24 controls
0 frameworks share controls with it
Australia and New Zealand
verified against its source document
Every control below is one this framework asks for. The right hand column counts how
many other frameworks in our corpus carry the same control, which is the difference between
doing this work once and doing it again for the next standard.
There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.
What you already have
Frameworks whose controls overlap this one, most first. If you run any of them, the
count is roughly what you have already evidenced.
No measured overlap with another framework in the corpus.
Every control
| Code | Control | Also in |
1.1 | 1.1 Scope | 0 |
1.2 | 1.2 General: regular inspection and testing without dismantling | 0 |
1.2.1 | 1.2.1 New equipment entering service | 0 |
1.2.2 | 1.2.2 In-service equipment | 0 |
1.2.3 | 1.2.3 Fixed or stationary equipment connected by a flexible cord | 0 |
1.2.4.1 | 1.2.4.1 Hire equipment at the commencement of hire | 0 |
1.2.4.2 | 1.2.4.2 Hire equipment during hire | 0 |
1.3-1.4 | 1.3 Interpretation and 1.4 Definitions | 0 |
2.1 | 2.1 General: visual inspection, physical checks and tests | 0 |
2.2 | 2.2 Frequency of inspection and tests | 0 |
2.3 | 2.3 Personnel: competent person | 0 |
2.4.1 | 2.4.1 Content of in-service inspection and testing | 0 |
2.4.2 | 2.4.2 Visual and physical inspection | 0 |
2.4.3-earth | 2.4 Testing: protective earth continuity (Appendix D) | 0 |
2.4.3-insulation | 2.4 Testing: insulation resistance or leakage current (Appendix E, Tables 2.1 and 2.2) | 0 |
2.4.3-polarity | 2.4 Testing: polarity of rewireable plugs and extension sockets (Appendix C) | 0 |
2.4.3-rcd | 2.4 Testing: operating time of RCDs (Appendix H, Table 2.3) | 0 |
2.4.3-special | 2.4 Testing: arc welders, portable inverters and encapsulated Class I equipment | 0 |
2.4.3-transformers | 2.4 Testing: portable isolating transformers and power supplies (Appendices F and G) | 0 |
2.5.1 | 2.5 Action on non-compliant equipment | 0 |
2.5.2 | 2.5 Tagging of compliant equipment, and new-to-service tags | 0 |
2.6 | 2.6 Documentation and record retention | 0 |
APP | Appendices A to K | 0 |
intro | Status of AS/NZS 3760:2022 | 0 |
Tell me when AS/NZS 3760:2022 In-Service Safety Inspection and Testing of Electrical Equipment and RCDs files something new
One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.
What this page is
A control-level reference for AS/NZS 3760:2022 In-Service Safety Inspection and Testing of Electrical Equipment and RCDs, drawn from our framework corpus. Control codes and
titles are references to the standard, not reproductions of it. The overlap counts and the
auditor artefacts are our own work and are the part you will not find elsewhere.