15filers, current period
9the period before
13controls it touches
6frameworks
Supply Chain Due Diligence in 10-K and 10-Q filings, by month.
The marked line is the first month any public company in our record used the phrase; everything left of it is nobody writing it down.
Companies disclosing it
15
wrote this into a filing with the SEC
What it obligates
13
controls across 6 frameworks whose text speaks to it
Employers hiring for it
11
open US roles name it, and the ones below are hiring now
The long view, in annual and quarterly filings
A 10-K or 10-Q is a periodic report, so this counts how often the phrase appears in routine annual and quarterly reporting. It moves far more slowly and the numbers are larger.
Every month since 2008. The last point is the current month and is still
filling, so it always looks lower than it will be.
2008
peak 19 in February 2026
2026
Who disclosed it
From SEC full-text search over 8-K filings. Every row links to the filing itself.
| Company | Form | Filed | |
| UNIVERSAL CORP /VA/ UVV | 8-K | 2026-11-04 | filing |
| Mueller Water Products, Inc. MWA | 10-K | 2026-11-18 | filing |
| SOMNIGROUP INTERNATIONAL INC. SGI | 8-K | 2026-11-09 | filing |
| GREIF, INC | 10-K | 2026-11-18 | filing |
| lululemon athletica inc. LULU | 10-Q | 2026-09-03 | filing |
| Microvast Holdings, Inc. MVST | 10-Q | 2026-11-09 | filing |
| TYSON FOODS, INC. TSN | 10-K | 2026-11-16 | filing |
| Hewlett Packard Enterprise Co | 10-Q | 2026-09-03 | filing |
| PLEXUS CORP PLXS | 10-K | 2026-11-19 | filing |
| NETGEAR, INC. NTGR | 10-Q | 2026-11-04 | filing |
| QVC Group, Inc. QVCG | 10-Q | 2026-11-16 | filing |
| Fortinet, Inc. FTNT | 10-Q | 2026-10-30 | filing |
| iRhythm Holdings, Inc. IRTC | 10-Q | 2026-11-05 | filing |
| Post Holdings, Inc. POST | 10-K | 2026-11-19 | filing |
The full search on EDGAR
Who is hiring for it
A sample of the open roles naming this phrase. An employer paying a salary
against something is the least ambiguous demand signal there is, and every row links to the
posting so the claim can be checked rather than believed. The total above is the whole US
market; these are the ones we hold the posting for.
Which industries file it
Companies grouped by the industry classification on their own filing. A count, not a
survey.
| Industry | | Companies |
|---|
| Electronics and electrical equipment | | 15 |
| Industrial machinery | | 9 |
| Instruments and medical devices | | 6 |
| Transport equipment | | 5 |
| Food, beverage and tobacco | | 4 |
| Wholesale trade | | 4 |
| Chemicals and pharmaceuticals | | 4 |
| Wood, paper and printing | | 3 |
| Textiles and apparel | | 3 |
| Retail | | 3 |
What it obligates
Our corpus holds 13 controls across
6 frameworks whose text speaks to this. Not a judgement:
these controls say so, and each is one lookup from its source document. Ordered by how much each
framework has to say about it, so the one that will cost you the most work is first. Every name
opens that framework in the corpus.
What an auditor will ask you to produce
The artefacts named on those controls, most frequently cited first.
- Independent feasibility study reports covering economic, technical, legal and schedule factors
- IT security risk assessment included in the feasibility study
- Supply chain due diligence, licensing and regulatory analysis sections of the feasibility study
- Evidence of independence of the study team from the requesting team
- Mineral scope determination and applicability log
- Smelter or refiner identification list with CMRT/EMRT
- Mineral-specific risk assessment outputs
- Engagement records with upstream producers
How it usually fails
Recorded when each control was verified against its source. This is where programmes
that think they are covered turn out not to be.
- Feasibility study written by the business line sponsoring the project
- Study omits network, backup and interface requirements, surfacing them after contract signature
- Scope omits emerging minerals (cobalt, mica)
- Smelter list not reconciled to current RMI status
- Risk assessments not updated for conflict zones
- Upstream engagement limited to tier 1
NIST SP 800-161 Cybersecurity Supply Chain Risk Management Evidence & Implementation Kit
191 controls sit behind NIST SP 800-161 Rev 1, and this is the documentation set for them: an adopt-ready artifact per control, and the evidence an auditor asks for against each.
See what is in it, $249
The same set every buyer of this kit receives. Nothing here is produced on request.
NIST SP 800-161 Rev 1 holds 191 controls. They appear again inside
34 other frameworks in our corpus; the 10 strongest are shown. Thickness and
size both carry the number of controls shared, so work done once counts in every framework on
this diagram.
191If you already run NIST SP 800-161 Rev 1, that is the 191 controls behind this disclosure, already evidenced.
135And ISO 27001:2022 is not a separate programme. 135 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
132And ISO 27002:2022 is not a separate programme. 132 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
119And ISO 27701:2019 is not a separate programme. 119 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
Run as two programmes
326 controls
NIST SP 800-161 Rev 1 and ISO 27001:2022 scoped separately, each with its own
evidence, its own owner and its own budget line. This is how almost everybody does it.
Run once, counted twice
135 already done
135 of ISO 27001:2022's controls are controls you evidenced for
NIST SP 800-161 Rev 1. Same artefacts, same owner, no second effort. The mapping is the
only reason anybody knows.
Supply Chain Due Diligence in 10-K and 10-Q filings, by month.
The marked line is the first month any public company in our record used the phrase; everything left of it is nobody writing it down.
What this actually means
- Why now
- 15 public companies wrote this into an 8-K in the last seven days, 67% more than the seven before. That is not sentiment or a survey. It is a count of companies choosing to put a phrase into a document they are legally accountable for.
- Who already cares
- 11 open US roles name this work today, which suggests increased attention to it beyond what any filing says. A job advertisement clears a budget holder and a filing clears legal, so the two answer to different people. We have not measured which moves first, only that both are moving.
- What comes into scope
- Once the phrase is on the record it maps to obligations within NIST SP 800-161 Rev 1, ISO 28001:2007 Supply Chain Security Management, NIST SP 800-161. 235 controls behind those, and the difference between asserting them and evidencing them is the whole of the work.
- Who is quietly ahead
- Anyone already running NIST SP 800-161 Rev 1 has done 135 of the controls that carry ISO 27001:2022 too. Same evidence, second standard. Most organisations run those as two programmes with two budgets because nobody told them the mapping existed.
- Who is exposed
- 3 companies disclosed this for the first time in the last ninety days, out of 66 in total. A first mention is a company deciding it can no longer not say it. Whoever has not yet is either genuinely unaffected or has not looked, and nothing here distinguishes the two.
What this obligates
The instruments in our corpus that govern this disclosure, and how many controls sit
behind each. This is not a filing count. It is what applies once a company has written the
phrase down.
5 frameworks, 235 controls between them.
NIST SP 800-161 Rev 1 holds 191 controls. They appear again inside
34 other frameworks in our corpus; the 10 strongest are shown. Thickness and
size both carry the number of controls shared, so work done once counts in every framework on
this diagram.
What closing it also moves
The same controls appear in other frameworks through mappings held in our corpus. Work
done here is already progress there. This is the part that is not in EDGAR and not in any public
dataset: it comes from mappings built and verified by hand, control by control.
ISO 27001:2022135
ISO 27002:2022132
ISO 27701:2019119
ISO 22301:201977
PCI DSS 4.018
ESRS (revised 2026)9
Counted as controls reached through cross-framework mappings. It measures
overlap of work, not compliance with the named framework.
Run as two programmes
326 controls
NIST SP 800-161 Rev 1 and ISO 27001:2022 scoped separately, each with its own
evidence, its own owner and its own budget line. This is how almost everybody does it.
Run once, counted twice
135 already done
135 of ISO 27001:2022's controls are controls you evidenced for
NIST SP 800-161 Rev 1. Same artefacts, same owner, no second effort. The mapping is the
only reason anybody knows.
191If you already run NIST SP 800-161 Rev 1, that is the 191 controls behind this disclosure, already evidenced.
135And ISO 27001:2022 is not a separate programme. 135 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
132And ISO 27002:2022 is not a separate programme. 132 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
119And ISO 27701:2019 is not a separate programme. 119 of its controls are the same controls. If it is on next year's plan, that part of it is already done.
Tell me when Supply Chain Due Diligence files something new
One email when a public company newly discloses this, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.
Where this comes from
The left half is public record: SEC full-text search over 8-K filings, counted across a
14 day window against the equivalent window before it. You can check
every row.
The right half is ours: 723 frameworks and
20,473 controls, 531 of those frameworks verified against
their source documents, with the auditor evidence and common failure modes recorded control by
control. Controls appear here because their own text names this term.
Cite this
The Art of Service Signals. Supply Chain Due Diligence corporate disclosure activity: 15 filers against 9 in the prior period, in 10-K and 10-Q filings, this quarter against the same quarter last year. Accessed 22 November 2026. https://signals.theartofservice.com/t/supply-chain-due-diligence/
Free to use with attribution, no permission needed. The chart downloads as an SVG
with the source printed on it. If you cite it we would like to know, but you do not need to
ask.
Today's edition ·
How programmes fail ·
The obligation index