1.1-1.4 | 1.1 to 1.4 Scope, application, normative references and definitions | 0 |
10 | 10.1 to 10.3 Supervision of electrical work and of energized work | 0 |
11 | 11 Personal protective equipment selection and requirements | 0 |
12.1-12.2 | 12.1 and 12.2 Medical attention and preservation of the incident scene | 0 |
12.3 | 12.3 Reporting electrical incidents and shocks | 0 |
2.1-2.2 | 2.1 and 2.2 Risk management before work: competent determination, planning and the decision not to proceed | 0 |
2.3.1-2.3.2 | 2.3.1 and 2.3.2 Identifying hazards and electrical hazards before work | 0 |
2.3.3 | 2.3.3 Identifying sources of electric shock | 0 |
2.3.4 | 2.3.4 Arc blast and arc flash risk | 0 |
2.3.5 | 2.3.5 Hazardous areas: no live work and control of ignition sources | 0 |
2.3.6 | 2.3.6 Other risk factors to identify before work | 0 |
2.3.7 | 2.3.7 Work zone: 3 m near-zone and 500 mm work-on zone | 0 |
2.4 | 2.4 Assess and prioritize risk at the work site | 0 |
2.5 | 2.5 Applying risk controls using the hierarchy of control | 0 |
2.6-2.7 | 2.6 and 2.7 Monitoring and review, and means of reducing risk | 0 |
2.8 | 2.8 Work permit systems | 0 |
3.1.1-3.1.2 | 3.1.1 and 3.1.2 Isolation principles and positive identification | 0 |
3.1.3 | 3.1.3 Isolating the electrical equipment from all supplies | 0 |
3.1.4 | 3.1.4 Securing isolation: locks, padlocks and tags | 0 |
3.1.5 | 3.1.5 Proving de-energization | 0 |
3.1.6-3.1.8 | 3.1.6 to 3.1.8 Temporary bonding, the safe work area and work on de-energized equipment | 0 |
3.2 | 3.2 Fault-finding and testing | 0 |
3.3 | 3.3 Testing plug-in electrical equipment | 0 |
4.1-4.3-info | 4.1, 4.3.8, 4.3.9 and 4.3.12 Specific situation factors: high voltage producing equipment, induced voltage (EMF) and lightning | 0 |
4.2 | 4.2 Safety observer duties and competence | 0 |
4.3.1 | 4.3.1 Work on or near exposed energized conductors and live conductive parts | 0 |
4.3.10-4.3.11 | 4.3.10 and 4.3.11 Material containing asbestos and equipment containing PCBs | 0 |
4.3.13-4.3.14 | 4.3.13 and 4.3.14 Cutting cables or wiring enclosures and removing out-of-service equipment | 0 |
4.3.15 | 4.3.15 Leaving work unfinished | 0 |
4.3.2 | 4.3.2 Capacitors | 0 |
4.3.3-4.3.6 | 4.3.3 to 4.3.6 Hazardous areas, trafficable areas, areas of reduced mobility and illumination | 0 |
4.3.7 | 4.3.7 Batteries and d.c. supplies | 0 |
5.1-5.2 | 5.1 and 5.2 Elevated work, overhead conductors and climbing poles or structures | 0 |
5.3-5.4 | 5.3 and 5.4 Conductive poles and structures, and erecting equipment near live conductors | 0 |
6.1-6.2 | 6.1 and 6.2 Working below ground: safe system of work and site assessment | 0 |
6.3 | 6.3 Excavating at or near cables and services | 0 |
6.4-6.5 | 6.4 and 6.5 Identifying the cable before work | 0 |
6.6-6.7 | 6.6 and 6.7 Other excavation risks and cutting underground cables | 0 |
7.1 | 7.1 Initial energization of an electrical installation or equipment | 0 |
7.2-7.3 | 7.2 and 7.3 Re-energization and extra-low voltage testing | 0 |
8.1-8.2 | 8.1 and 8.2 Safety equipment and insulated tools | 0 |
8.3 | 8.3 Portable electric tools: RCD or isolating transformer protection | 0 |
8.4-8.5 | 8.4 and 8.5 Ladders and insulating barriers, covers and mats | 0 |
9 | 9.1 to 9.3 Test equipment selection, category rating and checks | 0 |
APP | Informative Appendices A to F | 0 |
intro | Status, edition and legal effect of AS/NZS 4836:2023 | 0 |