South Africa

South Africa Major Hazard Installation Regulations 2022

19 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

19 controls 0 frameworks share controls with it South Africa verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
1-2Definitions and scope: duty holder, establishment, dangerous substances, low, medium and high hazard establishments by the Annexure A Chapter 1 and 2 quantity columns, major pipeli0
10Risk assessment: an approved inspection authority carries out a SANS 1461 risk assessment at intervals not exceeding five years or on any change, after consultation with the repres0
11Major incident prevention policy (medium and high hazard): a written policy per Annexure C on construction, change and safe operation, in place within 36 months, giving a high leve0
12Safety report (high hazard): a comprehensive site-specific report developed from the design stage, updated to start-up and maintained for the life of the establishment, demonstrati0
13Licence to operate (high hazard): apply to the chief inspector with written proof of occupancy from local government, existing establishments within 36 months, a licence that may c0
14General duties of local government: no new or expanded establishment or new development at an unacceptable separation distance under the risk assessment, no development that would 0
15Emergency plan: an emergency coordinating team appointed in writing (responsible person or deputy and a committee representative) immediately after notification; an on-site emergen0
16Reporting: the chief inspector informed within 48 hours of a major incident or any incident that activated the emergency plan, a written preliminary investigation report within sev0
17Information and training: after consulting the representative or committee, all employees trained on the scope of the Regulations, the nature of the establishment, potential major 0
18Duties of suppliers of dangerous substances: a safety data sheet supplied with the substance and basic training information on its use and handling, notification of all clients of 0
19-20Fees and the MHI Advisory Committee: a prescribed fee for each notification, renewal or revised risk assessment, with exemptions and waivers at the chief inspector's discretion, an0
21-22Approved inspection authorities: accredited or foreign inspection bodies register with the chief inspector on Form B, disputes with duty holders go to arbitration within 90 days, a0
23Closure: written notice to the chief inspector, the provincial chief director and local government at least 60 days before an installation ceases to be a major hazard installation0
24-26Offences and penalties (fines up to R5 million or 24 months' imprisonment, with a scale of maximum fines for repeat contraventions of the core regulations), repeal of the 2001 MHI 0
3Management of the establishment: a full-time responsible person designated in writing for every premises (qualified where the chief inspector requires for high hazard), deputies ap0
4Notification: Form A to the chief inspector, the provincial chief director and local government 90 days before erecting an establishment or an anticipated change, updated notificat0
5-7Registration, renewal and alteration: registration by the chief inspector on payment of the Annexure B fee with conditions and a certificate within 60 days, the latest certificate 0
8Revocation or suspension of registration: inspector directions where premises become unfit through unsafe work, unnotified change or new hazardous circumstances, revocation for non0
9Sharing of information among a designated group of establishments: basic particulars, the responsible person, the major incidents associated with the type of establishment and thei0

Tell me when South Africa Major Hazard Installation Regulations 2022 files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for South Africa Major Hazard Installation Regulations 2022, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition