NABERS-1 | NABERS Governance, Accreditation, and Rating Methodology | 0 |
NABERS-2 | NABERS Energy Performance Rating | 3 |
NABERS-3 | NABERS Water Performance Rating | 27 |
NABERS-4 | NABERS Waste Performance Rating | 0 |
NABERS-5 | NABERS Indoor Environment Quality Rating | 0 |
NABERS-6 | NABERS Building Tuning, Commissioning, and Continuous Improvement | 3 |
NABERS-7 | Commercial Building Disclosure (CBD) and Mandatory Disclosure Compliance | 0 |
NABERS-8 | NABERS Reporting, Verification, Reratings, and Public Display | 0 |
AGR-COP-1 | Rate only through an individual accredited assessor following the Process Documents | 0 |
AGR-COP-2 | Keep assessor independence visible: disclose conflicts and take no outcome-based fees | 0 |
AGR-COP-3 | Co-operate with audits and remedy errors immediately | 0 |
AGR-COP-4 | Communicate about NABERS and its trade mark responsibly | 0 |
ATR-4 | Meet the Agreement to Rate milestones: occupancy within 6 years and ratings within 2 years | 0 |
ATR-6 | Give accurate information, keep project records seven years and notify transfers | 0 |
CA-1 | Enter a Commitment Agreement before claiming a design-stage NABERS target | 0 |
CA-4 | Produce a compliant energy estimate with margin, off-axis scenarios and risk assessment | 0 |
CA-6 | Pass Independent Design Review before the construction certificate | 0 |
CBD-11 | No offer to sell, lease or sublease without a registered current BEEC | 0 |
CBD-12 | Give a registered BEEC to a prospective purchaser, lessee or sublessee on request | 0 |
CBD-13 | Apply for the BEEC with an accredited energy rating and tenancy lighting assessment | 0 |
CBD-15 | Include the current NABERS Energy rating in every sale or lease advertisement | 0 |
CBD-17 | Hold a granted exemption before relying on one | 0 |
CBD-18 | Give the assessor information and access when the Secretary requires it | 0 |
CBD-19 | Use information obtained for a certificate only for permitted purposes | 0 |
CBD-20 | Assessor applies the determined methods and conditions of accreditation | 0 |
CBD-46-49 | Co-operate with auditors and answer the Secretary's compliance notices | 0 |
CBD-ACT | The Building Energy Efficiency Disclosure Act 2010: machinery for the state | 0 |
CBD-DAB | Determine whether the building or area is disclosure affected | 0 |
CBD-DET-5 | Express and display the rating in advertisements as the Determination requires | 0 |
CBD-DET-6 | Work out the CBD energy rating under the incorporated NABERS Offices Rules | 0 |
CBD-DET-7 | Perform the Tenancy Lighting Assessment under the CBD rules | 0 |
CBD-DET-8 | Certificate carries the prescribed building, rating, emissions and lighting content | 0 |
CBD-REG-9 | Meet the prescribed conditions of CBD accreditation | 0 |
EPI-3 | Confirm eligibility for an Energy Performance Indicator and the site visit type | 0 |
EPI-5 | Measure rated area and answer the energy usage highlights | 0 |
EPI-7 | Cover all energy for the part or whole premises and treat student accommodation facilities correctly | 0 |
EWO-3.2 | Confirm the premises is eligible for a Base Building, Whole Building or Tenancy rating | 0 |
EWO-3.3 | Rate on a 12-month period and lodge within 120 days | 0 |
EWO-3.4 | Base the rating on acceptable data, with estimates within the 5 % limit | 0 |
EWO-3.5 | Conduct a new site visit for every rating, physical where the Rules require it | 0 |
EWO-3.6 | Use the CBD Program before excluding space for missing tenant data | 0 |
EWO-3.7 | Keep records that let an auditor repeat the rating, for seven years | 0 |
EWO-3.8 | Obtain National Administrator approval for alternative methods and uncovered situations | 0 |
EWO-4.3 | Verify office Net Lettable Area to the measurement standard | 0 |
EWO-4.4 | Divide office NLA into functional spaces at the minimum required granularity | 0 |
EWO-4.5 | Exclude non-office and commercially negotiated spaces from the rated area | 0 |
EWO-4.5.4 | Treat computer server rooms and data centres as the Rules require | 0 |
EWO-4.5.5 | Treat meeting rooms and other office support facilities by rating scope | 0 |
EWO-4.5.6 | Exclude functional spaces without consumption data, with the required evidence | 0 |
EWO-4.6.2 | Cap public access space at 10 % of net office NLA | 0 |
EWO-4.6.3 | Limit medical and educational office facilities to 25 % in base building ratings only | 0 |
EWO-4.7 | Weight functional spaces by occupation days and up to 30 fitout days | 0 |
EWO-5.3.2 | Determine Core Hours from the Owner/Tenant Agreement correctly | 0 |
EWO-5.3.3 | Count after-hours air conditioning only from dated tenant requests | 0 |
EWO-5.3.4 | Use a Tenant Occupancy Survey only when higher-priority methods fail, completed by the right person | 0 |
EWO-5.3.5 | Apply default hours of 45 per week only as a documented fallback | 0 |
EWO-5.3.6 | Estimate Average Core Hours only as an acceptable estimate added to potential error | 0 |
EWO-5.3.7 | Set hours for separated server rooms and support facilities by scope | 0 |
EWO-5.4 | Verify rated hours of 60 or more per week | 0 |
EWO-5.5 | Enter Core Hours that vary over the period or the week as the Rules direct | 0 |
EWO-6.3.2 | Count only complete personal computer systems in regular use | 0 |
EWO-6.3.3 | Conduct an actual on-site count, timed for activity-based working | 0 |
EWO-6.3.4 | Estimate or apply the default count only where permitted | 0 |
EWO-7.2 | Cover the minimum energy end uses for the rating scope | 0 |
EWO-7.3.1 | Match server room energy treatment to its area treatment | 0 |
EWO-7.3.2 | Allocate supplementary air conditioning and other services between base building and tenant | 0 |
EWO-7.3.3 | Include energy of tenant-only spaces and exclude other spaces only when properly metered | 0 |
EWO-7.3.4 | Include and apportion car park energy by the car park rules | 0 |
EWO-7.4 | Cover all office water uses, including metered fire system water | 0 |
EWO-C.3 | Adjust rating periods and choose renew or replace for successive ratings correctly | 0 |
HTL-3 | Confirm hotel eligibility and classify the hotel type | 0 |
HTL-4 | Count guest rooms, out-of-service periods and laundry serviced rooms | 0 |
HTL-6 | Establish the hotel quality rating, pool area and function room seats | 0 |
HTL-9 | Cover all hotel energy and water end uses including charge-to-room facilities | 0 |
IE-3 | Choose the IE rating scope and collect every component it requires | 0 |
IE-4.3 | Determine office floor area, occupied floors and the number of sampling floors and points | 0 |
IE-4.6 | Select floors and locations by the priority rules and record them in a sample collection plan | 0 |
IE-5 | Run the Occupant Satisfaction Survey through an approved provider before measuring | 0 |
IE-6 | Conduct the site visit and spot measurements under normal operation | 0 |
IE-7 | Assess thermal services by spot measurements and verified annual temperature data | 0 |
IE-8 | Measure air quality components with the specified methods and windows | 0 |
IE-9 | Measure ambient sound and horizontal illuminance as specified | 0 |
MC-10 | Evidence every renewable claim in the Renewable Energy Indicator | 0 |
MC-3.2 | Apply the common data hierarchy and enter data exactly as sourced | 0 |
MC-4.2 | Identify every energy and water source and supply point on site | 0 |
MC-4.3 | Check sources against minimum coverage and run the office and retail cross-checks | 0 |
MC-4.4 | Confirm meter types and use non-utility meters only as the Rules allow | 0 |
MC-5.3 | Secure 12 months of acceptable utility data aligned to the rating period | 0 |
MC-5.4 | Correct estimated or missing utility readings by the permitted methods | 0 |
MC-5.5 | Report water with and without purchased recycled water | 0 |
MC-6 | Handle non-utility meter data to the same 12-month standard | 0 |
MC-7 | Validate CT, gas and remote-read meters and meet the 10-year validation schedule | 0 |
MC-7.4 | Correct or stop when validation finds a faulty meter | 0 |
MC-8.2 | Estimate small unmetered loads and apportioned exclusions only within the Rules | 0 |
MC-8.3 | Account for batch-delivered fuels and water and for EV charging | 0 |
MC-9 | Treat on-site generation, storage and captured water by the Rules | 0 |
PRT-3 | Calculate and publish portfolio ratings by the aggregation and disclosure rules | 0 |
PRT-4 | Obtain exemptions for ineligible or atypical assets and apply optional exclusions uniformly | 0 |
SCHEME | NABERS: the scheme and its rating tools | 0 |
SFC-1 | Evidence sustainable finance alignment with NABERS ratings | 0 |
STATUS | Status: current versions, the 2026 Determination and pending sunsets | 0 |
WST-10 | Lodge, rate and keep records under the waste validity and precinct rules | 0 |
WST-3.6 | Visit site for every waste rating and verify configuration and practices | 0 |
WST-5 | Include every core waste stream and only eligible optional streams | 0 |
WST-6 | Record at least 90 % of collections with measured weights or bin counts | 0 |
WST-7 | Conduct contamination, density and composition audits by the procedure | 0 |
WST-8 | Verify weight and bin-count data against the tests and a second source | 0 |
WST-9 | Evidence recovery pathways for the Material Recovery Score | 0 |