1.1a | 1.1 The PCBU must eliminate risks, or minimise them so far as reasonably practicable | 0 |
1.1b | 1.1 Officers exercise due diligence over how the PCBU manages risk | 0 |
1.1c | 1.1 Designers, manufacturers, importers, suppliers and installers keep their products free of risk | 0 |
1.1d | 1.1 Workers and other people at the workplace take reasonable care and follow instructions | 0 |
1.2a | 1.2 Show management commitment to health and safety | 0 |
1.2b | 1.2 Work through the four step risk management process in proportion to the business | 0 |
1.2c | 1.2 Apply good work design at the earliest planning stage | 0 |
1.2d | 1.2 Decide what is reasonably practicable by weighing the listed matters | 0 |
1.2e | 1.2 Consult workers and their representatives at each step of the process | 0 |
1.2f | 1.2 Consult, cooperate and coordinate with other duty holders on shared risks | 0 |
1.3 | 1.3 Run the risk management process whenever circumstances change | 0 |
2.0 | 2 Identify hazards across the whole of work, physical and psychological | 0 |
2.1a | 2.1 Inspect the workplace and observe how work is actually done | 0 |
2.1b | 2.1 Consult workers on hazards, near misses and unreported incidents | 0 |
2.1c | 2.1 Consult supply chains and networks about hazards | 0 |
2.1d | 2.1 Review available information and analyse records for hazards | 0 |
3.0 | 3 Assess risks to decide severity, adequacy of controls, action and urgency | 0 |
3.1a | 3.1 Assess risk when uncertainty, interacting hazards or change call for it | 0 |
3.1b | 3.1 Do the risk assessments the Regulations require and measure where exposure standards apply | 0 |
3.1c | 3.1 Know when a detailed assessment is not needed and when a past one can be reused | 0 |
3.2a | 3.2 Work out how each hazard could cause harm as a chain of events | 0 |
3.2b | 3.2 Estimate how severe the harm could be | 0 |
3.2c | 3.2 Estimate how likely harm is to occur | 0 |
4.0 | 4 Control risks: eliminate or minimise, after consulting affected workers | 0 |
4.1a | 4.1 Work down the hierarchy of control measures | 0 |
4.1b | 4.1 Eliminate the hazard first, ideally at design or planning | 0 |
4.1c | 4.1 Substitute, isolate or apply engineering controls where elimination is not practicable | 0 |
4.1d | 4.1 Use administrative controls only for the risk that remains | 0 |
4.1e | 4.1 Provide suitable PPE as the last layer and train people to use it | 0 |
4.2a | 4.2 Source control information and develop specific controls from the chain of events | 0 |
4.2b | 4.2 Choose controls that are the highest available, suitable and do not create new hazards | 0 |
4.2c | 4.2 Weigh cost properly, never as a reason to do nothing | 0 |
4.2d | 4.2 Implement controls with procedures, training, supervision and maintenance | 0 |
4.3 | 4.3 Keep controls effective over time | 0 |
5a | 5 Review controls on the triggers the Regulations set | 0 |
5b | 5 Use the review questions and set review frequency by level of risk | 0 |
6 | 6 Keep records of the risk management process | 0 |
appendices | Appendices A to D: glossary, examples, chain of events and risk register | 0 |
approvals | Edition: November 2024, current | 0 |
scope | Scope and application of the code | 0 |
status | Legal status: an approved code is admissible evidence, not law | 0 |