1.1 | 1.1 Treat excavation work as construction work and identify high risk construction work | 0 |
1.2a | 1.2 PCBU primary duty of care for excavation work (WHS Act s 19) | 0 |
1.2b | 1.2 Principal contractor duties for a construction project (WHS Regulations 293, 308 to 315) | 0 |
1.2c | 1.2 Duties of designers, manufacturers, importers, suppliers and installers (WHS Act ss 22 to 26) | 0 |
1.2d | 1.2 Officers must exercise due diligence (WHS Act s 27) | 0 |
1.2e | 1.2 Duties of workers (WHS Act ss 7, 28; WHS Regulation 46) | 0 |
1.2f | 1.2 Duties of other persons at the workplace (WHS Act s 29) | 0 |
1.3a | 1.3 Apply the systematic risk management process (WHS Regulations 34 to 38) | 0 |
1.3b | 1.3 Manage the specific excavation risks before work starts (WHS Regulation 305) | 0 |
1.3c | 1.3 Consult workers on excavation health and safety (WHS Act ss 47 to 49) | 0 |
1.3d | 1.3 Consult, cooperate and coordinate with other duty holders (WHS Act s 46) | 0 |
1.4a | 1.4 Provide suitable information, training, instruction and supervision (WHS Act s 19; WHS Regulation 39) | 0 |
1.4b | 1.4 Site-specific training, plant licences and competent supervisors (WHS Regulation 317) | 0 |
2.1 | 2.1 Identify all hazards of the excavation work | 0 |
2.2a | 2.2 Assess the risks where the risk or its control is not well known | 0 |
2.2b | 2.2 Review available information, records and incidents | 0 |
2.3a | 2.3 Work through the hierarchy of control measures | 0 |
2.3b | 2.3 Combine control measures without creating new hazards | 0 |
2.4 | 2.4 Maintain and review control measures (WHS Regulation 38) | 0 |
3 | 3 Plan excavation work before it starts, in consultation | 0 |
3.1a | 3.1 Principal contractor duties on a construction project (WHS Regulations 292, 293) | 0 |
3.1b | 3.1 Excavation contractor appointed principal contractor for site preparation | 0 |
3.2a | 3.2 Designers must design safely and give a written safety report (WHS Act s 22; WHS Regulation 295) | 0 |
3.2b | 3.2 Person commissioning construction work consults the designer and passes on hazard information | 0 |
3.3a | 3.3 Content of a SWMS for high risk construction work (WHS Regulation 299) | 0 |
3.3b | 3.3 Prepare the SWMS before high risk construction work starts and coordinate who prepares it | 0 |
3.3c | 3.3 Stop work that departs from the SWMS (WHS Regulation 300) | 0 |
3.4a | 3.4 Use appropriately licensed asbestos removalists (WHS Regulations 422, 458) | 0 |
3.4b | 3.4 Identify or assume asbestos before demolition or excavation (WHS Regulations 422, 451) | 0 |
3.4c | 3.4 Obtain and review the asbestos register (WHS Regulations 426, 448 to 450) | 0 |
3.4d | 3.4 Transport and dispose of asbestos waste lawfully | 0 |
3.5a | 3.5 Protect adjacent buildings and structures from collapse | 0 |
3.5b | 3.5 Control vibration and water effects on nearby buildings | 0 |
3.6a | 3.6 Manage risks from essential services at the workplace | 0 |
3.6b | 3.6 Control excavators and earthmoving plant near overhead powerlines | 0 |
3.6c | 3.6 SWMS for work on or near gas mains, chemical, fuel or refrigerant lines and energised electrical installations | 0 |
3.6d | 3.6 Shut off unneeded services and notify the utility | 0 |
3.6e | 3.6 Obtain current underground essential services information before work starts (WHS Regulation 304) | 0 |
3.6f | 3.6 Sources of underground services information: Before You Dig Australia, authorities and property owners | 0 |
3.6g | 3.6 Share underground services plans with those doing the work | 0 |
3.6h | 3.6 Make services information available and keep it (WHS Regulation 304) | 0 |
3.6i | 3.6 Verify service locations by potholing before digging | 0 |
3.6j | 3.6 Use underground locators with trained operators and prepare a SWMS for work involving services | 0 |
3.7 | 3.7 Secure the trench work area from unauthorised access (WHS Regulation 306) | 0 |
3.8a | 3.8 Prepare, maintain and implement an emergency plan (WHS Regulation 43) | 0 |
3.8b | 3.8 Tailor the emergency plan to the site and align it with the project plan | 0 |
3.8c | 3.8 Review and revise the emergency plan regularly | 0 |
4.1a | 4.1 Keep plant, vehicles and loads out of the zone of influence | 0 |
4.1b | 4.1 Place excavated material away from the edge and manage runoff | 0 |
4.1c | 4.1 Spoil near old services and obstructions, and the angle of repose | 0 |
4.2a | 4.2 Use plant only for its designed purpose and with its safety features (WHS Regulation 206) | 0 |
4.2b | 4.2 Select, operate and maintain plant and equipment for excavation | 0 |
4.2c | 4.2 Control laser hazards on plant and prohibit class 3B and 4 lasers | 0 |
