1.1 | 1.1 Integrate control measures early in design so risks are eliminated or minimised across the structure's life | 0 |
1.2a | 1.2 PCBUs and designers owe the primary and designer duties for structures | 0 |
1.2b | 1.2 Know who counts as a designer, including those who alter or modify a design | 0 |
1.2c | 1.2 Clients that commission construction work consult the designer and share site hazard information | 0 |
1.2d | 1.2 Principal contractors plan and manage construction work to control risk | 0 |
1.3 | 1.3 Judge what is reasonably practicable for the designer using the standards and knowledge of the time | 0 |
1.4a | 1.4 Apply the risk management process to structure design | 0 |
1.4b | 1.4 Work down the hierarchy of controls in design | 0 |
1.4c | 1.4 Select controls with care for residual risk, interaction of hazards and consultation | 0 |
2.1 | 2.1 Consider the lifecycle: construction, use, maintenance, modification, demolition and disposal | 0 |
2.2 | 2.2 Ensure designers have, or draw on, the knowledge and capability for safe design | 0 |
2.3a | 2.3 Consult workers who will use the new or refurbished workplace | 0 |
2.3b | 2.3 Consult, cooperate and coordinate between clients, designers and other duty holders | 0 |
2.4a | 2.4 Transfer information on hazards and controls to later stages of the lifecycle | 0 |
2.4b | 2.4 Include significant hazards and residual risks in the information the designer provides | 0 |
2.4c | 2.4 Give the client a written safety report for unusual designs, and pass hazard information to the principal contractor | 0 |
2.4d | 2.4 Consider a WHS file to carry design information through the structure's life | 0 |
3.0 | 3 Integrate risk management into the design phases with client, designer and constructor collaboration | 0 |
3.1a | 3.1 In pre-design, set the design and risk context, skills and roles | 0 |
3.1b | 3.1 Clients prepare a project brief with safety requirements and give all relevant site information | 0 |
3.1c | 3.1 Research hazards from laws, statistics, alerts, similar designs and workshops | 0 |
3.2a | 3.2 Identify physical and psychosocial hazards early, systematically and beyond one or two people's experience | 0 |
3.2b | 3.2 Design out hazardous manual tasks and meet other regulatory design duties | 0 |
3.2c | 3.2 Use the preliminary hazard framework: siting, high consequence hazards, systems of work, environment and incident mitigation | 0 |
3.3a | 3.3 In design development, work through options by the hierarchy, test and finalise with a safety report | 0 |
3.3b | 3.3 Apply recognised standards and the NCC, and do not assume they control workplace risk | 0 |
3.3c | 3.3 Assess design risks with fact-finding, testing assumptions, testing components and expert consultation | 0 |
3.3d | 3.3 Allocate design process steps and keep construction-stage changes from raising risk | 0 |
3.4a | 3.4 Review design controls during the design and involve those who will build and maintain | 0 |
3.4b | 3.4 Evaluate safety in design after construction and feed lessons back | 0 |
4.1 | 4.1 Design for safe construction | 0 |
4.2 | 4.2 Design to facilitate safe use, including controlling psychosocial and violence risks | 0 |
4.3 | 4.3 Design for safe maintenance, cleaning and servicing | 0 |
4.4 | 4.4 Redo the design process for modifications, with expert input | 0 |
4.5 | 4.5 Design for safe demolition and dismantling and give the information demolishers need | 0 |
appendices | Appendices A to D: glossary, roles, checklist and case studies | 0 |
approvals | Edition: November 2024, current | 0 |
scope | Scope and application of the code | 0 |
status | Legal status: an approved code is admissible evidence, not law | 0 |