International

ISO 29001:2020

30 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

30 controls 0 frameworks share controls with it International verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
1-3Scope, normative reference and terms0
10.2Document the nonconformity and corrective action process0
10.3Put improvements through change management and document the improvement process0
4.1Retain documented evidence of the understanding of context0
4.2Retain documented evidence of interested party needs and expectations0
4.3Advise interested parties of requirements determined not applicable0
4.4.3Define the extent of documented information required by interested parties0
5.3Define relevant roles and document their responsibilities and authorities0
6.1Run a defined risk and opportunity management process, proportionate to product conformity impact0
6.3Manage the risks of proposed changes through a documented change process0
7.1.3Document infrastructure determination, maintenance and service-related infrastructure0
7.1.5.1Document the processes and controls for monitoring and measuring resources0
7.1.5.2Document measurement traceability per equipment item and the actions on nonconforming equipment0
7.2Validate competence to task risk and document competence management practices0
7.3Make internal and external provider personnel aware of regulated and customer quality requirements0
7.5.3Document the control of documented information and the integration of external specifications0
8.1Plan operations around the customer's scope, quality plans, change management and contingency plans0
8.2.3Document the process for reviewing requirements for products and services0
8.3.3Include environmental and safety performance and risk outputs in design inputs0
8.4.2Assess external provider performance at planned intervals and document the control approach0
8.5.1Validate special processes with defined equipment, competence, methods, criteria and revalidation, and document production controls0
8.5.2Document the identification and traceability processes0
8.5.3Document the processes for customer and external provider property0
8.5.4Maintain documented risk-based preservation requirements0
8.5.6Control changes in structure, personnel, critical providers, design and the management system, and notify customers0
8.6Document the release process0
8.7Document the control of nonconforming outputs0
9.1.2Document the customer satisfaction measurement process0
9.2Set internal audit intervals from process risk and performance results0
A-CAnnexes: structure and terminology, related standards, and risk and conformity assessment0

Tell me when ISO 29001:2020 files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for ISO 29001:2020, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition