Appendix-intro | Appendix Jurisdictional notes | 0 |
Ch1-P1.2-P1.3 | Parts 1.2 and 1.3 Application and incorporated documents (rr 10 to 15) | 0 |
Ch1-intro | Chapter 1 Preliminary: citation, definitions and meaning of supply (rr 1 to 9) | 0 |
Ch10-intro | Chapter 10 Mines (rr 609 to 675) not included in the consolidation | 0 |
Ch11-P11.1-intro | Part 11.1 Review of decisions under the Regulations (rr 676 to 683) | 0 |
Ch11-P11.2-intro | Part 11.2 Exemptions: general, high risk work, MHF and engineered stone (rr 684 to 692, 694 to 698) | 0 |
Ch11-P11.3-intro | Part 11.3 Miscellaneous (rr 700 to 702) | 0 |
Ch11-P11.5-intro | Parts 11.4 to 11.6 Transitional provisions: engineered stone and crane licences (rr 703 to 705) | 0 |
Ch4-P4.5-accreditation | rr 115 to 123 and 128 to 141 Accreditation of assessors: grant, conditions, renewal, suspension, RTO agreements | 0 |
Ch4-P4.5-licensing | rr 86 to 93, 95, 99 to 110 and 112 High risk work licence applications, decisions, conditions, renewal, suspension and cancellation | 0 |
Ch5-P5.1-intro | Part 5.1 application to plant and structures (rr 185 and 186) | 0 |
Ch5-P5.2-intro | Part 5.2 application: registrable plant and plant designs (r 227) | 0 |
Ch5-P5.3-Div3-intro | Division 3 Plant design registration process (rr 248 to 263) | 0 |
Ch5-P5.3-Div4-intro | Division 4 Item registration and renewal process (rr 264 to 272, 274, 276 to 280) | 0 |
Ch5-P5.3-Div5-6-intro | Divisions 5 and 6 Amending, replacing and cancelling registrations (rr 281, 283 to 288D) | 0 |
Ch6-P6.1-intro | Part 6.1 Definitions: construction work, structure, high risk construction work, construction project, principal contractor (rr 289 to 293) | 0 |
Ch6-P6.4-intro | Part 6.4 application to construction projects (r 307) | 0 |
Ch6-P6.5-Div2-intro | Division 2 Issue, replacement and cancellation of general construction induction training cards (rr 319 to 325) | 0 |
Ch7-P7.1-Div8-intro | Authorisation of prohibited and restricted carcinogens (rr 383, 384, 386) | 0 |
Ch7-P7.1-intro | Part 7.1 application to hazardous chemicals (r 328) | 0 |
Ch7-P7.2-intro | Part 7.2 lead processes, regulator decisions and lead risk work (rr 392 to 394) | 0 |
Ch8-P8.10-Div3-7-intro | Divisions 3 to 7 Asbestos licensing process, amendment, renewal, suspension, cancellation and registers (rr 491 to 504, 508 to 511, 514 to 528) | 0 |
Ch8-P8.3-intro | Part 8.3 application (r 421) | 0 |
Ch8-P8.6-intro | Part 8.6 application to demolition and refurbishment (r 447) | 0 |
Ch8-P8.9-intro | Part 8.9 application to asbestos-related work (r 478) | 0 |
Ch8A-P8A.1-intro | Part 8A.1 Definitions: processing, crystalline silica substance, engineered stone, controlled processing (rr 529A and 529B) | 0 |
Ch9-P9.1-intro | Chapter 9 application and definitions (rr 530 to 534) | 0 |
Ch9-P9.2-intro | Inquiry and determination of facilities and operators (rr 537, 539 to 543, 545, 546) | 0 |
Ch9-P9.7-intro | Licensing process, amendment, renewal, transfer, suspension and cancellation (rr 577 to 586, 589 to 592, 595, 597 to 608) | 0 |
Sch1-4-intro | Schedules 1 to 4 Revocation, fees, high risk work licence classes and competency requirements | 0 |
Sch11-13-intro | Schedules 11 to 13 Placard and manifest quantities, manifest content and placard requirements | 0 |
Sch14-intro | Schedule 14 Requirements for health monitoring | 0 |
Sch15-18-intro | Schedules 15 to 18 Major hazard facility chemicals, emergency plan, SMS and safety case content | 0 |
Sch5-intro | Schedule 5 Registration of plant and plant designs | 0 |
Sch6-10-intro | Schedules 6 to 10 Chemical classification, SDS content, ingredient disclosure, labelling and prohibited chemicals | 0 |
intro | Status, currency and adoption of the model WHS Regulations | 0 |
r113-114 | rr 113 and 114 Only accredited assessors assess high risk work competency, within their accreditation | 0 |
r124-139 | rr 124 to 127 and 139 Accredited assessor duties: documents available, notify changes within 14 days, return documents | 0 |
r142 | r 142 Notify the regulator 5 days before notifiable demolition work | 0 |
r143 | r 143 Demolition work required to be licensed (jurisdictional) | 0 |
r144-146 | rr 144 to 146 Meaning of electrical equipment, installation and work | 0 |
r147 | r 147 Manage electrical risks | 0 |
r149 | r 149 Disconnect unsafe electrical equipment until repaired, tested, replaced or removed | 0 |
r150-151 | rr 150 and 151 Inspect and test plug-in equipment in hostile environments; do not use untested equipment | 0 |
r152-153 | rr 152 and 153 Application of the energised work Division | 0 |
r154-156 | rr 154 to 156 No work on energised equipment; test before work; treat parts as live; prevent re-energising | 0 |
r157-161 | rr 157 to 161 Energised electrical work only when permitted, with risk assessment, SWMS, access control and safety observer | 0 |
r16-17 | rr 16 and 17 Determine work groups so HSRs are accessible, taking all relevant matters into account | 1 |
r162 | r 162 Keep energised work risk assessments and SWMS | 0 |
r163 | r 163 Comply with AS/NZS 3012:2019 on construction and demolition sites | 0 |
r164-165 | rr 164 and 165 Use RCDs for socket outlets in hostile environments and test RCDs regularly | 0 |
r166 | r 166 Keep people, plant and things a safe distance from overhead and underground electric lines | 0 |
r167 | r 167 Purpose of the diving Part | 0 |
r168-170 | rr 168 to 170 Divers hold a current certificate of medical fitness, conditions complied with, kept 1 year | 0 |
r171-175 | rr 171 to 175 Diver and supervisor competence, and sighting and keeping evidence of it | 0 |
r176-179 | rr 176 to 179 Diving risk assessment, supervisor appointment, dive plan and instruction | 0 |
r18-20A | rr 18 to 20A HSR election procedure, removal and assistant entry notices | 0 |
r180-182 | rr 180 to 182 Keep and verify the dive safety log; keep risk assessments and dive plans | 0 |
r183-184 | rr 183 and 184 High risk diving to AS/NZS 2299.1:2015 | 0 |
r187-188 | rr 187 and 188 Designers of plant: information to the manufacturer and response to design hazards | 0 |
r189 | r 189 Designers: guarding designed to the hierarchy and to resist bypassing | 0 |
r19 | r 19 Do not unreasonably delay an HSR election | 0 |
r190-192 | rr 190 to 192 Designers: operator controls, emergency stops and warning devices | 0 |
r193-194 | rr 193 and 194 Manufacturers: manufacture, inspect and test to the design; resolve design hazards; guarding | 0 |
r195 | r 195 Manufacturers: obtain the designer's information and pass it on at supply | 0 |
r196-197 | rr 196 and 197 Importers of plant: obtain and pass on information; inspect, test and control hazards | 0 |
r198 | r 198 Suppliers of plant: obtain and give the manufacturer's information | 0 |
r199-200 | rr 199 and 200 Second-hand plant: identify faults, give written notice; scrap and spare parts marking | 0 |
r201-202 | rr 201 and 202 Installers, constructors and commissioners of plant and structures follow the safety information | 0 |
r203 | r 203 Manage plant risks under Part 3.1 | 0 |
r204 | r 204 Commissioning, decommissioning and dismantling: safe, competent people, information and inspections | 0 |
r205-207 | rr 205 to 207 Prevent unauthorised alteration; use plant as designed; leave idle plant safe | 0 |
r208-209 | rr 208 and 209 Guarding of plant at the workplace, and guarding or insulation against heat and cold | 1 |
r21 | r 21 HSR training entitlement: initial course up to 5 days and 1 day refresher each year | 0 |
r210-212 | rr 210 to 212 Operator controls, emergency stops and warning devices at the workplace | 0 |
r213 | r 213 Maintenance, inspection and testing of plant by a competent person | 1 |
r214-215 | rr 214 and 215 Powered mobile plant: manage overturning, falling objects, ejection, collision; operator protection and warnings | 0 |
r216 | r 216 Roll-over protective structures on tractors | 0 |
r218 | r 218 Industrial lift trucks: suitable attachments, safe operation, passengers only in designed seats | 0 |
r219-220 | rr 219 and 220 Plant that lifts or suspends loads or people | 0 |
r22-23 | rr 22 and 23 Have a written agreed issue resolution procedure containing the default steps, or follow the default procedure | 1 |
r221 | r 221 Tree lopping using a crane and harness | 0 |
r222 | r 222 Industrial robots and remotely or automatically energised plant | 0 |
r223 | r 223 Lasers on plant | 0 |
r224 | r 224 Pressure equipment and gas cylinders | 0 |
r225 | r 225 Scaffolds: completion confirmation, inspections at least every 30 days, repairs and access control | 0 |
r226 | r 226 Records for plant with presence-sensing safeguarding systems | 0 |
r228-230 | rr 228 to 230 Designers of registrable plant designs: design records, standards used, availability | 0 |
r231-233 | rr 231 to 233 Manufacturers, importers and suppliers: supply Schedule 5 Part 1 plant only with a registered design | 0 |
r234 | r 234 Commissioners: commission Schedule 5 Part 2 items only when registered | 0 |
r235 | r 235 Major inspection of registered mobile and tower cranes | 0 |
r236 | r 236 Lifts: lift well fall and falling object protection, safe entry, safe working load sign | 0 |
r237 | r 237 Records of registrable plant for the period of use | 0 |
r238 | r 238 Amusement devices and passenger ropeways: trained operators, daily checks and test runs logged | 0 |
r239-240 | rr 239 and 240 Storage, maintenance, inspection and testing of amusement devices and ropeways | 0 |
r24-31 | rr 24 to 31 Continuity of engagement, WHS entry permit training, form, notices and register | 0 |
r241 | r 241 Annual detailed inspection of amusement devices and ropeways | 0 |
r242 | r 242 Amusement device log book content and manuals kept with the device | 0 |
r243-247 | rr 243 to 247 Register Schedule 5 plant designs, altered designs and items of plant | 1 |
r251-254 | rr 251 to 254 Design verifiers: eligibility, independence, documented verification | 0 |
r260-262 | rr 260 to 262 Pass on the design registration number, keep it near the plant, keep the document available | 0 |
r266-277 | rr 266, 273, 275 and 277 Item registration: apply with a competent inspection, mark the number, renew with a maintenance declaration | 0 |
r282 | r 282 Notify the regulator of changes within 14 days, including alteration, relocation or loss of control | 0 |
r287-288D | rr 287, 288 and 288D Return registration documents when requested; report loss | 0 |
r294 | r 294 Commissioning client consults the designer on construction-phase design risks | 0 |
r295 | r 295 Designer's written safety report; client obtains it | 0 |
r296 | r 296 Client gives the principal contractor its hazard information | 1 |
r297 | r 297 Manage construction work risks under Part 3.1 | 0 |
r298 | r 298 Secure the construction workplace from unauthorised access | 0 |
r299 | r 299 Prepare a safe work method statement before high risk construction work | 1 |
r300 | r 300 Carry out high risk construction work in accordance with the SWMS; stop if it is not | 0 |
r301-303 | rr 301 to 303 Give the SWMS to the principal contractor, review it and keep it accessible | 1 |
r304 | r 304 Obtain and use underground essential services information before excavation | 0 |
r305 | r 305 Manage excavation risks: falls in, collapse, falling objects, airborne contaminants | 0 |
r306 | r 306 Trenches 1.5 metres or deeper: secure the area and support all sides | 0 |
r308 | r 308 Principal contractor signage | 0 |
r309 | r 309 Prepare a written WHS management plan before project work starts | 1 |
r310-311 | rr 310 and 311 Inform workers of the WHS management plan and keep it up to date | 0 |
r312 | r 312 Principal contractor obtains SWMS before high risk construction work starts | 0 |
r313 | r 313 Keep the WHS management plan accessible and available | 0 |
r314 | r 314 Arrangements for compliance with specified Part 3.2 Divisions and Part 4.4 | 1 |
r315 | r 315 Manage materials, idle plant, traffic and essential services risks | 0 |
r316-317 | rr 316 and 317 General construction induction training: provide it and check workers hold a card | 1 |
r32-33 | rr 32 and 33 Application of Part 3.1 and specific requirements | 0 |
