1-INTRO | Why noise is managed: protecting hearing and preventing disabling tinnitus, keeping warning signals and instructions audible, and reducing stress; the duty holders and the risk man | 0 |
1.1-OFFICERS | Officers exercise due diligence to ensure the PCBU complies, including reasonable steps to secure appropriate resources and processes to eliminate or minimise noise risk | 0 |
1.1-PCBU | PCBU primary duty for noise: eliminate noise risk or minimise it so far as is reasonably practicable, manage risks of hearing loss, ensure no worker's exposure exceeds the exposure | 0 |
1.2-CONSULT | Consult workers directly affected by noise, including contractors, labour hire and others who work for the PCBU, with their elected health and safety representatives given access t | 0 |
1.2-COORD | Consult, cooperate and coordinate with every other duty holder sharing responsibility for the same noise matter, exchanging information on who is doing what so that risks are elimi | 0 |
1.3 | Provide information, training, instruction and supervision suited to the work, its noise risks and the controls in place, delivered understandably by a competent person, covering r | 0 |
2.1-2.2 | How noise damages hearing and how much is too much: temporary then permanent loss from hair cell destruction, acoustic trauma above 140 dB(C), tinnitus, ototoxic substances and vib | 0 |
2.3 | Treat noise as a psychosocial hazard even below hearing-damage levels: keep levels below about 50 dB(A) for work needing high concentration or effortless conversation and 70 dB(A) | 0 |
2.4 | Make sure warning signals can be heard above ambient noise: reversing alarms on mobile plant per ISO 9533 at least as loud as the engine at high idle, and other signals at least 65 | 0 |
3 | Identify noise hazards in consultation with workers and HSRs: treat raised-voice conversation at one metre as the trigger, walk through and inspect the workplace, observe work and | 0 |
4.1 | Carry out a noise assessment once hazardous noise is identified unless exposure can be brought below the standard immediately, to identify workers at risk, the sources and processe | 0 |
4.2 | Have noise assessments done by a competent person under AS/NZS 1269.1, with understanding of the assessment objectives, the physics of sound, instrument use and limits, exposure de | 0 |
4.3 | Conduct the noise assessment during a typical shift, measuring levels per task and exposure durations with workers consulted, at 10 to 20 cm from the ear with an integrating sound | 0 |
4.4 | Produce a noise assessment report containing the Appendix E content, use it to select controls, include its main findings in worker training, and make it available to managers, hea | 0 |
5.1-ADMIN | Use administrative controls to cut exposure time: schedule noisy work when few workers are present, give advance notice of noisy work, keep workers out of noisy areas they need not | 0 |
5.1-HIER | In consultation with workers and HSRs, eliminate noise risk so far as is reasonably practicable, otherwise minimise it through the hierarchy: substitute quieter plant, processes an | 0 |
5.1-MAINT | Maintain plant and noise control equipment regularly, checking for changes in noise level from worn bearings and gears, poor lubrication, blunt blades, loose or unbalanced parts an | 0 |
5.2-PLAN | Implement controls through an occupational noise management plan that assigns actions, owners and dates based on the assessment and includes confirmatory measurements of attenuatio | 0 |
5.2-REVIEW | Maintain controls so they stay fit for purpose and correctly installed and used, and review and revise them when a control fails to minimise the risk, before a change likely to cre | 0 |
5.3-AREAS | Sign-post and clearly bound hearing protector areas where people may be exposed to hazardous noise, require everyone including managers and visitors to wear protectors on entry how | 0 |
5.3-MAINT | Inspect and maintain hearing protectors regularly (undamaged ear-muff seals, headband tension, no unofficial modifications, soft clean earplugs, disposable plugs worn once), train | 0 |
5.3-REG44 | Where PPE is used, select it to minimise risk and ensure it suits the work and hazard, fits and is reasonably comfortable, and is maintained, repaired and replaced so it keeps work | 0 |
5.3-SELECT | Select and maintain hearing protectors under AS/NZS 1269.3 with worker involvement and a reasonable choice of types, using supplier attenuation data (SLC80, class, octave band valu | 0 |
5.3-USE | Use personal hearing protectors only where other more effective controls cannot eliminate or minimise the risk, as an interim measure, or as extra protection; ensure they are worn | 0 |
5.4-OTO | Monitor hearing with regular audiometric testing where workers are exposed to listed ototoxic substances above half the workplace exposure standard regardless of noise, to any otot | 0 |
5.4-SHIFT | When audiometry shows a temporary or permanent threshold shift or a worker reports tinnitus, review the controls to find more effective measures that remove reliance on hearing pro | 0 |
5.4-TEST | Provide audiometric testing for workers frequently required to use hearing protectors against noise above the exposure standard: within three months of starting such work, then at | 0 |
6.1-BLDG | Designers of buildings and structures plan noise control from the start and minimise structure-borne noise so far as is reasonably practicable, considering reverberation, layout an | 0 |
6.1-PLANT | Designers of plant ensure the design is without noise risk so far as is reasonably practicable, provide noise emission values, the operating conditions when measured, the measureme | 0 |
6.2-INSTALL | Installers ensure plant and structures are installed, constructed or commissioned without noise risk so far as is reasonably practicable, following the designer's specifications in | 0 |
6.2-MANUF | Manufacturers ensure plant and structures are manufactured without noise risk so far as is reasonably practicable, with noise emission as low as reasonably practicable where it can | 0 |
6.2-SUPPLY | Importers and suppliers ensure plant is without noise risk at supply so far as is reasonably practicable, take all reasonable steps to obtain the manufacturer's noise emission info | 0 |
6.3 | Give purchasers and users the information needed for safe use, including results of calculations, analysis and testing, the noise emission values with measurement conditions and me | 0 |
6.4-CONTROL | Control acoustic shock in headset work: high-quality headsets with acoustic shock protection, prompt repair of damaged equipment and network faults, proper fitting, use and mainten | 0 |
6.4-INCIDENT | Manage acoustic incidents: the worker removes the headset at once, moves to a break-out area where appropriate, reports the incident and symptoms and discusses continuing work; the | 0 |
B | Where workers are exposed to ototoxic substances or vibration together with noise, reduce daily noise exposure to 80 dB(A) or below, provide audiometric testing and information on | 0 |
SCOPE | What the Code is: a Safe Work Australia model code approved under s 274 of the model WHS Act, giving practical guidance on managing noise risk, admissible in proceedings as evidenc | 0 |