UK Construction (Design and Management) Regulations 2015 (CDM 2015)

88 controls. 2 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

88 controls 2 frameworks share controls with it Great Britain verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
CDM-DESIGNCHGManaging Design Change During Construction0
CDM-DOMESTICDomestic Client Projects0
CDM-DUSTConstruction Dust and Occupational Health0
CDM-ENFIncident Reporting and Enforcement Liaison1
CDM-HEIGHTWorking at Height0
CDM-R11Principal Designer Duties (Regulation 11)0
CDM-R12Construction Phase Plan0
CDM-R12-HHealth and Safety File1
CDM-R13Principal Contractor Duties (Regulation 13)0
CDM-R14Site Induction, Information and Training1
CDM-R15Consultation and Engagement with Workers1
CDM-R17Welfare Facilities (Schedule 2)0
CDM-R19Workplace Safety on Construction Sites0
CDM-R22Stability of Structures and Excavations0
CDM-R24Reports of Inspection0
CDM-R26Energy Distribution and Services on Site0
CDM-R29Emergency Procedures and Routes1
CDM-R4Client Duties (Regulation 4)0
CDM-R5Appointment of Principal Designer and Principal Contractor0
CDM-R6F10 Notification to HSE0
CDM-R8General Duties (Designers and Contractors)1
CDM-R9Designer Duties (Regulation 9)0
UKCDM-1Client, Principal Designer, Principal Contractor Duties0
UKCDM-2Risk Assessment, Pre-Construction Information, F100
UKCDM-3Construction Phase Plan and Site Safety0
UKCDM-4Worker Engagement, Training, Monitoring0
10Designs prepared outside Great Britain0
11.1-3Planning, managing and monitoring the pre-construction phase0
11.4-5Ensuring designers comply and cooperate0
11.6Pre-construction information0
11.7Liaison with the principal contractor0
12.1-4Construction phase plan0
12.5-10Health and safety file1
13.1-2Planning, managing and monitoring the construction phase0
13.3Coordinating contractors0
13.4Induction, site security and welfare0
13.5Liaison with the principal designer0
14Consulting and engaging with workers0
15.1Client aware of duties before work starts0
15.10-11Site access and welfare0
15.2-3Planning, managing and monitoring own work0
15.4-6Single-contractor projects0
15.7Competent workers0
15.8-9Supervision, instruction and information for workers0
17Safe places of work and access0
18Good order and site security0
19Stability of structures0
20Demolition and dismantling0
21Explosives0
22Excavations0
23Cofferdams and caissons0
24Reports of inspections0
25Energy distribution installations0
26Prevention of drowning0
27Traffic routes0
28Vehicles0
29Fire, flooding and asphyxiation0
30Emergency procedures0
31Emergency routes and exits0
32Fire detection and fire-fighting0
33Fresh air0
34Temperature and weather protection0
35Lighting0
4.1-3Suitable arrangements for managing the project1
4.4Pre-construction information1
4.5aConstruction phase plan in place before work starts0
4.5bHealth and safety file prepared, kept available and handed on0
4.6Ensuring principal designer and principal contractor perform0
4.8Multiple clients0
5Appointing principal designer and principal contractor0
6Notifying the enforcing authority0
7Projects for domestic clients0
8.1-3Skills, knowledge, experience and organisational capability1
8.4Cooperation0
8.5Reporting danger0
8.6Comprehensible and timely information1
9.1Client aware of duties before design starts0
9.2-3Eliminating, reducing and controlling design risks1
9.4Information with the design0
BSA-OVERLAYBuilding Safety Act 2022 dutyholder regime under the Building Regulations (England, from 1 October 2023)0
GENERALEnforcement for fire, transitional provisions, amendments and review (regulations 36 to 39, Schedules 4 and 5)0
REGSThe Regulations, amendments and guidance0
SCOPEDefinitions and application (regulations 2, 3 and 16)0
Sch2.1Sanitary conveniences0
Sch2.2Washing facilities0
Sch2.3Drinking water0
Sch2.4Changing rooms and lockers0
Sch2.5Facilities for rest0

Tell me when UK Construction (Design and Management) Regulations 2015 (CDM 2015) files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for UK Construction (Design and Management) Regulations 2015 (CDM 2015), drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.