1.1 | Key policy changes in Revision F | 0 |
1.2 | Background and requirement categories | 0 |
1.3 | Overview of the management process | 0 |
1.4 | Acquisition alignment and supporting meetings | 0 |
1.5 | Structure of the document | 0 |
2.1.1.2 | Directive applies to full program scope | 0 |
2.1.3.1 | Assigning a project category | 0 |
2.1.3.2 | Assignment of project to a Center | 0 |
2.1.4.1 | Certified managers above cost threshold | 0 |
2.2 | Section 2.2 reviews and monitoring scheme | 0 |
2.2.1 | Following the program or project life cycle | 0 |
2.2.10 | Compliance matrix upkeep | 0 |
2.2.11 | Project protection plan | 0 |
2.2.2 | Product-based work breakdown structure | 0 |
2.2.3 | Documents prepared to appendix templates | 0 |
2.2.4 | Life-cycle reviews run per NPR 7123.1 | 0 |
2.2.5 | Conduct of board-led technical reviews | 0 |
2.2.5.1 | Conflict of interest in independent reviews | 0 |
2.2.5.2 | Convening authorities and terms of reference | 0 |
2.2.5.3 | Pre-review readiness assessment | 0 |
2.2.6 | Review documentation for maturity | 0 |
2.2.8 | Earned value management above $250M | 0 |
2.2.8.1 | In-house earned value capability process | 0 |
2.2.8.2 | Earned value on contracted work | 0 |
2.2.8.3 | Integrated baseline reviews | 0 |
2.2.8.4 | Earned value system surveillance | 0 |
2.3 | Section 2.3 oversight and approval machinery | 0 |
2.3.1 | Decision authority for each program and project | 0 |
2.3.1.1 | Notification of agency baseline commitments | 0 |
2.3.2 | Governing program management council | 0 |
2.3.4 | Center oversight through the management council | 0 |
2.3.4.1 | Integrated center management council | 0 |
2.3.5 | Briefing councils after each review | 0 |
2.4.1 | KDP decision recorded in signed Decision Memorandum | 0 |
2.4.1.1 | Decision Memorandum content and supporting data | 0 |
2.4.1.2 | Management Agreement terms and amendment on divergence | 0 |
2.4.1.3 | Formulation cost and schedule range with agreement | 0 |
2.4.1.3.a | High and low cost and schedule values for large programs | 0 |
2.4.1.3.b | Initial capability scope for continuing operations | 0 |
2.4.1.4 | Additional resources and unallocated future expenses | 0 |
2.4.1.5 | Agency baseline commitment from the KDP C memorandum | 0 |
2.4.1.6 | Phase E cost estimate for continuing operations | 0 |
2.4.1.7 | Tightly coupled program baseline at KDP I | 0 |
2.4.1.8 | Rebaseline criteria and review of new baseline | 0 |
2.4.2 | Basis of estimate in retrievable records | 0 |
2.4.3 | Probabilistic cost and schedule analysis scope | 0 |
2.4.3.1.a | Cost and schedule ranges at KDP B under $1B | 0 |
2.4.3.1.b | Joint cost and schedule confidence level at KDP B | 0 |
2.4.3.2 | Cost-loaded schedule and JCL at KDP C | 0 |
2.4.3.3 | JCL refresh at CDR for large programs | 0 |
2.4.3.4 | JCL update at KDP D on cost overrun | 0 |
2.4.3.5 | JCL in the rebaseline approval | 0 |
2.4.4 | Mission Directorate planning and funding duties | 0 |
2.4.4.1 | KDP B funding at 70 percent confidence | 0 |
2.4.4.2 | KDP C funding at 70 percent confidence | 0 |
2.4.4.3 | Justifying confidence levels below 70 percent | 0 |
2.4.4.4 | KDP C funding floor against the agreement | 0 |
2.4.4.5 | Justifying funding outside the agreement | 0 |
2.4.5 | Program risk posture reporting for coupled programs | 0 |
3.1 | Governance principles and the two authorities | 0 |
3.2 | Agency roles and responsibilities for programs and projects | 0 |
3.3 | Technical Authority delegation and supporting roles | 0 |
3.3.1 | Apply the Technical Authority process | 0 |
3.4 | Documenting and escalating a Formal Dissent | 0 |
3.4.1 | Follow the Formal Dissent process | 0 |
3.5 | Handling tailoring requests and the Compliance Matrix | 0 |
3.5.1 | Apply the tailoring process to prescribed requirements | 0 |
3.5.4 | Submit change request for permanent requirement change | 0 |
3.6.1 | Basis for reimbursable space flight work | 0 |
3.7.1 | Assess and document SI unit use | 0 |
APP-D | Program Commitment Agreement template | 0 |
APP-E | Formulation Authorization Document template | 0 |
APP-F | Project Formulation Agreement template | 0 |
APP-G | Program Plan template and required contents | 0 |
APP-H | Project Plan template and its required content | 0 |
C.1 | Compliance Matrix for documenting tailoring | 0 |
C.2 | Consultation and assistance for tailoring | 0 |
C.3 | Resources for developing the tailoring approach | 0 |
I-1.1 | Uncoupled program authorization and program plan products | 0 |
I-1.2 | Uncoupled program cost, schedule and risk baselines | 0 |
I-1.3 | Uncoupled program technical and management control plans | 0 |
I-1.4 | Uncoupled program assurance, security and administrative control plans | 0 |
I-2.1 | Tightly coupled program authorization and planning products | 0 |
I-2.2 | Tightly coupled program baselines, risk and shared infrastructure | 0 |
I-2.3 | Tightly coupled program technical and management control plans | 0 |
I-2.4 | Tightly coupled program assurance, security and operations plans | 0 |
I-3.1 | Tightly coupled cost, schedule, risk and acquisition control plans | 0 |
I-3.2 | Tightly coupled safety, assurance and certification plans | 0 |
I-3.3 | Tightly coupled security, review and configuration control plans | 0 |
I-3.4 | Tightly coupled operations, environment and logistics plans | 0 |
I-4.1 | Project headquarters and program-level products | 0 |
I-4.2 | Project technical definition products | 0 |
I-4.3 | Project verification, operations and disposal products | 0 |
I-4.4 | Project management, planning and control products | 0 |
I-5.1 | Project cost, schedule, risk and engineering control plans | 0 |
I-5.2 | Project safety, assurance and certification plans | 0 |
I-5.3 | Project security, protection, review and configuration plans | 0 |
I-5.4 | Project operations, integration and environmental plans | 0 |
I-6.1 | Single-project program headquarters products | 0 |
I-6.2 | Single-project program technical definition products | 0 |
I-6.3 | Single-project program verification, operations and disposal products | 0 |
I-6.4 | Single-project program management and control products | 0 |
I-7.1 | Single-project program cost, schedule, risk and engineering plans | 0 |
I-7.2 | Single-project program safety, assurance and certification plans | 0 |
I-7.3 | Single-project program security, protection and configuration plans | 0 |
I-7.4 | Single-project program operations, integration and environmental plans | 0 |
I.1 | Product owners and requirement or best practice labels | 0 |
P.1 | Purpose of the directive | 0 |
P.2 | Applicability and mandatory language | 0 |
P.3 | Authority for the directive | 0 |
P.4 | Applicable documents and forms | 0 |
P.5 | Measurement and verification of compliance | 0 |
P.6 | Cancellation of prior issuances | 0 |