International (NATO; applied by member and partner nations under STANAG 4107)

NATO AQAP 2110

52 controls. 64 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

52 controls 64 frameworks share controls with it International (NATO; applied by member and partner nations under STANAG 4107) verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

NATO AQAP 2110 Evidence & Implementation Kit

52 controls is the documentation set somebody has to write. This is that set, already written: an adopt-ready artifact for every control in policy and procedure text you edit rather than draft, and the evidence checklist an auditor asks for against each.

See what is in it, $249

The same set every buyer of this kit receives. Nothing here is produced on request.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

Every control

CodeControlAlso in
AQAP2110-1Quality Management System Aligned to ISO 9001 plus NATO Supplementary Requirements25
AQAP2110-2Government Quality Assurance Representative (GQAR) Authority and Access37
AQAP2110-3Design and Development Control - NATO plus ISO 13485 Cross-Walk9
AQAP2110-4Configuration Management and Change Control18
AQAP2110-5Risk and Opportunity Management17
AQAP2110-6Subcontractor Supply Chain Control plus Counterfeit Material Prevention25
AQAP2110-7Production, Special Processes, Inspection, Testing, and Records14
AQAP2110-8Internal Audit, Management Review, Corrective Action, CofC, and Continual Improvement14
4Chapter 4 General QMS requirements0
4.14.1 QMS meeting this publication, including ISO 9001:2015 as needed for the contract0
4.24.2 QMS evidence available to the GQAR, and corrective proposals if the QMS is rejected0
4.34.3 Give the GQAR access, information, facilities and assistance at Supplier and External Provider sites0
5.15.1 Leadership0
5.1.15.1.1 Appoint a management representative for GQA reporting directly to top management0
5.25.2 Planning0
5.2.15.2.1 Manage risk from contract review onward to ISO 31000 and share the risk plan0
5.35.3 Support0
5.3.15.3.1 Provide a segregation area for nonconforming product0
5.3.25.3.2 Run the contract's measurement and calibration system to ISO 10012 and report calibration failures0
5.3.35.3.3 Maintain a process for training needs and competence of everyone affecting product quality0
5.3.45.3.4 Make contract staff and External Providers aware of the quality plan arrangements0
5.3.55.3.5 Give the GQAR access to contract documented information in an agreed format0
5.45.4 Operation0
5.4.15.4.1 Define acceptance evidence and keep product and process approval records, including for External Providers0
5.4.1.15.4.1.1 Submit an acceptable contract Quality Plan with a requirement and solution compliance matrix before work starts0
5.4.1.25.4.1.2 Configuration Management0
5.4.1.2.15.4.1.2.1 Manage configuration to ACMP 2100 across planning, identification, change control, status accounting and audit0
5.4.1.2.25.4.1.2.2 Prepare a Configuration Management Plan for the contract0
5.4.105.4.10 Control shelf life and declare remaining life before delivery0
5.4.115.4.11 Release only acceptable product with a Certificate of Conformity and give 10 working days notice of Acquirer inspections0
5.4.125.4.12 Control, report and obtain authority for nonconforming product and concessions0
5.4.25.4.2 Hold the post-award GQA meeting, keep lines to the GQAR and report organisational changes0
5.4.35.4.3 Identify product requirements tied to critical characteristics0
5.4.45.4.4 Determine verification and validation methods and show conformity at stages up to the final product0
5.4.55.4.5 Control dependability issues and documents when the contract requires it0
5.4.65.4.6 Keep and share verification records of purchased product0
5.4.6.15.4.6.1 Know the supply chain for critical items and flow down contract requirements with the GQA clause0
5.4.6.25.4.6.2 Ensure External Provider processes are implemented and prevent counterfeit materiel0
5.4.6.35.4.6.3 Share sub-contracts and notify the GQAR of risky sub-contracts and rejected supplied product0
5.4.75.4.7 Maintain production instructions and workmanship criteria0
5.4.85.4.8 Maintain traceability wherever failure could cause loss of equipment, performance or life0
5.4.95.4.9 Report lost, damaged or unsuitable Acquirer-supplied property at once0
5.55.5 Performance evaluation0
5.5.15.5.1 Record GQAR-reported deficiencies as customer complaints and answer with root cause and corrective action0
5.5.25.5.2 Audit all contract-critical processes annually, including NATO supplements, and report findings0
5.5.35.5.3 Management review0
5.5.3.15.5.3.1 Make contract-related management review inputs available to the GQAR0
5.5.3.25.5.3.2 Share contract-related review outputs and notify actions affecting contract compliance0
5.65.6 Improvement0
5.6.15.6.1 Define the root cause analysis process, tools and techniques for nonconformities0
PUBLICATIONAQAP-2110 Edition D Version 1: the publication and its applicability0
STATUSEdition status: Edition D Version 1 (2016) is current; no Edition E or Version 2 exists in any published source0

Tell me when NATO AQAP 2110 files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What an auditor will ask you to produce

The artefacts named on the failure modes this framework speaks to.

  • Annual KVKK internal audit plan
  • Audit report and findings register
  • Remediation tracker
  • Board-level reporting evidence
  • Annual internal audit programme + reports
  • Management review minutes with AQAP inputs

How programmes fail on this

Failure modes named by this framework and others. Each opens the full record.

What this page is

A control-level reference for NATO AQAP 2110, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition