1 | Background, framework and guiding principles | 0 |
2.1 | Roles and responsibilities for systems engineering practice | 0 |
2.2 | Tailoring and customizing | 0 |
G | Entrance and success criteria for life cycle and technical reviews | 0 |
H | Compliance matrix for programmes and projects | 0 |
SE-06 | ETA approval of the SEMP, waivers, deviations and key technical documents | 0 |
SE-07 | Identify and implement a stakeholder expectations definition process | 0 |
SE-08 | Identify and implement a technical requirements definition process | 0 |
SE-09 | Identify and implement a logical decomposition process | 0 |
SE-10 | Identify and implement a design solution definition process | 0 |
SE-11 | Identify and implement a product implementation process | 0 |
SE-12 | Identify and implement a product integration process | 0 |
SE-13 | Identify and implement a product verification process | 0 |
SE-14 | Identify and implement a product validation process | 0 |
SE-15 | Identify and implement a product transition process | 0 |
SE-16 | Identify and implement a technical planning process | 0 |
SE-17 | Identify and implement a requirements management process | 0 |
SE-18 | Identify and implement an interface management process | 0 |
SE-19 | Identify and implement a technical risk management process | 0 |
SE-20 | Identify and implement a configuration management process | 0 |
SE-21 | Identify and implement a technical data management process | 0 |
SE-22 | Identify and implement a technical assessment process | 0 |
SE-23 | Identify and implement a decision analysis process | 0 |
SE-24 | Define the engineering activities before, during and after the contract in the SEMP | 0 |
SE-25 | Establish the technical inputs to the solicitation | 0 |
SE-26 | Determine the technical work products the contractor must deliver | 0 |
SE-27 | Provide the insight and oversight requirements to the contracting officer | 0 |
SE-28 | Participate in evaluating offeror proposals | 0 |
SE-29 | Perform the contracted insight and oversight activities | 0 |
SE-30 | Participate in the reviews that finalise Government acceptance | 0 |
SE-31 | Participate in product transition as defined in the SEMP | 0 |
SE-32 | Develop and document plans for life cycle and technical reviews | 0 |
SE-33 | Participate in the life cycle and technical reviews required by the governing NPR | 0 |
SE-34 | Participate in developing entrance and success criteria for each review | 0 |
SE-35a | Provide the minimum products at the Mission Concept Review | 0 |
SE-35b | Provide the minimum products at the System Requirements Review | 0 |
SE-35c | Provide the minimum products at the Mission or System Definition Review | 0 |
SE-35d | Provide the minimum products at the Preliminary Design Review | 0 |
SE-35e | Provide the minimum product at the Critical Design Review | 0 |
SE-35f | Provide the minimum products at the System Integration Review | 0 |
SE-35g | Provide the minimum products at the Operational Readiness Review | 0 |
SE-35h | Provide the minimum products at the Flight Readiness Review | 0 |
SE-35i | Provide the minimum product at the Decommissioning Review | 0 |
SE-35j | Provide the minimum product at the Disposal Readiness Review | 0 |
SE-57 | Monitor the technical effort through periodic technical reviews | 0 |
SE-58 | Define in the SEMP how the 17 processes are applied recursively across the system structure | 0 |
SE-59 | Keep technical and discipline plans consistent with the SEMP and integrated into the effort | 0 |
SE-60 | Establish technical performance measures that track current state against plan | 0 |
SE-61 | Report the technical performance measures to the programme or project manager at an agreed interval | 0 |
SE-62 | Include mass and power margins among the leading indicators | 0 |
SE-64 | Create and maintain review trends including closure of review action documentation | 0 |
SE-65 | Develop and document an approach to human systems integration | 0 |