1 | 1 Introduction, purpose, scope and use | 0 |
1.6 | 1.6 Complexity considerations | 1 |
1.7 | 1.7 Alternative methods or processes | 0 |
10 | 10 Hardware design life cycle data: characteristics | 0 |
10.1.1 | 10.1.1 Plan for Hardware Aspects of Certification (PHAC) | 2 |
10.1.2 | 10.1.2 Hardware design plan | 0 |
10.1.3 | 10.1.3 Hardware validation plan | 1 |
10.1.4 | 10.1.4 Hardware verification plan | 2 |
10.1.5 | 10.1.5 Hardware configuration management plan | 0 |
10.1.6 | 10.1.6 Hardware process assurance plan | 1 |
10.2 | 10.2 Hardware design standards and guidance | 2 |
10.3.1 | 10.3.1 Hardware requirements | 0 |
10.3.2.1 | 10.3.2.1 Conceptual design data | 0 |
10.3.2.2 | 10.3.2.2 Detailed design data | 0 |
10.4.1 | 10.4.1 Traceability data | 2 |
10.4.2 | 10.4.2 Review and analysis procedures | 0 |
10.4.3 | 10.4.3 Review and analysis results | 0 |
10.4.4 | 10.4.4 Test procedures | 0 |
10.4.5 | 10.4.5 Test results | 1 |
10.5 | 10.5 Hardware acceptance test criteria | 0 |
10.6 | 10.6 Problem reports | 0 |
10.7 | 10.7 Hardware configuration management records | 1 |
10.8 | 10.8 Hardware process assurance records | 1 |
10.9 | 10.9 Hardware Accomplishment Summary | 1 |
11.1.1 | 11.1.1 Modifications to previously developed hardware | 2 |
11.1.2 | 11.1.2 Change of aircraft installation | 1 |
11.1.3 | 11.1.3 Change of application or design environment | 0 |
11.1.4 | 11.1.4 Upgrading a design baseline | 1 |
11.1.5 | 11.1.5 Additional configuration management considerations | 0 |
11.2.1 | 11.2.1 Electronic component management for COTS components | 1 |
11.2.2 | 11.2.2 COTS component procurement | 1 |
11.3.1 | 11.3.1 Product service experience data acceptability criteria | 1 |
11.3.2 | 11.3.2 Assessment of product service experience data | 1 |
11.3.3 | 11.3.3 Product service experience assessment data | 0 |
11.4.1 | 11.4.1 Tool assessment and qualification process | 2 |
11.4.2 | 11.4.2 Tool assessment and qualification data | 1 |
2.1.1 | 2.1.1 Information flow from the system process to the hardware design life cycle | 1 |
2.1.2 | 2.1.2 Information flow from the hardware design life cycle to the system process | 2 |
2.1.3 | 2.1.3 Information flow between the hardware and software life cycles | 1 |
2.2 | 2.2 System safety assessment processes | 1 |
2.3.1 | 2.3.1 Hardware safety assessment considerations | 1 |
2.3.2 | 2.3.2 Quantitative assessment of random hardware faults | 0 |
2.3.3 | 2.3.3 Qualitative assessment of hardware design errors and upsets | 0 |
2.3.4 | 2.3.4 Design assurance considerations for hardware failure condition classification | 1 |
3 | 3 Hardware design life cycle (overview) | 0 |
3.2 | 3.2 Transition criteria | 2 |
4.1 | 4.1 Planning process objectives | 2 |
4.2 | 4.2 Planning process activities | 2 |
5 | 5 Hardware design processes: design representation | 0 |
5.1.1 | 5.1.1 Requirements capture objectives | 2 |
5.1.2 | 5.1.2 Requirements capture activities | 3 |
5.2.1 | 5.2.1 Conceptual design objectives | 0 |
5.2.2 | 5.2.2 Conceptual design activities | 1 |
5.3.1 | 5.3.1 Detailed design objectives | 0 |
5.3.2 | 5.3.2 Detailed design process activities | 2 |
5.4.1 | 5.4.1 Implementation objectives | 0 |
5.4.2 | 5.4.2 Implementation activities | 1 |
5.5.1 | 5.5.1 Production transition objectives | 0 |
5.5.2 | 5.5.2 Production transition activities | 0 |
5.6 | 5.6 Acceptance test | 0 |
5.7 | 5.7 Series production (outside scope) | 0 |
6.1.1 | 6.1.1 Validation process objectives | 1 |
6.1.2 | 6.1.2 Validation process activities | 3 |
6.2.1 | 6.2.1 Verification process objectives | 2 |
6.2.2 | 6.2.2 Verification process activities | 3 |
6.3.1 | 6.3.1 Test | 1 |
6.3.2 | 6.3.2 Analysis | 1 |
6.3.3 | 6.3.3 Reviews | 0 |
6.3.3.1 | 6.3.3.1 Requirements review | 2 |
6.3.3.2 | 6.3.3.2 Design review | 2 |
7.1 | 7.1 Configuration management objectives | 2 |
7.2.1 | 7.2.1 Configuration identification | 1 |
7.2.2 | 7.2.2 Baseline establishment | 1 |
7.2.3 | 7.2.3 Problem reporting, tracking and corrective action | 1 |
7.2.4 | 7.2.4 Change control | 2 |
7.2.5 | 7.2.5 Release, archive and retrieve | 1 |
7.3 | 7.3 Data control categories | 1 |
8.1 | 8.1 Process assurance objectives | 2 |
8.2 | 8.2 Process assurance activities | 2 |
9.1 | 9.1 Means of compliance and planning | 2 |
9.2 | 9.2 Compliance substantiation | 1 |
A | Appendix A Modulation of life cycle data by design assurance level, and verification independence | 2 |
B-2.1 | Appendix B 2.1 Functional failure path analysis method | 0 |
B-2.2 | Appendix B 2.2 Functional failure path analysis data | 0 |
B-3.1.1 | Appendix B 3.1.1 Architectural mitigation method | 1 |
B-3.1.2 | Appendix B 3.1.2 Architectural mitigation resolution | 0 |
B-3.1.3 | Appendix B 3.1.3 Architectural mitigation data | 0 |
B-3.2 | Appendix B 3.2 Product service experience (Level A and B) | 0 |
B-3.3.1 | Appendix B 3.3.1 Elemental analysis | 2 |
B-3.3.2 | Appendix B 3.3.2 Safety-specific analysis | 1 |
B-3.3.3 | Appendix B 3.3.3 Formal methods | 0 |
C-D | Appendices C and D: glossary and acronyms | 0 |
DOCUMENT | RTCA DO-254 / EUROCAE ED-80: the document and its status | 0 |