23 controls
0 frameworks share controls with it
Australia
verified against its source document
Every control below is one this framework asks for. The right hand column counts how
many other frameworks in our corpus carry the same control, which is the difference between
doing this work once and doing it again for the next standard.
There is no implementation kit for this framework yet. The control list and the overlap above are free and complete.
What you already have
Frameworks whose controls overlap this one, most first. If you run any of them, the
count is roughly what you have already evidenced.
No measured overlap with another framework in the corpus.
Every control
| Code | Control | Also in |
1.1-1.2 | Purpose and scope | 0 |
1.3 | Compliance: requirements and recommendations | 0 |
1.4-1.5 | Referenced documents and the definition of change | 0 |
2a | Treat anything that can alter risk as a change and take a systemic view | 0 |
2b | Scale the process to the risk of the change | 0 |
3.1a | Resources, roles and an accountable change leader | 0 |
3.1b | Inform and train rail safety workers affected by the change | 0 |
3.1c | Check accreditation and notify or apply to the regulator | 0 |
3.1d | The six actions of the management of change process | 0 |
3.1e | Document each action and keep the safety management system current | 0 |
3.1f | Consult and communicate with everyone the change affects | 0 |
3.1g | Apply standards and make decisions transparently | 0 |
3.2 | Action 1: describe the change and its context | 0 |
3.3a | Action 2: assess the risks and document the controls | 0 |
3.3b | Factors the risk assessment should cover | 0 |
3.3c | Consult on the risks and their controls | 0 |
3.3d | Evaluate impact, escalate high consequences and record removed controls | 0 |
3.4a | Action 3: plan the change in detail | 0 |
3.4b | Arrange independent safety validation for significant changes | 0 |
3.5 | Action 4: document the change and obtain approval | 0 |
3.6 | Action 5: implement against the approved plan and re-assess when things move | 0 |
3.7 | Action 6: monitor and review the change after implementation | 0 |
A | Hazards addressed by this standard | 0 |
Tell me when AS 7472:2018 Railway Operations files something new
One email when a public company newly discloses something this framework governs, naming the company and what our corpus says it puts in scope. Nothing else, and one click to stop.
What this page is
A control-level reference for AS 7472:2018 Railway Operations, drawn from our framework corpus. Control codes and
titles are references to the standard, not reproductions of it. The overlap counts and the
auditor artefacts are our own work and are the part you will not find elsewhere.