1 | Scope: equipment, protective systems, devices and components, and the exclusions | 0 |
10 | Importers and distributors that brand or modify products take on the manufacturer's obligations | 0 |
11 | Identify suppliers and customers to authorities for 10 years | 0 |
12 | Presumption of conformity from harmonised standards | 0 |
13.1a | Categories M 1 and 1: EU-type examination with production quality assurance or product verification | 0 |
13.1b | Categories M 2 and 2: type examination for engines and electrical equipment, internal control with filing for the rest | 0 |
13.1c-d | Category 3 by internal production control, with unit verification available for any group | 0 |
13.3 | Components: same procedures, written attestation of conformity, no CE marking | 0 |
14 | EU declaration of conformity: Annex X structure, kept updated, translated, a single declaration for all applicable acts | 0 |
16 | Affix the CE marking, notified body number and Ex marking visibly, legibly and indelibly before placing on the market | 0 |
21 | Notified bodies: independence, impartiality, competence, insurance and professional secrecy | 0 |
23 | Notified bodies: subcontractors and subsidiaries meet the same requirements and the body stays fully responsible | 0 |
24 | Conformity assessment bodies: apply for notification with scope and accreditation or full documentary evidence | 0 |
29 | Notified bodies: proportionate assessment, corrective action, and refusal, suspension or withdrawal of certificates | 0 |
3 | Place products on the market and into service only when they comply in their intended use, and mark non-compliant exhibits | 0 |
31 | Notified bodies: inform the notifying authority and share results with other notified bodies | 0 |
34-37 | Market surveillance, safeguard procedure and compliant products presenting a risk | 0 |
35.3 | Economic operators: take corrective action across the Union when an authority finds a risk | 0 |
38 | End formal non-compliance with marking, declarations, technical documentation and contact details | 0 |
38a | Emergency procedures under Regulation (EU) 2024/2747 (Chapter 5a): when they apply | 0 |
38b | Notified bodies during an internal market emergency: prioritise crisis-relevant applications and raise capacity | 0 |
38c | Manufacturers under an emergency authorisation: declare compliance, meet the authorisation's conditions, no CE marking | 0 |
39-45 | Committee, penalties, transitional provisions, transposition and repeal | 0 |
6.1 | Design and manufacture each product to the Annex II essential health and safety requirements | 0 |
6.2 | Draw up technical documentation, carry out the conformity assessment, then issue the declaration and affix the CE marking | 0 |
6.3 | Keep the technical documentation and the declaration or attestation for 10 years | 0 |
6.4 | Keep series production in conformity and monitor products on the market | 0 |
6.5-7 | Identify the product, apply the explosion protection marking and give the manufacturer's contact details | 0 |
6.8 | Supply instructions and safety information in a language end-users understand | 0 |
6.9-10 | Correct, withdraw or recall non-conforming products, inform authorities of risks and cooperate on request | 0 |
7 | Appoint authorised representatives by written mandate covering at least the minimum tasks | 0 |
8.1-2 | Importers: place only compliant products and verify the manufacturer's conformity steps first | 0 |
8.3-4 | Importers: add the importer's contact details and supply instructions in the end-user's language | 0 |
8.5-7 | Importers: protect compliance in storage and transport, monitor risks and act on non-conformity | 0 |
8.8-9 | Importers: keep the declaration for 10 years, ensure access to the technical file and cooperate with authorities | 0 |
9.1-2 | Distributors: act with due care and verify markings, documents and instructions before supply | 0 |
9.3-5 | Distributors: protect compliance in storage and transport, ensure corrective action and cooperate | 0 |
ANNEX-I | Classification of equipment-groups into categories | 0 |
B | EU-type examination: single application, specimens, and approval of modifications to the type | 0 |
DE | Quality assurance modules: operate, maintain and report changes to the approved quality system and allow surveillance | 0 |
EHSR-1.0.1-2 | Integrated explosion safety and analysis of operating faults and foreseeable misuse | 0 |
EHSR-1.0.3-4 | Design for special checking and maintenance conditions and for the surrounding area conditions | 0 |
EHSR-1.0.5 | Minimum marking particulars | 0 |
EHSR-1.0.6 | Instructions content: recap of marking, safe installation, use and maintenance, limits and special conditions | 0 |
EHSR-1.1 | Material selection: no ignition from materials, no harmful reactions, stable characteristics | 0 |
EHSR-1.2.1-4 | Design for a safe lifetime: state of the art, safe components, enclosed structures and dust deposit control | 0 |
EHSR-1.2.5-9 | Additional protection against external stresses, safe opening, other hazards, overload prevention and flameproof enclosures | 0 |
EHSR-1.3 | Prevent ignition sources: sparks, flames, arcs, hot surfaces, radiation, static, stray currents, friction and pressure waves | 0 |
EHSR-1.4 | Withstand external effects and aggressive substances | 0 |
EHSR-1.5 | Safety-related devices, controls and measuring functions, including software risks | 0 |
EHSR-1.6 | Integrate safety at system level: manual override, energy dispersal, power failure, connections and warning devices | 0 |
EHSR-2.0 | Group I mining equipment: supplementary requirements for categories M 1 and M 2 | 0 |
EHSR-2.1 | Group II category 1: no ignition even in rare incidents, for gas and dust atmospheres | 0 |
EHSR-2.2-3 | Group II categories 2 and 3: ignition prevention for faults normally expected, or in normal operation | 0 |
EHSR-3 | Protective systems: dimensioning, preventing propagation, power failure, pressure relief, suppression and decoupling | 0 |
FC1G | Verification modules: supervised product tests, product verification and unit verification | 0 |
TD | Technical documentation contents, including the risk analysis | 0 |