Australia (Commonwealth, with corresponding State legislation)

Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2)

91 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

91 controls 0 frameworks share controls with it Australia (Commonwealth, with corresponding State legislation) verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
A0Purpose of the guidelines and how certification works0
A1Flood and storm surge risk assessment and plan0
A10Filters or decontamination on floor drainage0
A11Decontamination of liquid effluent0
A12Screened openings in walls, ceiling and roof0
A13Preventing release of windborne pollen and seed0
A14Place for personal protective equipment0
A15Open spaces reachable for decontamination0
A16Stopping animals passing through the anteroom0
A17Surfaces in contact with GM micro-organisms0
A18Containment of aerosols0
A19Backflow: facility already meets AS/NZS 2243.30
A2Keeping out surface run-off water0
A20Backflow assessment where AS/NZS 2243.3 is not met0
A21Ability to meet the conditions of certification0
A22Floor plans with the application0
A3Enclosable and securable space0
A4Rigid, durable and impact protected boundaries0
A5Surfaces impenetrable to GMOs or decontaminable0
A6Floor impenetrable to the plants0
A7Anteroom0
A8Hand decontamination0
A9Barriers on drainage exits0
ATT1Standards referenced (Attachment 1)0
B0Status of the Part B conditions0
B1Access limited to authorised persons0
B10Work not allowed in a PC2 plant facility0
B11Notifying the Regulator when an owner fails to maintain0
B12Inspection at least every 12 months0
B13Keeping the risk management plan current0
B14Putting the risk management plan into action0
B15Signs at each access door0
B16Pest control strategy0
B17Keeping the Part A facility requirements met0
B18Before structural changes0
B19Lifting a suspension0
B2Who counts as an authorised person0
B20Keeping the Part A GM micro-organism requirements met0
B21Testing biological safety cabinets0
B22Test certificate on the cabinet0
B23Cabinet that fails its test0
B24Monthly monitoring and annual calibration of heat-based decontamination0
B25Users can see the decontamination equipment status0
B26Defective decontamination equipment0
B27Maintaining backflow prevention measures0
B28Backflow assessment where none was done before0
B29Reviewing the backflow assessment0
B3Training records on the Regulator's request0
B30Fitting backflow prevention after a review0
B31Keeping the backflow records0
B32Annual testing of testable backflow devices0
B33Faulty backflow device0
B34Decontaminants available, labelled and in date0
B4Excluding a person on the Regulator's direction0
B5Conditional admission on the Regulator's direction0
B6Telling people their admission conditions0
B7Submissions on exclusion or conditional admission0
B8Authority to admit and exclude where the holder is not the owner0
B9Entry for the Regulator0
C1Who must follow the behavioural requirements0
C10Taking off protective equipment before leaving0
C11Wearing protective equipment between facilities0
C12Decontamination methods0
C13Trained people decontaminate0
C14Decontaminate before disposal0
C15Decontaminating soil and growth media before re-use0
C16Decontaminating benches and equipment when dealings finish0
C17Decontaminating equipment, pots and media before they leave0
C18Removing and treating protective equipment0
C19Decontaminating liquid effluent and run-off0
C2Non-GMO, exempt and PC1 work in the facility0
C20Hand decontamination on leaving0
C21Written spill procedures0
C22Dealing with a spill inside0
C23Escape or loss outside the facility0
C24Decontamination to the guidelines0
C25Identifying GM plants and material0
C26Transport and storage outside the facility0
C27No storage of whole live GM plants outside0
C28Sealed storage inside the facility0
C29No dealings in the anteroom0
C3Choice of rules for PC1 dealings0
C30Aerosol-producing work in a cabinet0
C31Using and decontaminating cabinets0
C4Entry and exit through the anteroom0
C5Emergency exits0
C6Doors closed and secured0
C7Windows closed and secured0
C8Handling plants so they stay inside0
C9Protective clothing and gloves0
DEFDefinitions and acronyms0

Tell me when Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2) files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2), drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition