NASA NPR 7123.1D Systems Engineering Processes and Requirements

52 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

52 controls 0 frameworks share controls with it United States verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
1Background, framework and guiding principles0
2.1Roles and responsibilities for systems engineering practice0
2.2Tailoring and customizing0
GEntrance and success criteria for life cycle and technical reviews0
HCompliance matrix for programmes and projects0
SE-06ETA approval of the SEMP, waivers, deviations and key technical documents0
SE-07Identify and implement a stakeholder expectations definition process0
SE-08Identify and implement a technical requirements definition process0
SE-09Identify and implement a logical decomposition process0
SE-10Identify and implement a design solution definition process0
SE-11Identify and implement a product implementation process0
SE-12Identify and implement a product integration process0
SE-13Identify and implement a product verification process0
SE-14Identify and implement a product validation process0
SE-15Identify and implement a product transition process0
SE-16Identify and implement a technical planning process0
SE-17Identify and implement a requirements management process0
SE-18Identify and implement an interface management process0
SE-19Identify and implement a technical risk management process0
SE-20Identify and implement a configuration management process0
SE-21Identify and implement a technical data management process0
SE-22Identify and implement a technical assessment process0
SE-23Identify and implement a decision analysis process0
SE-24Define the engineering activities before, during and after the contract in the SEMP0
SE-25Establish the technical inputs to the solicitation0
SE-26Determine the technical work products the contractor must deliver0
SE-27Provide the insight and oversight requirements to the contracting officer0
SE-28Participate in evaluating offeror proposals0
SE-29Perform the contracted insight and oversight activities0
SE-30Participate in the reviews that finalise Government acceptance0
SE-31Participate in product transition as defined in the SEMP0
SE-32Develop and document plans for life cycle and technical reviews0
SE-33Participate in the life cycle and technical reviews required by the governing NPR0
SE-34Participate in developing entrance and success criteria for each review0
SE-35aProvide the minimum products at the Mission Concept Review0
SE-35bProvide the minimum products at the System Requirements Review0
SE-35cProvide the minimum products at the Mission or System Definition Review0
SE-35dProvide the minimum products at the Preliminary Design Review0
SE-35eProvide the minimum product at the Critical Design Review0
SE-35fProvide the minimum products at the System Integration Review0
SE-35gProvide the minimum products at the Operational Readiness Review0
SE-35hProvide the minimum products at the Flight Readiness Review0
SE-35iProvide the minimum product at the Decommissioning Review0
SE-35jProvide the minimum product at the Disposal Readiness Review0
SE-57Monitor the technical effort through periodic technical reviews0
SE-58Define in the SEMP how the 17 processes are applied recursively across the system structure0
SE-59Keep technical and discipline plans consistent with the SEMP and integrated into the effort0
SE-60Establish technical performance measures that track current state against plan0
SE-61Report the technical performance measures to the programme or project manager at an agreed interval0
SE-62Include mass and power margins among the leading indicators0
SE-64Create and maintain review trends including closure of review action documentation0
SE-65Develop and document an approach to human systems integration0

Tell me when NASA NPR 7123.1D Systems Engineering Processes and Requirements files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for NASA NPR 7123.1D Systems Engineering Processes and Requirements, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition