Europe (Cefic member associations in almost 30 countries; aligned with the ICCA global programme)

Cefic Responsible Care Management Framework

36 controls. 9 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

36 controls 9 frameworks share controls with it Europe (Cefic member associations in almost 30 countries; aligned with the ICCA global programme) verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
1Chapter 1: Our commitment and our drivers0
2.1.1-1Companies: formal commitment to Responsible Care1
2.1.1-2Companies: integrate Responsible Care principles into daily activities1
2.1.1-3Companies: monitor performance by annual self-assessment and KPI reporting1
2.1.1-4Companies: share best practices and use the logo correctly0
2.1.2National associations: core elements of the role0
2.1.2-docsReference documents of the initiative (Global Charter, Fundamental Features, ACC codes, European Security Code)0
2.1.3-4Cefic and ICCA: coordination roles0
3.1Chapter 3.1: Key elements of the framework (PDCA, standards, sustainability principles, maturity levels)0
3.2.1-aScope and commitment1
3.2.1-bCompliance1
3.2.1-cManagement structure and board involvement1
3.2.1-dEnsure improvement: management reviews, internal audits, incident investigation0
3.2.1-eResources, training and employee involvement0
3.2.1-fDocument management0
3.2.1-gManagement of change0
3.2.2-aZero-harm ambition across health and safety, process safety, security, distribution and environment1
3.2.2-bKey management processes per area: commitment, risk assessment, maintenance, equipment control, incident investigation, emergency preparedness, competence1
3.2.2-cEnvironmental performance management (maturity example, question 2.34)1
3.2.2-dProcess safety audits and inspections (maturity example, question 2.14)1
3.2.3-aProduct stewardship across the life cycle2
3.2.3-bManagement of product hazard information (maturity example, question 3.4)1
3.2.4-aInfluencing business partners: responsible sourcing, value chain collaboration, integrity, labour rights, logistics partners, downstream protection1
3.2.4-bResponsible sourcing (maturity example, question 4.1)1
3.2.5-aEngaging stakeholders: assessment, dialogue, transparency, community support1
3.2.5-bTransparency and information disclosure (maturity example, question 5.3)1
3.2.6-aContributing to sustainability: materiality, SDGs, communication, portfolio, circularity, water, biodiversity, climate and energy, diversity0
3.2.6-bDesigning products with improved sustainability outcomes (maturity example, question 6.4)1
3.3Chapter 3.3: The self-assessment webtool0
KPI-1Company information KPIs1
KPI-2Health and safety at work KPIs1
KPI-3Environmental performance KPIs1
KPI-4Use of resources and transport incident KPIs1
app2Appendix 2: The eight Fundamental Features of Responsible Care (for national associations)0
app3Appendix 3: Mapping matrix to international standards0
prefacePreface: a rejuvenated European framework for Responsible Care0

Tell me when Cefic Responsible Care Management Framework files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for Cefic Responsible Care Management Framework, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition