Ch1-defs-construction | r 5 Definitions: construction, excavation and related terms | 0 |
Ch1-defs-controls | r 5 Definitions: control types, manual handling, noise and health monitoring | 0 |
Ch1-defs-falls | r 5 Definitions: falls, work at height and scaffolding | 0 |
Ch1-defs-hazards | r 5 Definitions: asbestos, crystalline silica, high risk work and confined spaces | 0 |
Ch1-incorporated | rr 13 to 16 Incorporated documents (Part 1.2) | 0 |
Ch1-objectives | rr 1 to 4 Objectives, authorising provisions, commencement and revocation | 0 |
Ch1-r6-6A | rr 6 and 6A Determinations made by the Authority | 0 |
Ch1-r7-12 | rr 7 to 12 Act compliance notes, independent contractors, HSRs, designers and self-employed persons | 0 |
Ch7-admin | Chapter 7 Part 7.1: applications, notices and submissions (rr 532 to 535) | 0 |
Ch7-exempt | Chapter 7 Part 7.2: exemptions granted by the Authority (rr 537 to 539, 541 to 543, 545 to 547, 549 to 553) | 0 |
Ch7A-committee | Chapter 7A: Workplace Incidents Consultative Committee membership (rr 553A to 553J) | 0 |
Ch7A-procedure | Chapter 7A: Committee meetings, support, conflicts, confidentiality and review (rr 553K to 553O) | 0 |
Ch7B-infringements | Chapter 7B: infringement offences and penalties (r 553P and Schedule 20) | 0 |
Ch8-transitional | Chapter 8: saving and transitional provisions (rr 554 to 560A) | 0 |
P2.1-intro | Part 2.1 General duties: scope | 0 |
P2.2-intro | r 22 Part 2.2 Issue resolution: application | 0 |
P3.3-intro | rr 41 and 42 Part 3.3 Prevention of falls: application | 0 |
P3.4-intro | rr 50 and 54 Part 3.4 Confined spaces: application | 0 |
P3.5-D5-intro | Division 5 duties of employers and self-employed persons who use plant: scope (rr 96 and 108) | 0 |
P3.5-intro | Part 3.5 Plant: scope and hazard identification by class (rr 74 and 75) | 0 |
P3.5-sched2 | Schedule 2: plant whose design must be registered (referred to in rr 106, 125 and 126) | 0 |
P3.6-D3-intro | Assessment instruments and re-assessment (rr 136 and 137) | 0 |
P3.6-sched3 | Schedule 3: high risk work licence classes (referred to in r 5 and r 130) | 0 |
P4.1-Sub2-intro | Division 3 Subdivision 2: which substances the employer duties cover (r 154) | 0 |
P4.1-intro | Part 4.1 Hazardous substances: scope and application (rr 140 to 142) | 0 |
P4.1-schedules | Schedules 6, 8 and 9 supporting Part 4.1 | 0 |
P4.2-intro | Part 4.2 Scheduled carcinogenic substances: scope and Schedules 10 and 11 | 0 |
P4.3-intro | Part 4.3 Lead: application, reproductive capacity, Authority determinations and monitoring terms (rr 177, 179 to 181) | 0 |
P4.3-r178 | r 178 What is a lead process | 0 |
P4.3-r193 | r 193 What is lead-risk work | 0 |
P4.4-Div4-intro | Division 4 Dangerous Goods Act prohibitions: exclusions (r 217) | 0 |
P4.4-Div5-intro | Division 5 Asbestos in workplaces: application (r 225) | 0 |
P4.4-Div6-intro | Division 6 Demolition and refurbishment where asbestos is present: application (r 240) | 0 |
P4.4-Div7-intro | Division 7 Removal of asbestos: application and limited removal work (rr 249 and 250) | 0 |
P4.4-Div8-intro | Division 8 Activities involving asbestos: application (r 302) | 0 |
P4.4-Sub5-intro | Subdivision 5 Duties of the person who commissions asbestos removal work (r 291) | 0 |
P4.4-intro | Part 4.4 Asbestos: structure, application and key terms | 0 |
P4.4-r207 | r 207 Meaning of independent person for asbestos removal functions | 0 |
P4.4-sched12 | Schedule 12 Contents of an asbestos control plan (r 272) | 0 |
P4.4-sched13 | Schedule 13 Contents of a notice of asbestos removal work (rr 298 and 299) | 0 |
P4.5-Div4-exceptions | rr 319Z to 319ZB Exceptions to the engineered stone prohibition | 0 |
P4.5-app | Part 4.5 Crystalline silica: commencement and scope of the manufacturer and employer Divisions (rr 319F, 319I, 319P) | 0 |
P4.5-intro | Part 4.5 Crystalline silica: application and key definitions (rr 319A to 319E) | 0 |
P5.1-card-intro | rr 345 to 351 Construction induction cards: Authority powers, content, duration, lapse and cancellation | 0 |
P5.1-cit-intro | r 338 Application of the construction induction training Division | 0 |
P5.1-exc-intro | r 354 Application of the construction excavation notice Division | 0 |
P5.1-hrcw | rr 322 and 324 High risk construction work categories and SWMS content | 0 |
P5.1-intro | Part 5.1 Construction: application, construction work and structure (rr 320, 321, 323) | 0 |
P5.1-pc-intro | rr 332 and 333 Principal contractor Subdivision: threshold and who is the principal contractor | 0 |
P5.2-authority | Authority information notices and MHF determinations (Divisions 3 and 4 machinery) | 0 |
P5.2-intro | Part 5.2 Major hazard facilities: application and counting Schedule 14 materials | 0 |
P5.2-sch14 | Schedule 14 materials and threshold quantities | 0 |
P5.2-schedules | Schedules 15 to 18: content of the MHF safety management system, emergency plan, safety case and notices | 0 |
P5.3-intro | Part 5.3 Mines: definitions, mining hazards and prescribed mines | 0 |
P6.1-Div1-HRW | Part 6.1 Division 1 Subdivision 2: extra grounds for refusing a high risk work licence (r 459) | 0 |
P6.1-Div1-MHF | Part 6.1 Division 1 Subdivision 5: Authority tests and timing for major hazard facility licences (rr 470 and 471) | 0 |
P6.1-Div1-grant | Part 6.1 Division 1 Subdivision 1: how the Authority decides a licence application (rr 452 to 457) | 0 |
P6.1-Div2-MHF | Part 6.1 Division 2 Subdivision 2: transfer and public notice of major hazard facility licences (rr 479 and 480) | 0 |
P6.1-Div3 | Part 6.1 Division 3: amendment of licences by the Authority (rr 482 and 483) | 0 |
P6.1-Div4-renew | Part 6.1 Division 4: how the Authority decides renewals and how long a licence continues (rr 486 to 489, 491) | 0 |
P6.1-Div5 | Part 6.1 Division 5: suspension and cancellation of licences (rr 496 to 505) | 0 |
P6.1-intro | Part 6.1 Licences: scope and structure | 0 |
P6.2-Div2-decide | Part 6.2 Division 2: Authority deferral, refusal and notice for plant design registration (rr 511 to 513) | 0 |
P6.2-Div2A-decide | Part 6.2 Division 2A: Authority decisions on amusement structure item registration (rr 513A, 513D to 513K) | 0 |
P6.2-Div2B | Part 6.2 Division 2B: amendment of amusement structure item registrations (rr 513M to 513P) | 0 |
P6.2-Div3 | Part 6.2 Division 3: registration and expiry of a major hazard facility (rr 515 to 519) | 0 |
P6.2-Div4 | Part 6.2 Division 4: withdrawal of registration (rr 520 and 521) | 0 |
P6.2-intro | Part 6.2 Registration: application of the Part (r 507) | 0 |
P6.3-decisions | Part 6.3: reviewable decisions and process review (rr 524 and 525) | 0 |
P6.3-process | Part 6.3: who may seek review, time limits, Authority review and VCAT (rr 526 to 531) | 0 |
Sched-1 | Schedule 1 Revocation of Regulations | 0 |
Sched-12-13 | Schedules 12 and 13 Asbestos control plan and notice of asbestos removal work | 0 |
Sched-14 | Schedule 14 Materials and their threshold quantities | 0 |
Sched-15-17 | Schedules 15 to 17 Major hazard facility safety management system, emergency plan and safety case content | 0 |
Sched-18 | Schedule 18 Information in a notice under rr 360 and 423A or a registration application under r 514 | 0 |
Sched-19 | Schedule 19 Entry permit statement | 0 |
Sched-2 | Schedule 2 Plant requiring registration of design | 0 |
Sched-20 | Schedule 20 Infringement offences and infringement penalties | 0 |
Sched-3-P1 | Schedule 3 Part 1 High risk work licence classes: scaffolding, dogging and rigging | 0 |
Sched-3-P2 | Schedule 3 Part 2 High risk work licence classes: cranes, hoists and forklift trucks | 0 |
Sched-3-P3 | Schedule 3 Part 3 High risk work licence classes: pressure equipment operation | 0 |
Sched-4 | Schedule 4 Pressure equipment for which a high risk work licence is not required | 0 |
Sched-5 | Schedule 5 High risk work competency requirements | 0 |
Sched-6-11 | Schedules 6 to 11 Hazardous substances and carcinogens supporting schedules | 0 |
r100 | r 100 Employer must guard or insulate hot and cold plant parts | 0 |
r101 | r 101 Employer must ensure operator controls are suitable | 0 |
r102 | r 102 Employer must ensure emergency stop devices are suitable | 0 |
r103 | r 103 Employer must position emergency warning devices effectively | 0 |
r104 | r 104 Employer must install, commission and decommission plant safely | 0 |
r105 | r 105 Employer must inspect plant in use and prevent unauthorised alteration | 0 |
r106 | r 106 Employer must keep inspection and maintenance records for specified plant | 0 |
r106A-2 | r 106A(1) to (3) Keep a complete logbook and the manuals with the amusement structure | 0 |
r106A-4-5 | r 106A(4) to (7) Give access to the amusement structure logbook and manuals and hand them over | 0 |
r107 | r 107 Employer must leave idle plant in a safe state | 0 |
r109 | r 109 Powered mobile plant: overturning, falling objects, ejection, collisions and riders | 0 |
r110 | r 110 Warning devices on powered mobile plant | 0 |
r111 | r 111 Tractors must have roll-over protection | 0 |
r112-113 | rr 112 and 113 Industrial lift trucks: attachments, operating conditions, passengers and warnings | 0 |
r114 | r 114 Electrical plant and plant exposed to electrical hazards | 0 |
r115 | r 115 Plant used to lift or suspend loads | 0 |
r116 | r 116 Lifts: lift well falls, falling objects and car movement | 0 |
r117 | r 117 Display rated capacity notice in lifts | 0 |
r118 | r 118 Scaffolds: completion, security, repairs and unauthorised access | 0 |
r119 | r 119 Tower cranes: foundations and tie placement designed by an engineer | 0 |
r120 | r 120 Keep tower crane foundation and tie design information available | 0 |
r121 | r 121 Review and revise plant risk control measures | 0 |
r122 | r 122 Information, instruction and training for plant hazards | 0 |
r123 | r 123 Information for persons involved in a plant activity | 0 |
r124 | r 124 Notify the Authority of incidents involving prescribed plant | 0 |
r125 | r 125 Design of Schedule 2 plant must be registered | 0 |
r126 | r 126 Altered designs of Schedule 2 plant must be registered | 0 |
r127-127B | Recognition of interstate plant designs and certificates of interstate recognition (rr 127, 127A and 127B) | 0 |
r127C | r 127C Items of Schedule 2 amusement structures must be registered | 0 |
r128 | r 128 Do not perform high risk work without an appropriate licence | 0 |
r129 | r 129 Employer must not allow an unlicensed employee to perform high risk work | 0 |
r130 | r 130 Exceptions to the licensing requirements in rr 128 and 129 | 0 |
r131 | r 131 Recognition of interstate high risk work licences | 0 |
r132 | r 132 Employer must directly supervise high risk work trainees | 0 |
r133 | r 133 Training provider must supervise participants doing high risk work | 0 |
r134 | r 134 Authorised assessor must issue a notice of assessment with reasons | 0 |
r135 | r 135 Assessor must follow the Authority's assessment instruments and procedures | 0 |
r138 | r 138 Conditions for working while a licence or renewal application is processed | 0 |
r139 | r 139 Authorisation of assessors | 0 |
r143 | r 143 Determine whether a substance is hazardous before first supply | 0 |
r144 | r 144 Prepare a safety data sheet before first supply | 0 |
r145 | r 145 Include the required content in a safety data sheet | 0 |
r146 | r 146 Review and revise the safety data sheet at least every 5 years | 0 |
r147-148 | rr 147 and 148 Provide the current and any revised safety data sheet to recipients | 0 |
r149 | r 149 Manufacturers and importing suppliers must label containers | 0 |
r150 | r 150 Use a recognised alternative labelling system correctly | 0 |
r151 | r 151 Supplier must ensure container carries the manufacturer's or importer's label | 0 |
r152 | r 152 Disclose an ingredient's chemical identity to a treating doctor | 0 |
r153 | r 153 Do not use prohibited hazardous substances | 0 |
r155 | r 155 Obtain a current safety data sheet | 0 |
r156 | r 156 Keep the safety data sheet readily accessible to exposed employees | 0 |
r157 | r 157 Do not alter the information in a safety data sheet | 0 |
r158 | r 158 Keep containers labelled, including decanted containers | 0 |
r159 | r 159 Keep containers labelled until cleaned or neutralised | 0 |
r160 | r 160 Identify hazardous substances in pipes, vessels and process plant | 0 |
r161 | r 161 Identify containers of hazardous substance waste | 0 |
r162 | r 162 Prepare and maintain a register of hazardous substances | 0 |
r163 | r 163 Control risks from hazardous substances using the hierarchy | 0 |
r164 | r 164 Review hazardous substance risk controls on the listed triggers | 0 |
r165 | r 165 Keep exposure below the exposure standard | 0 |
r166 | r 166 Carry out atmospheric monitoring where required | 0 |
r167 | r 167 Give atmospheric monitoring results to exposed employees | 0 |
r168 | r 168 Keep atmospheric monitoring records for 30 years | 0 |
r169 | r 169 Provide health monitoring for Schedule 9 substances | 0 |
r170 | r 170 Send the health monitoring report to the Authority where removal is recommended | 0 |
r171 | r 171 Keep health monitoring reports for 30 years | 0 |
r173 | r 173 Supply scheduled carcinogens only to licence holders and keep supply records | 0 |
r174 | r 174 Hold a carcinogens licence before working with a scheduled carcinogen | 0 |
r175 | r 175 Record each person who works with a scheduled carcinogen and keep for 30 years | 0 |
r176 | r 176 Give a written statement to a person who stops working with a scheduled carcinogen | 0 |
r18 | r 18 Properly install, use and maintain required risk control measures | 0 |
r182 | r 182 Inform job applicants about lead health risks and monitoring | 0 |
r183 | r 183 Inform employees about medical examinations and biological monitoring before starting | 0 |
r184 | r 184 Control lead exposure risks using the hierarchy | 0 |
r185 | r 185 Review lead risk controls on the listed triggers | 0 |
r186-1A | r 186(1) and (1A) Keep airborne lead below the lead exposure standard | 0 |
r186-2 | r 186(2) Monitor airborne lead where required | 0 |
r187 | r 187 Give airborne lead monitoring results to exposed employees | 0 |
r188 | r 188 Confine lead contamination to the lead process area | 0 |
r189 | r 189 Keep lead areas clean using safe cleaning methods | 0 |
r19 | r 19 Inform employees about, and pay for, required medical examinations and health monitoring | 0 |
r190 | r 190 Stop eating, drinking and smoking in lead areas and provide a clean eating area | 0 |
r191 | r 191 Provide and maintain changing and washing facilities | 0 |
r192 | r 192 Launder, dispose of and control removal of lead-contaminated clothing | 0 |
r194 | r 194 Identify whether a lead process is lead-risk work | 0 |
r195 | r 195 Notify the Authority of lead-risk work within 7 days and keep the notice | 0 |
r196 | r 196 Arrange health monitoring before and soon after starting lead-risk work | 0 |
r197 | r 197 Arrange health monitoring when work is later identified as lead-risk work | 0 |
r198 | r 198 Conduct biological monitoring at the required intervals | 0 |
r199 | r 199 Remove employees from lead-risk work at the removal levels | 0 |
r20 | r 20 Keep health monitoring reports confidential and release copies only as permitted | 0 |
r200 | r 200 Arrange a medical examination within 7 days of removal | 0 |
r201 | r 201 Manage return to lead-risk work after medical removal | 0 |
r202 | r 202 Brief the examining doctor and obtain the required reports | 0 |
r203 | r 203 Send biological monitoring and medical reports to the Authority after removal | 0 |
r204 | r 204 Keep lead medical and biological monitoring records for 30 years | 0 |
r205 | r 205 Employee duties in lead process areas | 0 |
r208 | r 208 Treat uncertain dust as asbestos-contaminated or have it analysed | 0 |
r209 | r 209 Workplace controller must eliminate or minimise airborne asbestos exposure | 0 |
r21 | r 21 Involve the health and safety representative when consulting employees | 0 |
r210 | r 210 Employer or self-employed individual must keep asbestos exposure below the standard | 0 |
r211 | r 211 Employer must determine employee asbestos exposure when in doubt | 0 |
r212 | r 212 Employer must make asbestos air monitoring results accessible to HSRs and employees | 0 |
r213 | r 213 Use an approved asbestos laboratory for required analysis | 0 |
r214 | r 214 Do not perform or arrange asbestos removal except under Division 7 | 0 |
r215 | r 215 Contaminated protective clothing may leave a workplace only for disposal or approved laundering | 0 |
r216a | r 216(1) to (4) Brooms, brushes, water jets and power tools on asbestos only under control | 0 |
r216b | r 216(5) and (6) Restrict compressed air and gases near asbestos | 0 |
r218 | r 218 Do not manufacture asbestos-containing material | 0 |
r219 | r 219 Do not supply asbestos | 0 |
r220 | r 220 Do not store asbestos except waste or clothing held for disposal or laundering | 0 |
r221 | r 221 Do not transport asbestos except for disposal or laundering | 0 |
r222 | r 222 Do not sell asbestos | 0 |
r223 | r 223 Do not use asbestos | 0 |
r224 | r 224 Do not install, re-use or replace with asbestos-containing material | 0 |
r226 | r 226 Workplace controller must identify asbestos, record its features and label it | 0 |
r227 | r 227 Workplace controller must keep an asbestos register | 0 |
r228 | r 228 Keep the asbestos register current and review it at least every 5 years | 0 |
r229 | r 229 Workplace controller must give copies of, and access to, the asbestos register | 0 |
r23 | r 23 Notify who will represent the employer and the employees in issue resolution | 0 |
r230 | r 230 Hand over the asbestos register when relinquishing management or control | 0 |
r231 | r 231 Workplace controller must remove asbestos, or else enclose, or else seal it | 0 |
r232 | r 232 Workplace controller must review asbestos risk controls on set triggers | 0 |
r233 | r 233 Employer must obtain the site register and identify asbestos under its own control | 0 |
r234 | r 234 Employer must tell the workplace controller about asbestos risks it identifies | 0 |
r235 | r 235 Employer must keep an employer's asbestos register | 0 |
r236 | r 236 Keep the employer's asbestos register current, review on HSR request and every 5 years | 0 |
r237 | r 237 Employer must give access to and copies of its asbestos register | 0 |
r238 | r 238 Employer must remove asbestos, or else enclose, or else seal it | 0 |
r239 | r 239 Employer must review asbestos risk controls on triggers and on HSR request | 0 |
r24 | r 24 Report health and safety issues to the HSR or employer | 0 |
r241 | r 241 Review the asbestos register before demolition or refurbishment and give it to the contractor | 0 |
r242 | r 242 Employer controlling asbestos must review its register before demolition or refurbishment | 0 |
r243 | r 243 Demolition or refurbishment contractor must obtain the asbestos registers | 0 |
r244a | r 244(1) Workplace controller must identify and remove asbestos before refurbishment or demolition | 0 |
r244b | r 244(2) Employer must identify and remove its asbestos before refurbishment or demolition | 0 |
r244c | r 244(5) and (6) Contractor on domestic premises must identify and remove asbestos before the work | 0 |
r245 | r 245 Contractor must determine whether asbestos is present where there is no register | 0 |
r246 | r 246 Asbestos required to be removed under r 244 must go to a licensed or permitted remover | 0 |
r247a | r 247(1) Workplace controller must document an emergency demolition procedure | 0 |
r247b | r 247(3) Person engaged for emergency asbestos removal must follow Division 7 | 0 |
r247c | r 247(4) Demolition contractor must document an emergency procedure on domestic premises | 0 |
r248a | r 248(1) Workplace controller must notify WorkSafe of an emergency before demolition | 0 |
r248b | r 248(2) Domestic premises demolition contractor must notify WorkSafe of an emergency | 0 |
r25-1 | r 25(1) and (2) Meet promptly to resolve the issue and weigh the listed matters | 0 |
r25-3 | r 25(3) Put the resolution in writing on request | 0 |
r25-4 | r 25(4) to (6) Communicate the agreed resolution to affected employees and the committee | 0 |
r251 | r 251 Employer doing limited removal must record training and keep it on site | 0 |
r252 | r 252 Self-employed person must be trained before limited removal and keep the record | 0 |
r253 | r 253 Obtain the relevant asbestos register before limited removal work | 0 |
r254 | r 254 Employer must supply and fit suitable PPE and RPE for limited removal | 0 |
r255 | r 255 Signs and barricades around limited removal work | 0 |
r256 | r 256 Decontamination facilities and PPE removal controls for limited removal | 0 |
r257 | r 257 Decontaminate or seal equipment before it leaves a limited removal area | 0 |
r258 | r 258 Carry out limited removal so fibres are not released and adjacent areas stay clean | 0 |
r259 | r 259 Contain and label limited removal waste | 0 |
r26 | r 26 Identify hazardous manual handling | 0 |
r260 | r 260 Dispose of limited removal waste promptly at an EPA-authorised site | 0 |
r261 | r 261 Launder contaminated clothing only at an asbestos-equipped laundry, contained and labelled | 0 |
r262 | r 262 Health monitoring for employees in ongoing limited removal work | 0 |
r263 | r 263 Obtain and keep medical examination summaries for limited removal workers | 0 |
r264 | r 264 Only Class A licence holders, their employees or supervised excavator contractors may do Class A work | 0 |
r265 | r 265 Only Class A or Class B licence holders or their employees may do Class B work | 0 |
r266 | r 266 Appoint only Authority-accepted nominees as asbestos removal supervisors | 0 |
r267 | r 267 Keep the Class B supervisor readily accessible | 0 |
r268 | r 268 Give job applicants and contractors information on asbestos health risks and medicals | 0 |
r269 | r 269 Licence holder must train all persons before they do asbestos removal | 0 |
r27 | r 27 Control the risk of musculoskeletal disorder from hazardous manual handling | 0 |
r270 | r 270 Licence holder must record training and keep it on site | 0 |
r271 | r 271 Licence holder must obtain the asbestos register from the commissioning person | 0 |
r272 | r 272 Prepare an asbestos control plan before removal work | 0 |
r273 | r 273 Give the control plan to the client and keep it accessible on site | 0 |
r274 | r 274 Licence holder must carry out removal so fibres are not released and nearby areas stay clean | 0 |
r275 | r 275 Act on control level (0.01 f/ml) and stop work at 0.05 f/ml | 0 |
r276 | r 276 Licence holder must provide and fit suitable PPE and RPE | 0 |
r277 | r 277 Signs, barricades and restricted access for licensed removal | 0 |
r278 | r 278 Decontamination facilities, PPE exit controls and equipment decontamination for licensed removal | 0 |
r279 | r 279 Contain and label licensed removal waste | 0 |
r28 | r 28 Review manual handling risk controls | 0 |
r280 | r 280 Dispose of licensed removal waste promptly at an EPA-authorised site | 0 |
r281 | r 281 Launder licensed removal clothing only at an asbestos-equipped laundry, contained and labelled | 0 |
r282 | r 282 Health monitoring for all persons doing licensed asbestos removal | 0 |
r283 | r 283 Obtain and keep medical summaries for licensed removal workers | 0 |
r285 | r 285 Asbestos removal supervisor on site for all Class A work | 0 |
r286 | r 286 Enclose, smoke test and use wet methods for Class A work | 0 |
r287 | r 287 Do not start or restart Class A work until required air monitoring is running and results are in | 0 |
r288 | r 288 Make Class A air monitoring results readily accessible to employees | 0 |
r289 | r 289 Dismantle and dispose of glove bags properly | 0 |
r29-31 | rr 29 to 31 Designers, manufacturers and suppliers of plant: sound power level | 0 |
r290 | r 290 Keep the Class A enclosure until clearance air results are at or below 0.01 f/ml, then dismantle safely | 0 |
r292 | r 292 Commissioning person must arrange air monitoring for Class A work | 0 |
r293 | r 293 Commissioning person must pass on Class A monitoring results | 0 |
r294 | r 294 Commissioning person must arrange an independent visual clearance inspection and Class A clearance air monitoring | 0 |
r295 | r 295 Commissioning person must give inspection and monitoring results to the licence holder | 0 |
r296 | r 296 Commissioning person must ensure the independent person is competent | 0 |
r297 | r 297 Commissioning person must obtain a clearance certificate before re-occupation | 0 |
r298 | r 298 Licence holder must notify WorkSafe before asbestos removal work | 0 |
r299 | r 299 Notify WorkSafe within 24 hours of removal in an unexpected situation | 0 |
r300 | r 300 Employer must tell employees in immediate and adjacent areas before removal starts | 0 |
r301 | r 301 Notification chain before asbestos removal: contractor, commissioning person, neighbouring occupiers | 0 |
r303 | r 303 Employer must identify whether asbestos-related activities occur at its workplace | 0 |
r304 | r 304 Assume asbestos or sample where an activity's status is uncertain | 0 |
r305 | r 305 Employer must obtain registers for specified asbestos-related activities | 0 |
r306 | r 306 Carry out asbestos-related activities so no airborne fibres are released | 0 |
r307 | r 307 Apply the hierarchy of control and provide suitable fitted PPE for asbestos-related activities | 0 |
r308 | r 308 Review asbestos-related activity controls on triggers and HSR request | 0 |
r309 | r 309 Keep the asbestos-related activity work area separate and signed | 0 |
r310 | r 310 Keep the work area clean using methods that do not spread fibres | 0 |
r311 | r 311 Health monitoring and supporting air monitoring for asbestos-related activities | 0 |
r312 | r 312 Make atmospheric monitoring results accessible for asbestos-related activities | 0 |
r313 | r 313 Obtain and keep medical summaries for asbestos-related activity workers for 30 years | 0 |
r314 | r 314 Decontaminate or contain PPE and equipment leaving the activity work area | 0 |
r315 | r 315 Contain and label asbestos no longer needed for the activity | 0 |
r316 | r 316 Dispose of activity asbestos waste promptly at an EPA-authorised site | 0 |
r317 | r 317 Launder activity clothing only at an asbestos-equipped laundry, contained and labelled | 0 |
r318 | r 318 Tell job applicants about asbestos hazards and risks | 0 |
r319 | r 319 Record asbestos-related activity training and keep it while applicable | 0 |
r319G | r 319G Give information about crystalline silica substances | 0 |
r319H | r 319H Review and revise crystalline silica substance information | 0 |
r319J | r 319J Identify high risk crystalline silica work before starting a process | 0 |
r319K-1 | r 319K(1) Make a written record of the silica risk assessment | 0 |
r319K-2 | r 319K(2) Keep the silica risk assessment record while the process continues | 0 |
r319K-3 | r 319K(3) Make the silica risk assessment record accessible to employees and HSRs | 0 |
r319L-1 | r 319L(1) Prepare a CSHCS before high risk crystalline silica work and follow it | 0 |
r319L-2 | r 319L(2) Stop high risk crystalline silica work that departs from the CSHCS | 0 |
r319M | r 319M Review and revise the CSHCS | 0 |
r319N | r 319N Keep a copy of the CSHCS for the duration of the work | 0 |
r319O | r 319O Sample and analyse material before quarrying or tunnelling work | 0 |
r319Q | r 319Q Inform job applicants about crystalline silica risks | 0 |
r319R | r 319R Information, instruction and training for employees in high risk silica work | 0 |
r319S | r 319S Use water suppression, on tool extraction or LEV on engineered stone tools | 0 |
r319T | r 319T Design and install engineered stone dust control systems | 0 |
r319U | r 319U Use and maintain engineered stone dust control systems | 0 |
r319V-1 | r 319V(1) Provide respiratory protective equipment for engineered stone processes | 0 |
r319V-2 | r 319V(2) Ensure employees use the respiratory protective equipment | 0 |
r319W | r 319W Train engineered stone tool users and RPE wearers | 0 |
r319X | r 319X Do not clean with compressed air in engineered stone areas | 0 |
r319Y | r 319Y Engineered stone benchtops, panels and slabs prohibition | 0 |
r319ZC | r 319ZC Specialist-supervised health monitoring for former engineered stone licence holders | 0 |
r319ZD | r 319ZD Send health monitoring reports to the Authority within 30 days | 0 |
r319ZE | r 319ZE Statement of work for employees of former engineered stone licence holders | 0 |
r32 | r 32 Determine employee noise exposure where it is uncertain | 0 |
r325 | r 325 Control risks associated with construction work | 0 |
r326 | r 326 Review and revise construction risk control measures | 0 |
r327-1a | r 327(1)(a) Prepare a SWMS before high risk construction work starts | 0 |
r327-1b | r 327(1)(b) Perform high risk construction work in accordance with the SWMS | 0 |
r327-2 | r 327(2) Stop work that does not comply with the SWMS | 0 |
r328 | r 328 Review and revise the SWMS | 0 |
r329 | r 329 Keep a copy of the SWMS for the duration of the work | 0 |
r33 | r 33 Record noise determinations and make them accessible | 0 |
r330 | r 330 Provide site-specific OHS training | 0 |
r331-2 | r 331(2) and (3) Establish engulfment emergency procedures before work starts | 0 |
r331-4 | r 331(4) Control the risks of carrying out the engulfment rescue | 0 |
r331-5 | r 331(5) Carry out engulfment emergency procedures immediately | 0 |
r334 | r 334 Display principal contractor signage | 0 |
r335-a | r 335(a) Prepare a health and safety co-ordination plan before work starts | 0 |
r335-b | r 335(b) Monitor, maintain and update the co-ordination plan | 0 |
r336 | r 336 Content of the health and safety co-ordination plan | 0 |
r337-1 | r 337(1) Keep the co-ordination plan and make it available for inspection | 0 |
r337-2 | r 337(2) Make each worker aware of the co-ordination plan before they start | 0 |
r339 | r 339 Provide construction induction training | 0 |
r34 | r 34 Keep employee noise exposure within the standard using the control hierarchy | 0 |
r340 | r 340 Hold a current construction induction card to do construction work | 0 |
r341 | r 341 Do not knowingly allow a worker without a current card to do construction work | 0 |
r342 | r 342 Meet the conditions of the construction induction exemptions | 0 |
r343 | r 343 Do not refuse to accept valid induction evidence | 0 |
r344 | r 344 Apply for a construction induction card with the required evidence and fee | 0 |
r348-1 | r 348(1) Do not destroy, alter or deface a construction induction card | 0 |
r35 | r 35 Mark where and when hearing protectors must be worn | 0 |
r352 | r 352 Keep the construction induction card available for inspection | 0 |
r353 | r 353 Tell the Authority about changes to card information | 0 |
r355-1 | r 355(1) Notify the Authority at least 3 days before construction excavation work | 0 |
r355-2 | r 355(2) Include the required details in the excavation notice | 0 |
r356 | r 356(3) Registered MHF operator meets Divisions 6, 7 and 9 as far as reasonably practicable | 0 |
r358 | r 358 Operate a major hazard facility only if licensed or registered | 0 |
r359 | r 359(3) Provide information required by an Authority notice | 0 |
r36 | r 36 Review noise risk controls | 0 |
r360 | r 360 Notify the Authority when Schedule 14 materials exceed 10% of threshold | 0 |
r361 | r 361 Advise the Authority of changes to notified information | 0 |
r367 | r 367 Provide and follow a safety case outline for a registered MHF | 0 |
r368 | r 368 Identify major incidents and major incident hazards | 0 |
r369-370 | rr 369 to 370 Conduct, document and keep available a safety assessment | 0 |
r37 | r 37 Provide audiometric testing for employees who need hearing protectors | 0 |
r371 | r 371 Eliminate or reduce the risk of a major incident | 0 |
r372-373 | rr 372 to 373 Establish, use and keep available a safety management system | 0 |
r374 | r 374 Review the safety management system at least every 5 years | 0 |
r375 | r 375 Prepare an emergency plan for the major hazard facility | 0 |
r376 | r 376 Keep the emergency plan on site and send copies to emergency services and councils | 0 |
r377 | r 377 Test the MHF emergency plan at intervals of no more than 3 years | 0 |
r378 | r 378 Activate the emergency plan and notify emergency services when a major incident occurs | 0 |
r379 | r 379 Review hazards, assessment, controls and emergency plan | 0 |
r38 | r 38 Arrange audiological examination after a significant hearing shift | 0 |
r380 | r 380 Develop and review a safety role for employees | 0 |
r381 | r 381 Adopt controls to limit property damage from dangerous goods | 0 |
r382 | r 382 Conduct a property protection assessment | 0 |
r383 | r 383 Review the property protection assessment | 0 |
r384 | r 384 Prepare a safety case and provide it to the Authority | 0 |
r385 | r 385 Include the required content and signed statement in the safety case | 0 |
r386 | r 386 Share hazard information when safety cases must be co-ordinated | 0 |
r387 | r 387 Review, revise and resubmit the safety case | 0 |
r388 | r 388 Consult employees and HSRs on MHF safety matters | 0 |
r389 | r 389 Provide and maintain MHF information, instruction and training | 0 |
r39 | r 39 Obtain the audiological examination report | 0 |
r390 | r 390 Record MHF training for the duration of employment | 0 |
r391 | r 391 Inform employees of the safety case and give access to key documents | 0 |
r392 | r 392 Respond to employee alerts about possible major incidents | 0 |
r393 | r 393 Inform and instruct visitors and contractors at the MHF | 0 |
r394-395 | rr 394 to 395 Provide safety information to the local community | 0 |
r396 | r 396 Consult municipal councils when preparing or revising the safety case | 0 |
r397 | r 397 Provide community information to a concerned person on request | 0 |
r398 | r 398 Employee duties at a major hazard facility | 0 |
r40 | r 40 Keep audiometric results and give HSRs de-identified aggregates | 0 |
r404 | r 404 Identify mining hazards and assess their risks | 0 |
r405 | r 405 Control mining hazard risks using the hierarchy of controls | 0 |
r406 | r 406 Review mining hazard identification, risk assessment and controls | 0 |
r408 | r 408 Control mine entry and restrict young workers | 0 |