International

Kotter 8-Step Change Model

25 controls. 6 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

25 controls 6 frameworks share controls with it International verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
KOTTER-Step1-Create-Sense-of-Urgency-Kotter-1996-Leading-Change-2014-Accelerate-Bold-Aspirational-Big-OpportunityKotter Step 1 Create Sense of Urgency + 1996 Leading Change + 2014 Accelerate Big Opportunity1
KOTTER-Step2-Build-Guiding-Coalition-Sponsor-Network-Position-Power-Expertise-Credibility-LeadershipKotter Step 2 Build Guiding Coalition + Position Power + Expertise + Credibility + Sponsorship4
KOTTER-Step3-Form-Strategic-Vision-Initiatives-Big-Opportunity-Imaginable-Desirable-Feasible-Focused-Flexible-CommunicableKotter Step 3 Form Strategic Vision + Initiatives + Big Opportunity Statement3
KOTTER-Step4-Enlist-Volunteer-Army-Communicate-Vision-Walk-the-Talk-Repetition-Multiple-Channels-Two-WayKotter Step 4 Enlist Volunteer Army + Communicate Vision + Walk-the-Talk4
KOTTER-Step5-Enable-Action-Removing-Barriers-Empowerment-Structures-Systems-Skills-Supervisors-Resistance-ManagementKotter Step 5 Enable Action by Removing Barriers + Empowerment + Resistance Management1
KOTTER-Step6-Generate-Short-Term-Wins-Visible-Unambiguous-Related-to-Change-Within-6-18-Months-Measurement-HealthKotter Step 6 Generate Short-Term Wins + Visible + Unambiguous + 6-18 Months + Measurement6
KOTTER-Step7-Sustain-Acceleration-Dual-Operating-System-Network-Hierarchy-Successive-Waves-Continuous-Volunteer-EnergyKotter Step 7 Sustain Acceleration + Dual Operating System + Successive Waves1
KOTTER-Step8-Institute-Change-Culture-Anchor-Behaviour-Norms-Shared-Values-Succession-Onboarding-StorytellingKotter Step 8 Institute Change + Anchor in Culture + Behaviour + Norms + Succession1
ERRORSThe eight errors that make transformation efforts fail (1995)0
MODELKotter's model of leading change: editions0
PChange leadership principles and the dual operating system0
P1Principle: management and leadership0
P2Principle: head and heart0
P3Principle: have to and want to0
P4Principle: select few and diverse many0
P5Dual operating system: a volunteer network alongside the hierarchy0
SThe eight steps (accelerators) for leading change0
S1Step 1: Create a sense of urgency around a big opportunity0
S2Step 2: Build a powerful guiding coalition0
S3Step 3: Form a strategic vision and initiatives0
S4Step 4: Communicate the vision and enlist a volunteer army0
S5Step 5: Enable action by removing barriers0
S6Step 6: Plan for and generate short-term wins0
S7Step 7: Sustain acceleration: consolidate improvements and produce more change0
S8Step 8: Institute change by anchoring new approaches in the culture0

Tell me when Kotter 8-Step Change Model files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What an auditor will ask you to produce

The artefacts named on the failure modes this framework speaks to.

  • Stakeholder map
  • Reporting calendar
  • Communication plan
  • Stakeholder register
  • Engagement plan
  • Workshop minutes

How programmes fail on this

Failure modes named by this framework and others. Each opens the full record.

What this page is

A control-level reference for Kotter 8-Step Change Model, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition