4.1.1 | Inspection undertaken impartially | 1 |
4.1.2 | Responsibility for impartiality and freedom from pressure | 1 |
4.1.3 | Ongoing identification of risks to impartiality | 2 |
4.1.4 | Demonstrating how identified risks are eliminated or minimised | 0 |
4.1.5 | Top management commitment to impartiality | 0 |
4.1.6 | Independence to the extent required: Types A, B and C | 1 |
4.2.1 | Legally enforceable confidentiality and notice of public information | 3 |
4.2.2 | Notifying the client when confidential information is released | 0 |
4.2.3 | Information from other sources treated as confidential | 0 |
5.1.1 | Legal entity or defined part of one | 2 |
5.1.2 | Identifiable within a wider legal entity | 0 |
5.1.3 | Documentation of the activities for which it is competent | 0 |
5.1.4 | Provision for liabilities | 0 |
5.1.5 | Documented contractual conditions | 0 |
5.2.1 | Structured and managed to safeguard impartiality | 1 |
5.2.2 | Organised to maintain inspection capability | 0 |
5.2.3 | Defined and documented responsibilities and reporting structure | 0 |
5.2.4 | Relationship between inspection and other activities defined | 0 |
5.2.5 | Technical manager with overall responsibility | 1 |
5.2.6 | Named deputies for technical managers | 0 |
5.2.7 | Job descriptions for every position category | 0 |
6.1.1 | Defined and documented competence requirements | 0 |
6.1.10 | Records of monitoring, training, experience and authorisation | 0 |
6.1.11 | Remuneration not influencing results | 0 |
6.1.12 | All personnel who could influence inspection act impartially | 0 |
6.1.13 | Confidentiality by all personnel including subcontractors | 1 |
6.1.2 | Sufficient competent persons employed or contracted | 3 |
6.1.3 | Qualifications, knowledge and understanding of deviations | 1 |
6.1.4 | Duties, responsibilities and authorities made clear | 0 |
6.1.5 | Documented procedures for selecting, training, authorising and monitoring | 0 |
6.1.6 | Training stages: induction, mentored period, continuing training | 2 |
6.1.7 | Training tailored to the person and to monitoring results | 0 |
6.1.8 | Monitoring by personnel familiar with the methods | 1 |
6.1.9 | On-site observation of each inspector | 1 |
6.2.1 | Suitable and adequate facilities and equipment | 1 |
6.2.10 | Traceable reference materials | 0 |
6.2.11 | Supplier selection, verification of incoming goods and storage | 0 |
6.2.12 | Assessment of stored items for deterioration | 0 |
6.2.13 | Computers and automated equipment | 1 |
6.2.14 | Defective equipment removed and effects examined | 1 |
6.2.15 | Equipment information recorded | 0 |
6.2.2 | Rules for access to and use of facilities and equipment | 0 |
6.2.3 | Continued suitability of facilities and equipment | 0 |
6.2.4 | Equipment with significant influence defined and identified | 0 |
6.2.5 | Maintenance to documented procedures | 0 |
6.2.6 | Calibration before service and to a programme | 0 |
6.2.7 | Traceability of measurements | 1 |
6.2.8 | Reference standards used only for calibration | 0 |
6.2.9 | In-service checks between recalibrations | 0 |
6.3.1 | Subcontracting only to demonstrably competent subcontractors | 1 |
6.3.2 | Client informed of intention to subcontract | 0 |
6.3.3 | Responsibility for conformity determination stays with the body | 0 |
6.3.4 | Records of subcontractor investigation and a register | 0 |
7.1.1 | Methods and procedures defined by the requirements, or developed | 1 |
7.1.2 | Documented instructions for planning, sampling and techniques; statistical knowledge | 1 |
7.1.3 | Non-standard methods appropriate and fully documented | 1 |
7.1.4 | Documents and reference data up to date and available | 0 |
7.1.5 | Contract or work order control | 1 |
7.1.6 | Verifying information supplied by others | 0 |
7.1.7 | Timely recording of observations and data | 0 |
7.1.8 | Checks on calculations and data transfers | 0 |
7.1.9 | Documented instructions for safe inspection | 0 |
7.2.1 | Unique identification of items and samples | 0 |
7.2.2 | Establishing whether the item has been prepared | 0 |
7.2.3 | Recording abnormalities and contacting the client in case of doubt | 1 |
7.2.4 | Avoiding deterioration or damage to items | 0 |
7.3.1 | Record system demonstrating fulfilment of procedures | 0 |
7.3.2 | Reports and certificates traceable to the inspector | 0 |
7.4.1 | Retrievable report or certificate for all work | 0 |
7.4.2 | Mandatory content of reports and certificates | 1 |
7.4.3 | Certificates without results only with a traceable report | 0 |
7.4.4 | Correct, accurate and clear reporting; subcontracted results identified | 0 |
7.4.5 | Corrections and amendments after issue | 0 |
7.5.1 | Documented process for complaints and appeals | 0 |
7.5.2 | Handling process available to interested parties | 0 |
7.5.3 | Confirming responsibility and dealing with the complaint | 0 |
7.5.4 | Responsibility for all decisions in the handling process | 0 |
7.5.5 | Appeals without discriminatory actions | 0 |
7.6.1 | Elements of the complaints and appeals process | 1 |
7.6.2 | Gathering and verifying information to validate | 0 |
7.6.3 | Acknowledgement, progress reports and outcome | 0 |
7.6.4 | Decision by persons not involved in the original inspection | 1 |
7.6.5 | Formal notice of the end of the process | 0 |
8.1.1 | Management system under Option A or Option B | 0 |
8.1.2 | Option A content | 1 |
8.1.3 | Option B: ISO 9001-based system | 0 |
8.2.1 | Policies and objectives established and implemented at all levels | 0 |
8.2.2 | Evidence of top management commitment | 0 |
8.2.3 | Appointed management representative | 1 |
8.2.4 | All documentation and records included or linked | 0 |
8.2.5 | Personnel access to applicable documentation | 0 |
8.3.1 | Procedures to control documents | 0 |
8.3.2 | Document control elements | 1 |
8.4.1 | Controls for records | 0 |
8.4.2 | Retention consistent with obligations and confidentiality | 0 |
8.5.1.1 | Management review procedures | 0 |
8.5.1.2 | Review at least annually or rolling within twelve months | 0 |
8.5.1.3 | Records of reviews | 0 |
8.5.2 | Management review inputs | 1 |
8.5.3 | Management review outputs | 0 |
8.6.1 | Internal audit procedures | 0 |
8.6.2 | Planned audit programme | 0 |
8.6.3 | Periodic audits covering all procedures | 0 |
8.6.4 | Audit frequency at least every twelve months | 0 |
8.6.5 | Audit conduct: competence, independence, communication, action, documentation | 1 |
8.7.1 | Procedures for identifying and managing nonconformities | 1 |
8.7.2 | Eliminating causes to prevent recurrence | 0 |
8.7.3 | Corrective actions proportionate to impact | 0 |
8.7.4 | Corrective action procedure elements | 1 |
8.8.1 | Procedures for preventive action | 0 |
8.8.2 | Preventive actions proportionate to probable impact | 0 |
8.8.3 | Preventive action procedure elements | 1 |
A.1 | Type A: third-party inspection body independence | 1 |
A.2 | Type B: in-house inspection body independence | 0 |
A.3 | Type C: safeguards for segregation of responsibilities | 0 |
B | Annex B: Optional report and certificate elements (informative) | 0 |
status | Status: second edition 2012, succeeded by the 2026 third edition | 0 |