NASA NPR 7120.5F Space Flight Program and Project Management Requirements

113 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

113 controls 0 frameworks share controls with it United States verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
1.1Key policy changes in Revision F0
1.2Background and requirement categories0
1.3Overview of the management process0
1.4Acquisition alignment and supporting meetings0
1.5Structure of the document0
2.1.1.2Directive applies to full program scope0
2.1.3.1Assigning a project category0
2.1.3.2Assignment of project to a Center0
2.1.4.1Certified managers above cost threshold0
2.2Section 2.2 reviews and monitoring scheme0
2.2.1Following the program or project life cycle0
2.2.10Compliance matrix upkeep0
2.2.11Project protection plan0
2.2.2Product-based work breakdown structure0
2.2.3Documents prepared to appendix templates0
2.2.4Life-cycle reviews run per NPR 7123.10
2.2.5Conduct of board-led technical reviews0
2.2.5.1Conflict of interest in independent reviews0
2.2.5.2Convening authorities and terms of reference0
2.2.5.3Pre-review readiness assessment0
2.2.6Review documentation for maturity0
2.2.8Earned value management above $250M0
2.2.8.1In-house earned value capability process0
2.2.8.2Earned value on contracted work0
2.2.8.3Integrated baseline reviews0
2.2.8.4Earned value system surveillance0
2.3Section 2.3 oversight and approval machinery0
2.3.1Decision authority for each program and project0
2.3.1.1Notification of agency baseline commitments0
2.3.2Governing program management council0
2.3.4Center oversight through the management council0
2.3.4.1Integrated center management council0
2.3.5Briefing councils after each review0
2.4.1KDP decision recorded in signed Decision Memorandum0
2.4.1.1Decision Memorandum content and supporting data0
2.4.1.2Management Agreement terms and amendment on divergence0
2.4.1.3Formulation cost and schedule range with agreement0
2.4.1.3.aHigh and low cost and schedule values for large programs0
2.4.1.3.bInitial capability scope for continuing operations0
2.4.1.4Additional resources and unallocated future expenses0
2.4.1.5Agency baseline commitment from the KDP C memorandum0
2.4.1.6Phase E cost estimate for continuing operations0
2.4.1.7Tightly coupled program baseline at KDP I0
2.4.1.8Rebaseline criteria and review of new baseline0
2.4.2Basis of estimate in retrievable records0
2.4.3Probabilistic cost and schedule analysis scope0
2.4.3.1.aCost and schedule ranges at KDP B under $1B0
2.4.3.1.bJoint cost and schedule confidence level at KDP B0
2.4.3.2Cost-loaded schedule and JCL at KDP C0
2.4.3.3JCL refresh at CDR for large programs0
2.4.3.4JCL update at KDP D on cost overrun0
2.4.3.5JCL in the rebaseline approval0
2.4.4Mission Directorate planning and funding duties0
2.4.4.1KDP B funding at 70 percent confidence0
2.4.4.2KDP C funding at 70 percent confidence0
2.4.4.3Justifying confidence levels below 70 percent0
2.4.4.4KDP C funding floor against the agreement0
2.4.4.5Justifying funding outside the agreement0
2.4.5Program risk posture reporting for coupled programs0
3.1Governance principles and the two authorities0
3.2Agency roles and responsibilities for programs and projects0
3.3Technical Authority delegation and supporting roles0
3.3.1Apply the Technical Authority process0
3.4Documenting and escalating a Formal Dissent0
3.4.1Follow the Formal Dissent process0
3.5Handling tailoring requests and the Compliance Matrix0
3.5.1Apply the tailoring process to prescribed requirements0
3.5.4Submit change request for permanent requirement change0
3.6.1Basis for reimbursable space flight work0
3.7.1Assess and document SI unit use0
APP-DProgram Commitment Agreement template0
APP-EFormulation Authorization Document template0
APP-FProject Formulation Agreement template0
APP-GProgram Plan template and required contents0
APP-HProject Plan template and its required content0
C.1Compliance Matrix for documenting tailoring0
C.2Consultation and assistance for tailoring0
C.3Resources for developing the tailoring approach0
I-1.1Uncoupled program authorization and program plan products0
I-1.2Uncoupled program cost, schedule and risk baselines0
I-1.3Uncoupled program technical and management control plans0
I-1.4Uncoupled program assurance, security and administrative control plans0
I-2.1Tightly coupled program authorization and planning products0
I-2.2Tightly coupled program baselines, risk and shared infrastructure0
I-2.3Tightly coupled program technical and management control plans0
I-2.4Tightly coupled program assurance, security and operations plans0
I-3.1Tightly coupled cost, schedule, risk and acquisition control plans0
I-3.2Tightly coupled safety, assurance and certification plans0
I-3.3Tightly coupled security, review and configuration control plans0
I-3.4Tightly coupled operations, environment and logistics plans0
I-4.1Project headquarters and program-level products0
I-4.2Project technical definition products0
I-4.3Project verification, operations and disposal products0
I-4.4Project management, planning and control products0
I-5.1Project cost, schedule, risk and engineering control plans0
I-5.2Project safety, assurance and certification plans0
I-5.3Project security, protection, review and configuration plans0
I-5.4Project operations, integration and environmental plans0
I-6.1Single-project program headquarters products0
I-6.2Single-project program technical definition products0
I-6.3Single-project program verification, operations and disposal products0
I-6.4Single-project program management and control products0
I-7.1Single-project program cost, schedule, risk and engineering plans0
I-7.2Single-project program safety, assurance and certification plans0
I-7.3Single-project program security, protection and configuration plans0
I-7.4Single-project program operations, integration and environmental plans0
I.1Product owners and requirement or best practice labels0
P.1Purpose of the directive0
P.2Applicability and mandatory language0
P.3Authority for the directive0
P.4Applicable documents and forms0
P.5Measurement and verification of compliance0
P.6Cancellation of prior issuances0

Tell me when NASA NPR 7120.5F Space Flight Program and Project Management Requirements files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for NASA NPR 7120.5F Space Flight Program and Project Management Requirements, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.