1 | Objective: a first set of statements under Australian Accounting Standards that is transparent, comparable, a sound starting point and worth its cost | 0 |
10-11 | In the opening statement of financial position recognise, derecognise, reclassify and measure every item as the Standards require, and take the resulting adjustments straight to re | 0 |
12-13 | Two categories of departure from full retrospective application: prohibited areas and elective exemptions | 0 |
14-17 | Keep estimates at the transition date (and at the end of each comparative period) consistent with the previous GAAP estimates for that date unless they were objectively wrong, and | 0 |
18-19,C1,D1,E | Elective exemptions: choose any of the Appendix C, D and E exemptions, document each election and never extend an exemption by analogy to other items | 0 |
2-5,4A-4B | Decide whether the entity is a first-time adopter and apply the Standard to its first annual statements under Australian Accounting Standards and to the interim reports inside that | 0 |
20-22 | No relief from presentation and disclosure rules: present at least three statements of financial position and two of each other statement with comparatives, and label and explain a | 0 |
23-23B,27-28 | Explain how the transition affected financial position, performance and cash flows; a returning adopter explains why it stopped and why it resumed; AASB 108 change-in-policy rules | 0 |
24-26,27A | Reconcile previous GAAP equity to equity under the Standards at the transition date and at the latest previous GAAP year end, reconcile total comprehensive income for the latest pr | 0 |
29-29A | Disclose the fair value, previous classification and previous carrying amount of financial assets and liabilities designated at fair value through profit or loss at the transition | 0 |
30-31C | Deemed cost disclosures: aggregate fair values and the adjustment to previous GAAP amounts for each line item measured at deemed cost, the deemed cost of investments in separate st | 0 |
32-33 | Interim reports in the first period: reconcile equity and total comprehensive income for the comparable prior interim period and for the latest previous GAAP year end, explain the | 0 |
34-Aus40.2 | Effective date, amendment history, commencement and withdrawal of the 2009 Standard | 0 |
6 | Prepare and present an opening statement of financial position at the date of transition as the starting point for accounting under the Standards | 0 |
7-9 | Use one set of accounting policies, compliant with every Standard in force at the end of the first reporting period, across the opening position and all periods presented; earlier | 0 |
AppA | Appendix A defined terms | 0 |
Aus12.1 | Tier 2 entities that applied AASB 1060 early may use the AASB 1053 Appendix E relief from restating comparatives, reading the transition date as the start of the first reporting pe | 0 |
Aus3.2 | Not-for-profit public sector entity with information deficiencies: treated as a first-time adopter if it explains the gaps, its plan to close them and the Standards not met, and st | 0 |
AusD7.1,D8A-D8B | Sector reliefs on deemed cost: a not-for-profit lessee may carry below-market leases' right-of-use assets at fair value or a previous valuation; oil and gas assets in development o | 0 |
AusF1 | Tier 2 entities applying Simplified Disclosures do not apply the public sector deficiency paragraph or the presentation and disclosure paragraphs 20 to 33, and prepare but need not | 0 |
B10-B12 | Government loans: classify them under AASB 132 at the transition date and apply AASB 9 and AASB 120 prospectively, so the benefit of a below-market rate before transition is not re | 0 |
B13 | Insurance contracts: apply the AASB 17 transition provisions in paragraphs C1 to C24 and C28 to contracts within its scope | 0 |
B14 | Deferred tax on leases and decommissioning: despite the AASB 112 initial recognition exemption, recognise deferred tax at the transition date for right-of-use assets, lease liabili | 0 |
B2-B3 | Derecognition of financial assets and liabilities: apply the AASB 9 rules prospectively from the transition date, with an option to apply them from an earlier chosen date if the ne | 0 |
B4-B6 | Hedge accounting at transition: carry derivatives at fair value, remove deferred hedging gains and losses, reflect only relationships that qualify under AASB 9, and apply hedge acc | 0 |
B7 | Non-controlling interests: apply the AASB 10 rules on attributing comprehensive income, ownership changes without loss of control, and loss of control prospectively from the transi | 0 |
B8-B8C | Classify financial assets on the facts at the transition date, with impracticability reliefs for the modified time value test, insignificant prepayment features and the effective i | 0 |
B8D-B8G | Apply the AASB 9 impairment rules retrospectively using information available without undue cost or effort at the transition date; where the initial credit risk cannot be reconstru | 0 |
B9 | Assess whether an embedded derivative must be separated on the conditions at the later of contract inception and the last reassessment date | 0 |
C1-C3 | Past business combinations: keep them unrestated or, if any is restated to AASB 3, restate every later one and apply AASB 10 from the same date; AASB 121 need not be applied retros | 0 |
C4-C5 | Consequences of not restating a past combination: keep its classification, recognise all qualifying assets and liabilities at previous GAAP amounts as deemed cost, exclude non-qual | 0 |
D12-D13A | Cumulative translation differences: may be reset to zero at the transition date, so that later disposal gains exclude pre-transition differences; a subsidiary using the parent's am | 0 |
D14-D15A | Investments in subsidiaries, joint ventures and associates in separate statements: measure each at cost, at fair value at the transition date as deemed cost, or at the previous GAA | 0 |
D16-D17 | Group timing differences: a subsidiary adopting later than its parent may use the parent's consolidated carrying amounts or its own AASB 1 figures; a parent adopting later than a s | 0 |
D18 | Compound financial instruments: need not separate the liability and equity components where the liability component is no longer outstanding at the transition date | 0 |
D19-D19C | Designate financial instruments at the transition date: any financial liability or financial asset meeting the AASB 9 criteria at fair value through profit or loss, equity instrume | 0 |
D2-D3 | Share-based payment: AASB 2 is encouraged but not required for equity instruments granted on or before 7 November 2002 or vested before the later of the transition date and 1 Janua | 0 |
D20 | Fair value at initial recognition: the day-one gain deferral rule may be applied prospectively to transactions on or after the transition date | 0 |
D21-D21A | Decommissioning liabilities in the cost of property, plant and equipment: instead of applying Interpretation 1 to pre-transition changes, measure the liability at the transition da | 0 |
D22,D25,D32,D36 | Interpretations' transitional provisions available to a first-time adopter: service concession arrangements, extinguishing liabilities with equity instruments, surface mine strippi | 0 |
D23 | Borrowing costs: apply AASB 123 from the transition date or from an earlier chosen date; costs capitalised under the previous GAAP before that date are kept | 0 |
D26-D30 | Severe hyperinflation: determine whether the functional currency was subject to it, and if so measure assets and liabilities at fair value as deemed cost in the opening position at | 0 |
D31 | Joint arrangements: apply the AASB 11 transition provisions at the transition date, and on moving from proportionate consolidation to the equity method test the investment for impa | 0 |
D33 | Own-use contracts: a contract to buy or sell a non-financial item that exists at the transition date may be designated at fair value through profit or loss on the facts at that dat | 0 |
D34-D35 | Revenue: the AASB 15 modified transition reliefs may be used with the date of initial application read as the start of the first reporting period, and contracts completed before th | 0 |
D5-D8 | Deemed cost: at the transition date an item of property, plant and equipment, investment property under the cost model, a right-of-use asset or a qualifying intangible asset may be | 0 |
D9-D9E | Leases: decide whether a pre-transition contract contains a lease on the facts at the transition date; a lessee may measure each lease liability at the present value of remaining p | 0 |
E1-E2,E8 | Short-term exemptions: comparatives need not comply with AASB 7 and AASB 9 for first periods beginning before 1 January 2019, with the previous GAAP basis disclosed and the catch-u | 0 |