r326-327 | rr 326 and 327 Workers keep their induction card available, return it on cancellation, and do not alter it | 0 |
r329 | r 329 Manufacturers and importers classify substances, mixtures and articles before first supply | 0 |
r330-331 | rr 330 and 331 Manufacturers and importers prepare, review and provide safety data sheets | 1 |
r332-333 | rr 332 and 333 Emergency disclosure of ingredient identities to medical practitioners and emergency service workers | 0 |
r334-335 | rr 334 and 335 Manufacturers and importers pack and label hazardous chemicals correctly | 0 |
r336 | r 336 Workers under 16 do not supply flammable gases or liquids into customers' containers or vehicles | 0 |
r337-339 | rr 337 to 339 Suppliers: correct packing, correct labelling and safety data sheets with first supply | 0 |
r34 | r 34 Identify reasonably foreseeable hazards | 1 |
r340 | r 340 Supply prohibited and restricted carcinogens only to authorised persons, with records | 0 |
r341-343 | rr 341 to 343 PCBUs keep hazardous chemicals, decanted containers and pipe work correctly labelled | 0 |
r344-345 | rr 344 and 345 PCBUs obtain current SDS and make them accessible; do not alter SDS | 1 |
r346 | r 346 Keep an up-to-date hazardous chemicals register with SDS | 1 |
r347-348 | rr 347 and 348 Manifest and regulator notification above Schedule 11 manifest quantities | 1 |
r349-350 | rr 349 and 350 Display outer warning placards and placards above placard quantities | 0 |
r35 | r 35 Eliminate risks, or minimise them, so far as is reasonably practicable | 1 |
r351 | r 351 Manage risks of using, handling, generating and storing hazardous chemicals | 1 |
r352 | r 352 Review chemical control measures on specified triggers and at least every 5 years | 1 |
r353 | r 353 Display safety signs next to chemical hazards | 0 |
r354 | r 354 Identify reaction risks and prevent contamination of food and personal products | 0 |
r355-356 | rr 355 and 356 Keep ignition sources out of hazardous areas and keep chemicals stable | 0 |
r357-358 | rr 357 and 358 Spill containment and protection of containers from damage | 0 |
r359 | r 359 Fire protection and firefighting equipment suited to the chemicals | 1 |
r36 | r 36 Apply the hierarchy of control measures | 1 |
r360-362 | rr 360 to 362 Emergency equipment, emergency plans for manifest-quantity sites, and safety equipment | 0 |
r363-364 | rr 363 and 364 Storage and handling systems used as designed; bulk containers securely founded | 0 |
r365-367 | rr 365 to 367 Decommission handling systems free of chemicals; remove underground systems; notify abandoned tanks | 0 |
r368-370 | rr 368 to 370 Provide, and inform workers about, health monitoring for Schedule 14 and other significant exposures | 1 |
r37 | r 37 Keep control measures effective: fit for purpose, suitable, correctly installed and used | 0 |
r371-373 | rr 371 to 373 Health monitoring by an experienced registered medical practitioner, paid by the PCBU, with the required information | 0 |
r374-377 | rr 374 to 377 Obtain health monitoring reports and give copies to the worker, the regulator and other PCBUs | 0 |
r378 | r 378 Keep health monitoring records confidential for at least 30 years | 1 |
r379 | r 379 Supervise workers exposed to hazardous chemicals | 0 |
r38 | r 38 Review and revise control measures, including on an HSR's request | 1 |
r380-382 | rr 380 to 382 Prohibited carcinogens, restricted carcinogens, restricted chemicals and PCBs | 0 |
r385-388 | rr 385, 387 and 388 Carcinogen authorisation holders: report changes, give exposure statements, keep records for 30 years | 0 |
r389 | r 389 Pipeline owners manage transfer risks and outside interference | 0 |
r39 | r 39 Information, training and instruction suitable for the work, risks and controls, and understandable | 1 |
r390 | r 390 Pipeline builders notify the regulator for pipelines crossing public places | 0 |
r391 | r 391 Pipeline operators manage risks, identify contents and notify public-place transfers | 0 |
r395 | r 395 Inform workers and prospective workers of lead health risks | 1 |
r396-398 | rr 396 to 398 Confine lead contamination, clean safely, and prohibit eating, drinking and smoking in lead areas | 0 |
r399-400 | rr 399 and 400 Changing, washing and laundering controls for lead | 0 |
r40 | r 40 General workplace facilities: layout, space, floors, lighting, ventilation, heat and cold, essential services | 1 |
r401 | r 401 Review lead control measures on specified triggers | 1 |
r402 | r 402 Assess each lead process to identify lead risk work, ignoring PPE | 0 |
r403-404 | rr 403 and 404 Notify the regulator of lead risk work within 7 days and of changes | 0 |
r405-407 | rr 405 to 407 Health monitoring for lead risk work: before start, at 1 month, then at blood-lead-based intervals | 0 |
r408-410 | rr 408 to 410 Lead health monitoring supervised by an experienced practitioner, paid by the PCBU, with required information | 0 |
r41 | r 41 Provide and maintain adequate, clean and accessible toilets, drinking water, washing and eating facilities | 1 |
r411-414 | rr 411 to 414 Obtain lead monitoring reports and give them to the worker, regulator and other PCBUs | 0 |
r415-417 | rr 415 to 417 Remove workers at removal blood lead levels, examine within 7 days, return only when safe | 0 |
r418 | r 418 Keep lead health monitoring records confidential for at least 30 years | 0 |
r419 | r 419 Work involving asbestos is prohibited except in the listed cases | 0 |
r42 | r 42 Provide first aid equipment, facilities and trained first aiders | 2 |
r420 | r 420 Eliminate or minimise exposure to airborne asbestos and never exceed the exposure standard | 0 |
r422-423 | rr 422 and 423 Identify or assume asbestos, with samples analysed only by accredited laboratories | 1 |
r424 | r 424 Clearly indicate the presence and location of asbestos, by label where reasonably practicable | 0 |
r425-426 | rr 425 and 426 Prepare, keep, maintain and review the asbestos register | 1 |
r427-428 | rr 427 and 428 Give access to the asbestos register and transfer it on handover | 0 |
r429-430 | rr 429 and 430 Prepare, maintain, share and review the asbestos management plan | 1 |
r43 | r 43 Prepare, maintain, test and implement an emergency plan | 1 |
r431-434 | rr 431 to 434 Manage naturally occurring asbestos under a written plan, with training | 0 |
r435-436 | rr 435 and 436 Provide asbestos health monitoring for removal and related workers | 0 |
r437-439 | rr 437 to 439 Asbestos health monitoring by an experienced practitioner, paid by the PCBU, with required information | 0 |
r44 | r 44 Provide suitable, well-fitting, maintained PPE, ensure it is used, and train in its use | 1 |
r440-443 | rr 440 to 443 Obtain asbestos monitoring reports and share with the worker, regulator and other PCBUs | 0 |
r444 | r 444 Keep asbestos health monitoring records confidential for at least 40 years | 0 |
r445 | r 445 Train workers who may do asbestos removal or asbestos-related work, and keep records | 1 |
r446 | r 446 No high-pressure water or compressed air on asbestos; control power tools and brooms | 0 |
r448-450 | rr 448 to 450 Review the register before demolition or refurbishment and exchange it with the contractor | 0 |
r45 | r 45 PPE for other persons at the workplace | 0 |
r451 | r 451 Where there is no register, inspect before demolition or refurbishment, assume if uncertain, and inform | 0 |
r452-453 | rr 452 and 453 Identify and remove asbestos before demolition, including residential premises | 0 |
r454-455 | rr 454 and 455 Emergency demolition: develop an exposure procedure and notify the regulator | 0 |
r456-457 | rr 456 and 457 Identify and remove asbestos before refurbishment, including residential premises | 0 |
r458 | r 458 Commission licensed removalists, or trained competent persons for minor non-friable work | 1 |
r459-461 | rr 459 to 461 Licensed removalists: supervisor presence, certified and site-trained workers, training records | 0 |
r46-47 | rr 46 and 47 Workers and others use PPE as instructed, do not misuse it, and report defects | 0 |
