1.2a | 1.2 Eliminate or minimise physical and psychosocial risks from plant (primary duty) | 0 |
1.2b | 1.2 Meet the specific duties of the person with management or control of plant (rr 203 to 213) | 0 |
1.2c | 1.2 Meet upstream duties as designer, manufacturer, importer, supplier or installer | 0 |
1.2d | 1.2 Exercise officer due diligence and make workers and others aware of their duties on plant | 0 |
1.3a | 1.3 Manage plant risk through the systematic process and hierarchy of control | 0 |
1.3b | 1.3 Pass safety information about plant from designer to end user | 0 |
1.3c | 1.3 Consult workers on plant risks and changes | 0 |
1.3d | 1.3 Consult, cooperate and coordinate with other duty holders on shared plant | 0 |
1.4 | 1.4 Provide plant information, training, instruction and supervision (r 39) | 0 |
1.5 | 1.5 Register plant designs and items that require registration before supply or use | 0 |
2.1a | 2.1 Identify plant hazards across the whole life of the plant | 0 |
2.1b | 2.1 Identify psychosocial hazards that plant creates and hazards that plant could control | 0 |
2.1c | 2.1 Use plant that is designed to lift or suspend the load, and lift within limits | 0 |
2.1d | Appendix C: Use the plant hazard checklist | 0 |
2.2 | 2.2 Assess plant risks by severity, likelihood and exposure where needed | 0 |
2.3a | 2.3 Select plant controls using the hierarchy and check they do not create new hazards | 0 |
2.3b | 2.3 Keep people, plant and things a safe distance from electric lines (r 166) | 0 |
2.4 | 2.4 Maintain and review plant control measures (rr 37 and 38) | 0 |
3.1a | 3.1 Select suitable plant before purchasing or hiring | 0 |
3.1b | 3.1 Meet supplier duties for second-hand plant and scrap (rr 198 to 200) | 0 |
3.1c | 3.1 Agree responsibilities when hiring or leasing plant | 0 |
3.2a | 3.2 Control risks from installation and commissioning (r 204) | 0 |
3.2b | 3.2 Position plant so it can be used, accessed and escaped safely | 0 |
3.3a | 3.3 Prevent unauthorised alteration and use plant only for its designed purpose (rr 205 and 206) | 0 |
3.3b | 3.3 Lift persons only in a work box and with plant specifically designed where possible (rr 219 and 220) | 0 |
3.3c | 3.3 Check high risk work licences before allowing licensed plant work (r 85) | 0 |
3.4a | 3.4 Reassess risk when the way plant is used changes | 0 |
3.4b | 3.4 Control alterations to plant and register altered designs | 0 |
3.5 | 3.5 Have a competent person inspect, test and maintain plant (r 213) | 0 |
3.6 | 3.6 Maintain, repair and clean plant under isolation and controlled restart | 0 |
3.7 | 3.7 Leave plant not in use in a safe state and recommission after storage (r 207) | 0 |
3.8a | 3.8 Control the risks of powered mobile plant (rr 214 and 215) | 0 |
3.8b | 3.8 Fit and keep operator protective devices on quad bikes | 0 |
3.9 | 3.9 Decommission, dismantle and dispose of plant safely | 0 |
4.1a | 4.1 Guard plant using the required order of barrier types (r 208) | 0 |
4.1b | 4.1 Design, maintain and refit guards so they work and cannot easily be defeated | 0 |
4.1c | 4.1 Use presence-sensing safeguarding where physical guards are not reasonably practicable | 0 |
4.2 | 4.2 Provide operational controls that are marked, reachable, protected and lockable (r 210) | 0 |
4.3 | 4.3 Fit emergency stops that are prominent, red, reachable and not defeated by circuit failure (r 211) | 0 |
4.4 | 4.4 Fit warning devices that suit the plant and its environment (rr 212 and 215) | 0 |
4.5 | 4.5 Isolate all energy sources before work on plant using lock-out | 0 |
4.6 | 4.6 Prevent roll-away of vehicles and mobile plant | 0 |
4.7 | 4.7 Place, check and remove wheel chocks safely | 0 |
5.1a | 5.1 Register the plant design before supply and verify it | 0 |
5.1b | 5.1 Register altered plant designs (rr 244 and 282) | 0 |
5.2a | 5.2 Register each registrable item of plant and mark it | 0 |
5.2b | 5.2 Renew item registration and notify changes within 14 days | 0 |
6.1a | 6.1 Keep records of registered plant for as long as it is used (r 237) | 0 |
6.1b | 6.1 Keep presence-sensing and good practice plant records | 0 |
edition | Edition, amendment history and approvals | 0 |
glossary | Appendices A, B and D: glossary, registrable plant lists and technical standards | 0 |
plant-nature | What plant is and the harm it can cause (section 1.1) | 0 |
scope | Scope and application of the code | 0 |
status | Legal status: an approved code is admissible evidence, not law | 0 |