4.3a | 4.3 Select powered mobile plant for the task and use competent or licensed operators | 0 |
4.3b | 4.3 Implement traffic management and a SWMS where powered mobile plant is used | 0 |
4.3c | 4.3 Run earthmoving machinery and haul roads safely near excavations | 0 |
4.3d | 4.3 Manage blind spots with two-way communication between operators and ground workers (WHS Regulation 215) | 0 |
4.3e | 4.3 Prevent collisions and fit warning devices on powered mobile plant (WHS Regulation 215) | 0 |
4.3f | 4.3 Fit and use operator protective devices, including ROPS and FOPS | 0 |
4.3g | 4.3 Keep powered mobile plant back from the excavation edge | 0 |
4.3h | 4.3 Inspect, maintain and test powered mobile plant and keep logbooks | 0 |
4.4a | 4.4 Manage the risk of falls into excavations (WHS Regulation 78) | 0 |
4.4b | 4.4 Fall control measures for excavations, including fall prevention devices | 0 |
4.4c | 4.4 Prepare a SWMS where a person could fall more than 2 metres | 0 |
4.5a | 4.5 Plan the use of explosives: SWMS, competent advice and applicable laws | 0 |
4.5b | 4.5 Licensed shotfirers, blast management plans and notice to the regulator | 0 |
4.6a | 4.6 Control gas and fume build-up and keep combustion engines out of occupied trenches | 0 |
4.6b | 4.6 Design ventilation for excavations and tunnels | 0 |
4.6c | 4.6 Monitor airborne contaminants (WHS Regulation 50) | 0 |
4.6d | 4.6 Other atmospheric controls: pre-start checks, personal monitors, surface observer and rescue readiness | 0 |
4.7 | 4.7 Manage hazardous manual tasks in manual excavation (WHS Regulation 60) | 0 |
5.1a | 5.1 Secure trenches at least 1.5 metres deep from unauthorised entry (WHS Regulation 306) | 0 |
5.1b | 5.1 Support all sides of trenches at least 1.5 metres deep by shoring, benching or battering (WHS Regulation 306) | 0 |
5.1c | 5.1 Support trenches of any depth where there is a risk of engulfment | 0 |
5.1d | 5.1 Obtain geotechnical advice on trench stability | 0 |
5.1e | 5.1 Written geotechnical engineer advice where trench sides are safe from collapse | 0 |
5.1f | 5.1 Prepare trench areas and trim from outside the trench | 0 |
5.2a | 5.2 Base tunnel design on an adequate engineering investigation | 0 |
5.2b | 5.2 Tunnel design content and the designer's safety report (WHS Regulation 295) | 0 |
5.2c | 5.2 Control tunnelling hazards and support all tunnel excavation | 0 |
5.3a | 5.3 Control access to shafts and get engineering advice on shaft design | 0 |
5.3b | 5.3 Control the hazards of shaft construction | 0 |
6 | 6 Plan to prevent ground collapse and never enter an unsupported trench deeper than 1.5 m | 0 |
6.1a | 6.1 Assess ground conditions and factors that weaken soil | 0 |
6.1b | 6.1 Choose among the three types of ground collapse control | 0 |
6.2a | 6.2 Keep benched or battered excavations stable and act on changing conditions | 0 |
6.2b | 6.2 Form benches and batters correctly | 0 |
6.2c | 6.2 Design benches and batters by a competent person and limit slopes to 45 degrees unless certified | 0 |
6.3a | 6.3 Use shoring designed by a competent person where benching or battering will not work | 0 |
6.3b | 6.3 Install shoring progressively and never work ahead of it | 0 |
6.3c | 6.3 Design, inspect and maintain hydraulic shoring systems | 0 |
6.3d | 6.3 Steel sheet piling for major or unstable excavations | 0 |
6.3e | 6.3 Steel trench sheeting: manual handling, laceration and noise controls | 0 |
6.3f | 6.3 Timber soldier sets only in stable ground and to the dimensions shown | 0 |
6.3g | 6.3 Closed sheeting and side lacing: rules for workers | 0 |
6.3h | 6.3 Design ground anchors competently and control soil removal above them | 0 |
6.4 | 6.4 Remove shoring safely, in reverse order, at backfill stage | 0 |
6.5a | 6.5 Use trench shields and boxes designed for the depth and ground | 0 |
6.5b | 6.5 Install, load, maintain, inspect and modify shields and boxes correctly | 0 |
6.6 | 6.6 Chemical stabilisation of excavation faces | 0 |
6.7 | 6.7 Inspect excavations and ground support frequently | 0 |
App-A | Appendix A: Glossary | 0 |
App-B | Appendix B: References and other information sources | 0 |
App-amend | Amendments record | 0 |
S1-intro | 1 Introduction: why excavation collapse is so dangerous | 0 |
S2-intro | 2 The risk management process for excavation work | 0 |
S4-table | 4 Controlling risks in excavation work: common hazards and example controls (Table 2) | 0 |
S5-intro | 5 Excavation methods | 0 |
X-foreword | Foreword: what an approved code of practice is and its legal weight | 0 |
X-scope | Scope and application of the Code | 0 |
X-status | Status of the model Code of Practice: Excavation work | 0 |