r462-463 | rr 462 and 463 Licensed removalists inform prospective workers of health risks and obtain the register | 1 |
r464-465 | rr 464 and 465 Prepare, give, keep and make available the asbestos removal control plan | 0 |
r466 | r 466 Notify the regulator at least 5 days before licensed removal (or immediately in emergencies) | 1 |
r467-468 | rr 467 and 468 Inform the person in control, occupants and neighbours before removal work | 0 |
r469-470 | rr 469 and 470 Signs and barricades; limit access to the asbestos removal area | 0 |
r471-472 | rr 471 and 472 Decontamination facilities, and asbestos waste and PPE disposal | 0 |
r473-474 | rr 473 and 474 Independent clearance inspection and clearance certificate before re-occupation | 0 |
r475-476 | rr 475 and 476 Class A work: independent air monitoring, results shared, and action levels | 0 |
r477 | r 477 Removing friable asbestos: enclosure, negative pressure, wet method, monitoring, safe dismantling | 0 |
r479-481 | rr 479 to 481 Asbestos-related work: resolve uncertainty by analysis, inform workers, separate the area | 0 |
r48 | r 48 Remote or isolated work: manage the risks and provide effective communication | 0 |
r482 | r 482 Air monitoring for asbestos-related work and warning of exceedances | 0 |
r483-484 | rr 483 and 484 Asbestos-related work: decontamination facilities, waste and PPE disposal | 0 |
r485-488 | rr 485 to 488 Hold a Class A licence for friable asbestos and ACD, and a Class B (or A) licence for over 10 square metres of non-friable | 0 |
r489-490 | rr 489 and 490 Hold an asbestos assessor licence for Class A air monitoring and clearances | 0 |
r49 | r 49 Keep airborne concentrations below the exposure standard | 0 |
r50 | r 50 Monitor airborne contaminants where uncertain or needed, keep results 30 years, make them accessible | 2 |
r505-507 | rr 505 to 507 Licence holders keep the licence available, notify changes within 14 days, and manage supervisor changes | 0 |
r51-52 | rr 51 and 52 Manage hazardous atmospheres and ignition sources | 0 |
r512-513 | rr 512, 513 and 525 Return licence documents when required and report loss | 0 |
r529 | r 529 Asbestos removal work is supervised by a named supervisor | 1 |
r529C | r 529C Process crystalline silica substances only when the processing is controlled | 0 |
r529CA | r 529CA Assess and record whether CSS processing is high risk | 1 |
r529CB-529CC | rr 529CB and 529CC Prepare a silica risk control plan for high-risk processing and follow it | 1 |
r529CD | r 529CD Provide accredited or approved crystalline silica training and keep records | 0 |
r529CE | r 529CE Air monitoring, regulator reporting of exceedances, and health monitoring for high-risk CSS processing | 0 |
r529D-529F | rr 529D to 529F Engineered stone benchtops, panels and slabs are prohibited, with narrow exceptions | 0 |
r529G-529J | rr 529G to 529J Notify the regulator before processing installed or disposed engineered stone; update, renew and keep notices | 0 |
r53 | r 53 Keep flammable and combustible substances to the lowest reasonably practicable quantity | 0 |
r533-536 | rr 533, 536 and 538 Operators notify the regulator within 3 months when Schedule 15 chemicals exceed 10% of threshold | 0 |
r535 | r 535 A major hazard facility must be licensed, and the operator holds the licence | 1 |
r54-55 | rr 54 and 55 Manage falling objects: prevent free fall, or arrest it | 0 |
r544 | r 544 Comply with conditions imposed on a determination | 0 |
r547-549 | rr 547 to 549 Re-notify increased quantities, new operators notify, and apply for a licence within 24 months | 0 |
r551-553 | rr 551 to 553 Provide a safety case outline within 3 months and alter it when required | 0 |
r554 | r 554 Identify and document all major incidents and major incident hazards, including security | 1 |
r555 | r 555 Conduct and document a comprehensive safety assessment | 1 |
r556 | r 556 Eliminate or minimise major incident risk and mitigate consequences | 0 |
r557 | r 557 Prepare, consult on, share, test and implement the MHF emergency plan | 1 |
r558 | r 558 Establish and implement a documented safety management system | 1 |
r559 | r 559 Review and revise the safety assessment, emergency plan and SMS on specified triggers | 0 |
r55A-55B | rr 55A and 55B Meaning of psychosocial hazard and psychosocial risk | 0 |
r55C-55D | rr 55C and 55D Manage psychosocial risks and implement control measures | 1 |
r56 | r 56 Exposure standard for noise | 0 |
r560-563 | rr 560 to 563 Provide the safety case within 24 months, with required content and signed statement; co-ordinate and review | 0 |
r564-565 | rr 564 and 565 Licensed facilities: keep identifying and documenting major incidents and hazards; keep the safety assessment | 0 |
r566 | r 566 Licensed facilities: eliminate or minimise major incident risk and mitigate consequences | 0 |
r567 | r 567 Licensed facilities: keep, test and implement the emergency plan and notify incidents | 0 |
r568 | r 568 Licensed facilities: implement the SMS as the primary means of ensuring safety | 0 |
r569-570 | rr 569 and 570 Licensed facilities: review the assessment, plan and SMS on triggers and at least every 5 years; revise the safety case | 0 |
r57 | r 57 Manage hearing loss risk and keep noise exposure below the standard | 0 |
r571 | r 571 Inform and instruct visitors to a licensed facility | 1 |
r572-573 | rr 572 and 573 Provide information to the local community and authority, and after a major incident | 1 |
r574-575 | rr 574 and 575 Implement a safety role for workers and consult them on MHF matters | 1 |
r576 | r 576 Workers at licensed facilities follow procedures and report potential major incidents | 0 |
r58 | r 58 Provide audiometric testing within 3 months and at least every 2 years | 0 |
r587-588 | rr 587 and 588 Keep the MHF licence available and notify changes within 14 days | 0 |
r59 | r 59 Designers, manufacturers, importers and suppliers: low-noise plant and noise information | 0 |
r593-596 | rr 593, 594, 596 and 607 Return licence documents when required, replace if lost, and apply to renew at least 6 months before expiry | 0 |
r60 | r 60 Manage hazardous manual task risks considering all contributing factors | 0 |
r61 | r 61 Designers, manufacturers, importers and suppliers: design out hazardous manual tasks | 0 |
r62-63 | rr 62 and 63 Confined spaces covered and emergency service exception | 0 |
r64 | r 64 Designers, manufacturers, importers, suppliers, installers and constructors: design out confined space entry | 0 |
r65-66 | rr 65 and 66 No entry before compliance; competent person's written risk assessment | 1 |
r67 | r 67 Issue a written confined space entry permit before directing entry | 2 |
r68 | r 68 Confined space signage at every entry | 0 |
r69 | r 69 Continuous communication and standby monitoring | 0 |
r693 | r 693 Comply with, and ensure compliance with, exemption conditions | 0 |
r699 | r 699 Prescribed serious illnesses for incident notification | 0 |
r70-73 | rr 70 to 73 Isolate connected plant and services, control the atmosphere, flammables and ignition sources | 0 |
r74-75 | rr 74 and 75 Confined space first aid and rescue procedures, access and emergency PPE | 0 |
r76-77 | rr 76 and 77 Confined space training records and retention of permits and assessments | 0 |
r78 | r 78 Manage fall risks; work on the ground or a solid construction; safe access and exit | 1 |
r79 | r 79 Where a fall risk remains: fall prevention device, then work positioning, then fall arrest | 1 |
r80 | r 80 Establish, test and train in rescue procedures when fall arrest is used | 0 |
r81-83 | rr 81 to 83 Hold a high risk work licence for each class of high risk work, with exceptions | 1 |
r84 | r 84 Ensure direct supervision of trainees doing high risk work | 0 |
r85 | r 85 See written evidence of licences, training or certification before allowing high risk work, and keep it | 0 |
r94-98 | rr 94, 96 to 98 and 111 Licence holder duties: keep the licence document available, notify changes, return and replace documents | 0 |