPS configuration, protection, alarms and emergency bypass | 1 |
11.63-11.67 | Central battery units and theatre lamp inverters | 0 |
11.9-11.15 | Split battery banks and string monitoring to allow maintenance on line | 1 |
12.1-12.13 | EMC compliance of the installation and EMC procurement specification | 0 |
12.14-12.50 | EMC zoning, cable segregation and earthing practice | 0 |
13.1-13.14 | Earthing design, HV and LV earth interconnection study and generator earthing | 0 |
13.15-13.32 | Supplementary bonding and equipotential bonding busbar in Group 1 and 2 locations | 0 |
13.33-13.61 | Lightning protection to BS EN 62305 and surge protection devices | 0 |
14.1-14.48 | Containment and cable routes: protection, fire stopping, segregation and HV warnings | 0 |
14.49-14.81 | Cable sizing, fault calculation for primary and secondary supplies, and identification | 0 |
15.1-15.5 | No trailing multi-outlet extension leads in Group 1 and 2 locations; enough fixed outlets | 0 |
15.104-15.119 | Prefabricated wiring systems and BEMS power supplies | 0 |
15.14-15.30 | Medical IT systems in Group 2 locations: monitoring, UPS support and outlet identification | 0 |
15.31-15.62 | Patient environment, outlet placement, imaging supplies, theatre panels and emergency power off | 0 |
15.6-15.13 | RCD protection and dual circuits with secondary supply backing in Medical Locations | 0 |
15.63-15.68 | Continuous supplies, outbuildings, temporary supplies and mobile units | 0 |
15.69-15.81 | Lighting circuits: two sources in grade C and above, secondary supply support and circuit identification | 0 |
15.82-15.97 | Theatre lights and emergency, safety and standby lighting with automatic testing | 0 |
15.98-15.103 | Fire alarm, security, nurse call and blood bank alarms: tertiary supplies and failure alarms | 0 |
16.1-16.3 | Adequate time and resources for validation and commissioning | 0 |
16.12 | Generator operational tests, fuel storage check, records handed over and DNO witness | 1 |
16.13-16.16 | UPS commissioning: changeover, waveform, harmonics, true battery autonomy and alarms | 1 |
16.17-16.23 | Medical IT commissioning and validation including changeover times | 0 |
16.24-16.29 | Fixed wiring verification to BS 7671 by competent persons, including earthing and phase rotation | 0 |
16.30-16.32 | Handover records to be kept | 0 |
16.33-16.34 | Operating and maintenance manual with switching philosophy and isolation points | 1 |
16.35-16.36 | As-installed drawings and schematics at every HV and LV panel | 0 |
16.37-16.39 | Building logbook created or updated | 0 |
16.4-16.7 | Generator factory and site testing including static checks and witnessed dynamic tests | 1 |
16.8-16.11 | Generator voltage regulation, load sharing, parallel operation and PFC isolation verified | 1 |
17.0-17.8 | Maintenance duty, responsibility framework and risk-assessed shutdowns | 1 |
17.102-17.105 | UPS functional tests at least six-monthly and full service tests | 1 |
17.106-17.108 | UPS single-line diagram, site logbook and records of alarms, outages, tests and servicing | 1 |
17.109-17.118 | Medical IT inspection, annual functional tests, changeover verification and records | 0 |
17.11-17.21 | Response to failures: business continuity plans and 24/7 reporting | 0 |
17.119-17.127 | Harmonic filter and power-factor correction maintenance | 0 |
17.128-17.138 | Final circuit inspection and full testing every three to five years | 0 |
17.13-17.17 | Overall maintenance approach agreed at design with review, safe access and recorded sign-off | 1 |
17.139-17.140 | Coordination with dependent services and testing of lighting batteries | 0 |
17.141-17.147 | Portable appliance testing regime, asset register and stored test records | 0 |
17.22-17.28 | Visual inspection feedback, planned preventive maintenance, audits and condition-based replacement | 1 |
17.29-17.31 | Spares strategy and standardised plant; EMC awareness in maintenance | 1 |
17.32-17.42 | Switchgear PPM, HV visual inspections every three months, thermal imaging and partial discharge testing | 0 |
17.43-17.50 | HV switchgear maintenance programme, operational switching, grading review and secondary injection | 1 |
17.51-17.62 | Transformer inspection, annual fluid sampling and earth continuity | 0 |
17.63-17.71 | LV switchgear inspection every six months, annual operation of fuse-switches and test records | 1 |
17.72-17.80 | Earthing maintenance, annual bonding validation, mobile connections and lightning protection tests | 0 |
17.81-17.83 | Monthly on-load generator test of at least one hour including changeover | 1 |
17.84 | Load bank testing with reactive and resistive load where on-load testing is not acceptable | 1 |
17.85-17.86 | Multi-set test loading above 70% and cooling run-on after tests | 1 |
17.87-17.91 | Annual 110% load engine condition test of at least three hours with safety chain tests | 1 |
17.9-17.10 | Trained maintenance staff, Authorised Person checks on contractors and safe systems of work | 1 |
17.90 | Annual test of automatic transfer switchgear and island-mode tests where cover is below 100% | 1 |
17.92 | Reduced test frequency only where parallel operation with the PES exists | 1 |
17.93-17.95 | Weekly visual inspection and three-monthly functional tests of primary and secondary supplies | 1 |
17.96-17.97 | Single-line diagram of primary and secondary supplies and generator run-hour records | 1 |
17.98-17.101 | UPS, inverter and battery monthly visual inspection and data log records | 1 |
2 | 2 Introduction: structure and voltage bands | 0 |
3.12 | Security specialist input where IT systems control or monitor electrical plant | 0 |
3.13-3.17 | Electrical Safety Group remit, records and minutes | 0 |
3.18-3.22 | Risk assessment process, residual risks and periodic review | 0 |
3.2-3.11 | Electrical Safety Group: constitution, reporting line and authority | 0 |
3.23-3.25 | Contingency where risks are not mitigated, and design for safe maintenance | 0 |
3.26 | Departures from HTM 06-01 recorded and justified | 0 |
3.27 | Final design and residual risks signed off by all stakeholders | 0 |
3.3 | Risk assessments, safe methods of operation and audit of electrical policy | 0 |
3.4 | Board accountability and contractor participation | 0 |
4.1 | Contingency plans for supply failure and relationship with the electricity supplier | 0 |
4.18-4.23 | Supply restoration times for each clinical risk grade | 1 |
4.2-4.3 | Design to minimise single points of failure, including failures of the internal network | 0 |
4.24-4.30 | Business continuity grades: UPS and load management for support services | 0 |
4.31-4.39 | Distribution strategy driven to agreed residual risk, with resilience for testing and maintenance | 0 |
4.4-4.17 | Risk grading of areas for loss of supply (clinical A to E, business I to IV) | 1 |
5.0-5.3 | Early collaboration with the Electrical Safety Group and competent designers | 0 |
5.10-5.31 | Supply capacity, load assessment and growth allowance | 0 |
5.39-5.42 | Design for safe access, maintenance and commissioning | 0 |
5.43-5.52 | Connection of new works to the DNO or the site network | 0 |
5.6 | Fuel stocks for standby generation maintained | 1 |
5.9 | Dual, diverse primary supplies where possible | 0 |
6.1-6.19 | Power quality: power factor, harmonics and generator compatibility | 0 |
7.1-7.13 | Distribution strategy for resilience and secondary supply provision by risk | 0 |
7.14-7.19 | Segregated primary and secondary systems, emergency coupling and diverse routes | 0 |
7.20-7.23 | Two primary connections above 2 MVA and N+1 standby generators kept in readiness | 1 |
7.25-7.68 | HV and LV network configurations matched to assessed risk | 0 |
8.1-8.20 | HV substation and LV switchroom location and construction | 1 |
8.21-8.30 | Access, security and maintenance space in substations and switchrooms | 1 |
8.31-8.36 | Fire precautions and fire extinguishing in substations | 0 |
8.37-8.46 | Switchroom environment, lighting and minimum equipment and notices | 1 |
9.1-9.5 | Secondary power supply strategy agreed by the Electrical Safety Group | 0 |
9.12-9.18 | Secondary supply location and capacity, continuous rating and load shedding schedule | 1 |
9.19-9.21 | Areas supported by the secondary supply decided at design with stakeholders | 0 |
9.22-9.27 | Generator configuration: N+1 best practice and known failure causes | 1 |
9.28-9.44 | Generator operating mode chosen to allow on-load testing (island, short-term or long-term parallel) | 1 |
9.45-9.53 | Mains failure detection and automatic start and connection timing | 1 |
9.54 | Minimum generator run time of 20 minutes after any start | 1 |
9.55-9.56 | Run and stop signals, simulate-mains-failure switches and alarm monitoring | 1 |
9.57-9.60 | Multi-set operation, synchronising time and load-dependent set control | 1 |
9.6-9.31 | Mobile generator plug-in points: connection, earthing, security and response time | 1 |
9.61-9.65 | Mains return delay, load transfer method and cooling run-on | 1 |
9.66-9.69 | Load management of generators during prolonged outages | 1 |
9.7-9.11 | Renewables run only in parallel with the primary supply, with positive isolation | 0 |
9.70-9.75 | Generator, engine and alternator specification: prime rating and load acceptance | 1 |
9.76-9.80 | Starting batteries and chargers kept fully charged and monitored | 1 |
9.81-9.84 | Fuel storage quantities and fuel quality management | 1 |
9.85-9.88 | Fuel transfer, fire dump valves, leak containment and overfill protection | 1 |
9.89-9.92 | Exhaust, noise, operational safety and controlled disposal of consumables | 1 |
App1 | Appendix 1: Maximum interruption times to the primary supply | 0 |
App2-3 | Appendix 2: Sample test record sheets; Appendix 3: Drawing symbols | 0 |
App4 | Appendix 4: Mains extension leads with medical equipment only after competent risk assessment | 0 |
intro | Status of HTM 06-01 (2017 edition) | 0 |