CDM-DESIGNCHG | Managing Design Change During Construction | 0 |
CDM-DOMESTIC | Domestic Client Projects | 0 |
CDM-DUST | Construction Dust and Occupational Health | 0 |
CDM-ENF | Incident Reporting and Enforcement Liaison | 1 |
CDM-HEIGHT | Working at Height | 0 |
CDM-R11 | Principal Designer Duties (Regulation 11) | 0 |
CDM-R12 | Construction Phase Plan | 0 |
CDM-R12-H | Health and Safety File | 1 |
CDM-R13 | Principal Contractor Duties (Regulation 13) | 0 |
CDM-R14 | Site Induction, Information and Training | 1 |
CDM-R15 | Consultation and Engagement with Workers | 1 |
CDM-R17 | Welfare Facilities (Schedule 2) | 0 |
CDM-R19 | Workplace Safety on Construction Sites | 0 |
CDM-R22 | Stability of Structures and Excavations | 0 |
CDM-R24 | Reports of Inspection | 0 |
CDM-R26 | Energy Distribution and Services on Site | 0 |
CDM-R29 | Emergency Procedures and Routes | 1 |
CDM-R4 | Client Duties (Regulation 4) | 0 |
CDM-R5 | Appointment of Principal Designer and Principal Contractor | 0 |
CDM-R6 | F10 Notification to HSE | 0 |
CDM-R8 | General Duties (Designers and Contractors) | 1 |
CDM-R9 | Designer Duties (Regulation 9) | 0 |
UKCDM-1 | Client, Principal Designer, Principal Contractor Duties | 0 |
UKCDM-2 | Risk Assessment, Pre-Construction Information, F10 | 0 |
UKCDM-3 | Construction Phase Plan and Site Safety | 0 |
UKCDM-4 | Worker Engagement, Training, Monitoring | 0 |
10 | Designs prepared outside Great Britain | 0 |
11.1-3 | Planning, managing and monitoring the pre-construction phase | 0 |
11.4-5 | Ensuring designers comply and cooperate | 0 |
11.6 | Pre-construction information | 0 |
11.7 | Liaison with the principal contractor | 0 |
12.1-4 | Construction phase plan | 0 |
12.5-10 | Health and safety file | 1 |
13.1-2 | Planning, managing and monitoring the construction phase | 0 |
13.3 | Coordinating contractors | 0 |
13.4 | Induction, site security and welfare | 0 |
13.5 | Liaison with the principal designer | 0 |
14 | Consulting and engaging with workers | 0 |
15.1 | Client aware of duties before work starts | 0 |
15.10-11 | Site access and welfare | 0 |
15.2-3 | Planning, managing and monitoring own work | 0 |
15.4-6 | Single-contractor projects | 0 |
15.7 | Competent workers | 0 |
15.8-9 | Supervision, instruction and information for workers | 0 |
17 | Safe places of work and access | 0 |
18 | Good order and site security | 0 |
19 | Stability of structures | 0 |
20 | Demolition and dismantling | 0 |
21 | Explosives | 0 |
22 | Excavations | 0 |
23 | Cofferdams and caissons | 0 |
24 | Reports of inspections | 0 |
25 | Energy distribution installations | 0 |
26 | Prevention of drowning | 0 |
27 | Traffic routes | 0 |
28 | Vehicles | 0 |
29 | Fire, flooding and asphyxiation | 0 |
30 | Emergency procedures | 0 |
31 | Emergency routes and exits | 0 |
32 | Fire detection and fire-fighting | 0 |
33 | Fresh air | 0 |
34 | Temperature and weather protection | 0 |
35 | Lighting | 0 |
4.1-3 | Suitable arrangements for managing the project | 1 |
4.4 | Pre-construction information | 1 |
4.5a | Construction phase plan in place before work starts | 0 |
4.5b | Health and safety file prepared, kept available and handed on | 0 |
4.6 | Ensuring principal designer and principal contractor perform | 0 |
4.8 | Multiple clients | 0 |
5 | Appointing principal designer and principal contractor | 0 |
6 | Notifying the enforcing authority | 0 |
7 | Projects for domestic clients | 0 |
8.1-3 | Skills, knowledge, experience and organisational capability | 1 |
8.4 | Cooperation | 0 |
8.5 | Reporting danger | 0 |
8.6 | Comprehensible and timely information | 1 |
9.1 | Client aware of duties before design starts | 0 |
9.2-3 | Eliminating, reducing and controlling design risks | 1 |
9.4 | Information with the design | 0 |
BSA-OVERLAY | Building Safety Act 2022 dutyholder regime under the Building Regulations (England, from 1 October 2023) | 0 |
GENERAL | Enforcement for fire, transitional provisions, amendments and review (regulations 36 to 39, Schedules 4 and 5) | 0 |
REGS | The Regulations, amendments and guidance | 0 |
SCOPE | Definitions and application (regulations 2, 3 and 16) | 0 |
Sch2.1 | Sanitary conveniences | 0 |
Sch2.2 | Washing facilities | 0 |
Sch2.3 | Drinking water | 0 |
Sch2.4 | Changing rooms and lockers | 0 |
Sch2.5 | Facilities for rest | 0 |