3.1 | 3.1 Development assurance planning process and planning elements | 2 |
3.2 | 3.2 Development assurance plan | 1 |
3.2.1 | 3.2.1 Design description | 0 |
3.2.2 | 3.2.2 Transition criteria | 2 |
3.2.3 | 3.2.3 Deviations from plans | 1 |
3.3 | 3.3 Certification Authority coordination | 2 |
4.2 | 4.2 Aircraft function and requirement development | 0 |
4.3 | 4.3 Development of aircraft architecture and allocation of aircraft functions to systems | 0 |
4.4 | 4.4 Development of system functions and requirements | 0 |
4.5 | 4.5 Development of system architecture and allocation of system requirements to items | 1 |
4.6.1.1 | 4.6.1.1 Information flow from the system process to the item processes | 1 |
4.6.1.2 | 4.6.1.2 Information flow from the item processes to the system process | 2 |
4.6.1.3 | 4.6.1.3 Information flow between hardware and software life cycle processes | 1 |
4.6.2 | 4.6.2 Item design and build | 2 |
4.6.3 | 4.6.3 Item integration and verification | 2 |
4.6.4 | 4.6.4 Aircraft and system integration and verification, including unintended behaviors | 1 |
4.7 | 4.7 Summary of development assurance process outputs | 2 |
5.1 | 5.1 Safety assessment process | 1 |
5.1.1 | 5.1.1 Aircraft functional hazard assessment | 0 |
5.1.2 | 5.1.2 Preliminary aircraft safety assessment | 0 |
5.1.3 | 5.1.3 System functional hazard assessment | 0 |
5.1.4 | 5.1.4 Preliminary system safety assessment | 1 |
5.1.5 | 5.1.5 System safety assessment | 0 |
5.1.6 | 5.1.6 Aircraft safety assessment | 0 |
5.1.7 | 5.1.7 Safety program plan | 0 |
5.1.8 | 5.1.8 Safety-related flight operations or maintenance tasks | 0 |
5.1.9 | 5.1.9 Relationship with in-service safety | 0 |
5.2.1 | 5.2.1 General principles of development assurance level assignment | 1 |
5.2.2 | 5.2.2 FDAL and IDAL | 1 |
5.2.3 | 5.2.3 Detailed FDAL and IDAL assignment | 0 |
5.2.3.2 | 5.2.3.2 FDAL assignment with architecture consideration and functional failure sets | 0 |
5.2.3.2.1 | 5.2.3.2.1 Independence attributes | 1 |
5.2.3.2.2 | 5.2.3.2.2 FDAL and IDAL assignment process | 0 |
5.3 | 5.3 Requirements capture planning and modeling | 2 |
5.3.1 | 5.3.1 Classes of requirements | 0 |
5.3.1.1 | 5.3.1.1 Safety requirements | 1 |
5.3.1.10 | 5.3.1.10 Derived requirements | 2 |
5.3.1.11 | 5.3.1.11 Reuse of systems, equipment or items from previously certificated products | 1 |
5.3.1.2 | 5.3.1.2 Functional requirements | 0 |
5.3.1.3 | 5.3.1.3 Customer requirements | 0 |
5.3.1.4 | 5.3.1.4 Operational requirements | 0 |
5.3.1.5 | 5.3.1.5 Performance requirements | 0 |
5.3.1.6 | 5.3.1.6 Physical and installation requirements | 0 |
5.3.1.7 | 5.3.1.7 Maintainability requirements | 0 |
5.3.1.8 | 5.3.1.8 Interface requirements | 1 |
5.3.1.9 | 5.3.1.9 Certification requirements | 0 |
5.3.2 | 5.3.2 Capturing safety requirements from the safety analyses | 0 |
5.3.3 | 5.3.3 Identifying and evaluating derived requirements | 2 |
5.3.4 | 5.3.4 Capturing maintenance requirements for in-service use | 0 |
5.4 | 5.4 Requirements validation | 1 |
5.4.1 | 5.4.1 Validation process objectives | 1 |
5.4.2 | 5.4.2 Validation process and validation plan | 1 |
5.4.2.3 | 5.4.2.3 Correctness and completeness | 1 |
5.4.2.4 | 5.4.2.4 Management of assumptions | 0 |
5.4.2.5 | 5.4.2.5 Validation matrix | 1 |
5.4.2.6 | 5.4.2.6 Validation summary | 1 |
5.4.3 | 5.4.3 Correctness checks | 1 |
5.4.4 | 5.4.4 Completeness checks | 1 |
5.4.5 | 5.4.5 Validation approach | 0 |
5.4.6 | 5.4.6 Validation methods | 1 |
5.4.7 | 5.4.7 Validation data | 1 |
5.5 | 5.5 Implementation verification | 0 |
5.5.1 | 5.5.1 Verification process objectives | 1 |
5.5.2 | 5.5.2 Verification process | 1 |
5.5.3 | 5.5.3 Verification approach | 0 |
5.5.4 | 5.5.4 Verification planning | 1 |
5.5.5 | 5.5.5 Verification methods | 1 |
5.5.6 | 5.5.6 Verification data | 2 |
5.6 | 5.6 Configuration management | 0 |
5.6.1 | 5.6.1 Configuration management process objectives | 2 |
5.6.2 | 5.6.2 Configuration management process activities | 2 |
5.6.3 | 5.6.3 Configuration management data | 1 |
5.6.4 | 5.6.4 System control categories | 1 |
5.7 | 5.7 Process assurance | 0 |
5.7.1 | 5.7.1 Process assurance objectives | 2 |
5.7.2 | 5.7.2 Process assurance plan | 1 |
5.7.3 | 5.7.3 Process assurance reviews | 1 |
5.7.4 | 5.7.4 Process assurance data | 1 |
6 | 6 Modifications to aircraft or systems | 0 |
6.1 | 6.1 Modification and reuse process overview | 1 |
6.2 | 6.2 Modification management process | 0 |
6.3 | 6.3 Modification impact analysis | 1 |
6.4 | 6.4 Reuse of evidence from previous certification | 0 |
6.4.1 | 6.4.1 Use of service history | 1 |
A.1 | A.1 Process objectives, outputs and applicability by development assurance level | 1 |
SEC4INTRO | 4 and 4.1 Generic development process and development assurance concepts | 0 |
STANDARD | SAE ARP4754B: the recommended practice and its scope | 0 |
STATUS | Status: Revision B is current; regulators recognize the A edition by advisory circular | 0 |
TERMS | 2.2 Definitions used by the requirements leaves | 0 |