Australia

AS 7472:2018 Railway Operations

23 controls. 0 other frameworks in our corpus share controls with it. Here is all of it, and how much of it you are already doing.

Page built . This page is derived from the framework corpus, which changes when the corpus is extended rather than daily.

23 controls 0 frameworks share controls with it Australia verified against its source document

Every control below is one this framework asks for. The right hand column counts how many other frameworks in our corpus carry the same control, which is the difference between doing this work once and doing it again for the next standard.

There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.

What you already have

Frameworks whose controls overlap this one, most first. If you run any of them, the count is roughly what you have already evidenced.

No measured overlap with another framework in the corpus.

Every control

CodeControlAlso in
1.1-1.2Purpose and scope0
1.3Compliance: requirements and recommendations0
1.4-1.5Referenced documents and the definition of change0
2aTreat anything that can alter risk as a change and take a systemic view0
2bScale the process to the risk of the change0
3.1aResources, roles and an accountable change leader0
3.1bInform and train rail safety workers affected by the change0
3.1cCheck accreditation and notify or apply to the regulator0
3.1dThe six actions of the management of change process0
3.1eDocument each action and keep the safety management system current0
3.1fConsult and communicate with everyone the change affects0
3.1gApply standards and make decisions transparently0
3.2Action 1: describe the change and its context0
3.3aAction 2: assess the risks and document the controls0
3.3bFactors the risk assessment should cover0
3.3cConsult on the risks and their controls0
3.3dEvaluate impact, escalate high consequences and record removed controls0
3.4aAction 3: plan the change in detail0
3.4bArrange independent safety validation for significant changes0
3.5Action 4: document the change and obtain approval0
3.6Action 5: implement against the approved plan and re-assess when things move0
3.7Action 6: monitor and review the change after implementation0
AHazards addressed by this standard0

Tell me when AS 7472:2018 Railway Operations files something new

One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.

What this page is

A control-level reference for AS 7472:2018 Railway Operations, drawn from our framework corpus. Control codes and titles are references to the standard, not reproductions of it. The overlap counts and the auditor artefacts are our own work and are the part you will not find elsewhere.

Measure this against what you already run · All frameworks · Today's edition