1.5 | 1.5 Every construction project has one principal contractor, properly authorised (r 293) | 1 |
1.6 | 1.6 Multiple and shared duties: each duty holder complies, no contracting out | 1 |
1.7a | 1.7 Manage construction risks, physical and psychosocial, through the hierarchy of control (rr 297, 32 to 38) | 1 |
1.7b | 1.7 Consult workers at every step of risk management (ss 47, 48) | 1 |
1.7c | 1.7 Consult, cooperate and coordinate with other duty holders on site (s 46) | 1 |
2.1a | 2.1 Designers give the commissioning PCBU a written safety report on design-specific construction hazards (r 295) | 0 |
2.1b | 2.1 Persons who commission construction work consult the designer and pass on hazard information (rr 294, 296) | 1 |
2.1c | 2.1 Principal contractor site signage (r 308) | 0 |
2.1d | 2.1 Secure the construction workplace from unauthorised access (r 298) | 0 |
2.1e | 2.1 Obtain and provide underground essential services information before excavation (r 304) | 1 |
2.1f | 2.1 Manage excavation risks and support trenches of 1.5 metres or more (rr 305, 306) | 0 |
2.1g | 2.1 Officers exercise due diligence over construction WHS (s 27) | 1 |
2.2 | 2.2 Workers' duties, including keeping the white card available for inspection | 1 |
2.3 | 2.3 Other persons at the site: reasonable care and compliance with instructions | 0 |
3.1 | 3.1 Identify physical and psychosocial construction hazards | 1 |
3.2 | 3.2 Assess risks where it helps decide controls | 1 |
3.3a | 3.3 Eliminate construction risks, then minimise by substitution, isolation and engineering | 1 |
3.3b | 3.3 Administrative controls and PPE only after higher controls, or to add protection | 1 |
3.3c | 3.3 Combine controls and check the combination introduces no new risk | 1 |
3.4 | 3.4 Maintain and review controls, and revise the SWMS and WHS management plan with them (rr 37, 38) | 1 |
4.1 | 4.1 Prepare a SWMS before high risk construction work starts, and coordinate who prepares it (r 299) | 1 |
4.2a | 4.2 SWMS content: specific controls, accessible, workplace specific, generic versions reviewed | 1 |
4.2b | 4.2 Consult workers and HSRs when preparing and reviewing a SWMS | 1 |
4.2c | 4.2 Construction projects: SWMS reflects the WHS management plan and reaches the principal contractor first (rr 301, 312) | 0 |
4.3a | 4.3 Ensure work follows the SWMS; stop work when it does not (r 300) | 1 |
4.3b | 4.3 Make the SWMS readily accessible and instruct workers on it | 1 |
4.3c | 4.3 Keep the SWMS until the work is complete, or 2 years after a notifiable incident (r 303) | 1 |
4.4 | 4.4 Review and revise the SWMS with workers when controls change (r 302) | 1 |
5.2 | 5.1 and 5.2 Prepare a written WHS management plan before the project starts, with the required content (r 309) | 1 |
5.3 | 5.3 Generic WHS management plans reviewed for each project | 1 |
5.4 | 5.4 Make everyone doing the work aware of the plan and their right to inspect it (r 310) | 1 |
5.5 | 5.5 Review the plan to keep it current and tell people of revisions (r 311) | 1 |
5.6 | 5.6 Keep the plan until project completion, or 2 years after a notifiable incident (r 313) | 1 |
6 | 6 Provide information, training, instruction and supervision for construction work (r 39) | 1 |
6.1a | 6.1 General construction induction training before construction work (rr 316, 317) | 1 |
6.1b | 6.1 Ensure each construction worker holds a white card or certification (rr 317, 319) | 1 |
6.2 | 6.2 Workplace specific induction training | 1 |
6.3 | 6.3 Task-specific training developed and kept current | 0 |
6.4 | 6.4 Supervision by trained and authorised supervisors | 1 |
7a | 7 Principal contractor arranges compliance with the general workplace duties (r 314) | 0 |
7b | 7 Principal contractor manages materials, stored plant, traffic and essential services risks (r 315) | 1 |
D | Appendix D: Designers' duties for structures (WHS Act s 22 and r 295) | 0 |
K-env | Appendix J and K: Work environment, entry and exit, work areas, floors, lighting and heat (r 40) | 0 |
K-ep | Appendix J and K: Prepare, maintain, test and implement an emergency plan (r 43) | 1 |
K-fa | Appendix J and K: First aid equipment, facilities and trained first aiders (r 42) | 1 |
K-fac | Appendix J and K: Provide and maintain adequate, accessible facilities (r 41) | 0 |
K-fo | Appendix J and K: Manage falling object risks: prevent free fall, otherwise arrest it (rr 54, 55) | 0 |
K-ppe | Appendix J and K: Provide, select and use personal protective equipment (rr 44 to 47) | 0 |
K-ri | Appendix J: Remote or isolated work (r 48) | 0 |
approvals | Edition, amendments and jurisdictional approvals | 0 |
appx-templates | Appendices E, F, H and I: SWMS and WHS management plan templates and samples | 0 |
defs-1.1-1.5 | 1.1 to 1.5 What is construction work, a structure, high risk construction work and a construction project | 0 |
scope | Scope, application and housing construction guidance | 0 |
status | Legal status: an approved code is admissible evidence, not law | 0 |